Loading...
HomeMy WebLinkAboutLED_street_light_upgrade_project_bid_documentsLED Street Light Upgrade Project 2020 STR-07-20 CITY OF REXBURG, IDAHO CONTRACT DOCUMENTS FOR CONTRACT: STREET LIGHT LED UPGRADE PROJECT 2020 PROJECT NO.: STR-07-20 JERRY L. MERRILL, MAYOR, CITY OF REXBURG 2 Project # STR-07-20 Table of Contents INVITATION FOR BIDS (White) INSTRUCTIONS TO BIDDERS (White) PROPOSAL FORMS (Blue) PROPOSAL BID BOND NOTICE OF AWARD (White) CONTRACT FORMS (Green) PAYMENT BOND PERFORMANCE BOND CONTRACT FOR CONSTRUCTION GENERAL FORMS (Yellow) NOTICE TO PROCEED CHANGE ORDER WORK CHANGE DIRECTIVE CERTIFICATE OF SUBSTANTIAL COMPLETION APPLICATION FOR PAYMENT ISPWC DIVISION 100 – STANDARD GENERAL CONDITION OF THE CONSTRUCTION CONTRACT (White) SUPPLEMENTARY CONDITIONS (White) SPECIAL PROVISIONS (White) EXHIBIT A – Light Location Map EXHIBIT B – Light Detail Table 3 Project # STR-07-20 INVITATION FOR BIDS Separate sealed bids for LED upgrades to existing City lights will be received by the City of Rexburg, Idaho. The bids will be received at City Hall, 35 North 1st East Rexburg, ID 83440 until 3:00 P.M. on June 17, 2020. Then at said office publicly opened and read aloud shortly thereafter. The project consists of upgrading existing City of Rexburg street, path, and parking lot lights. The contractor will provide and install new LED fixtures and provide and install new LED bulbs in existing fixtures with associated electrical modifications. The CONTRACT DOCUMENTS may be examined at the following location: Rexburg City Hall 35 North 1st East Rexburg, ID 83440 Upon a fee of $25.00, a copy of the CONTRACT DOCUMENTS may be obtained by contacting the City Clerk at the above address. They are also available online at http://rexburg.org/rfps. Each Proposal must be submitted on the prescribed form and be accompanied by a certified cashier’s check or bid bond executed on the prescribed form payable to the City of Rexburg Idaho in an amount not less than 5% of the amount bid. The successful bidder will be required to furnish a performance and payment bond, each in the amount not less than 100% of the contract price. The City reserves the right to reject all proposals or any proposal not conforming to the intent and purpose of the Bid Documents. __________________________ _______________________________ June 2, 2020 to June 9, 2020 Justin Beard, P.E. Assistant Public Works Director City of Rexburg ^TOP 4 Project # STR-07-20 INSTRUCTIONS TO BIDDERS 1. FORMAT: The Contract Documents are divided into parts, divisions, and sections in keeping with accepted industry practice in order to separate categories of subject matter for convenient reference thereto. Generally, there has been no attempt to divide the Specification sections into the work performed by the various building trades, work by separate contractors, or work required for separate facilities in the project. Specifications are bound into these documents in the same order as they appear in the Table of Contents. Specification section numbers and the section page numbers are shown at the bottom of each page. Project Plans are bound separately from these Contract Documents. 2. COPIES OF BIDDING DOCUMENTS: Complete sets of bidding documents may be obtained from the City of Rexburg for the fee stated in the Invitation to Bid. Complete sets of bidding documents must be used in preparing bids; neither Owner nor Engineer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of bidding documents. The Owner in making copies of the bidding documents available on the above terms does so only for the purpose of obtaining bids on the work and does not cover a license or grant for any other use. 3. FORM OF PROPOSAL: The proposal shall be made on the bidding schedules(s) bound herein. Additional copies are available from the City upon request. The complete Contract Document volume shall be enclosed in a sealed envelope bearing the name of the Bidder and name of the project. All blanks on the bid form must be completed in ink and be printed legibly. The Contractor is required to list all subcontractors for electrical, plumbing and mechanical as called for in the Bidders Proposal in order for the bid to be responsive. Bids by corporations must be executed in the corporate name by the president or a vice-president, or other corporate officer accompanied by evidence of authority to sign, and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signatures. Bids by partnerships must be executed in the partnership name and signed by a partner whose title must appear under the signature and the official address of the partnership must be shown below the signature. All names must be printed below the signature. The bid shall contain an acknowledgment of receipt of all addenda (the numbers and dates of which must be filled in on the bid form). 4. DELIVERY OF PROPOSAL: 5 Project # STR-07-20 The proposal shall be delivered by the time and to the place stipulated in the Invitation to Bid. It is the Bidder’s sole responsibility to see that his proposal is received in proper time. Any proposal received after the scheduled closing time for receipt of proposals will be returned to the Bidder unopened. Paper bids shall be enclosed in an opaque, sealed envelope and plainly marked with the project title (and if applicable, the designated portion of the project for which the bid is submitted), name and address of the Bidder, the license number of the Bidder, and accompanied by the bid security and other required documents. If the bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with notation “Bid Enclosed” plainly marked on the face of it and addressed to: City of Rexburg 35 North 1st East Rexburg, ID 83440 Electronic bids shall state “Bid Enclosed” in the subject line and identify the project. Bids are to be submitted to the email address identified in the Invitation to Bid. 5. WITHDRAWAL OF PROPOSAL: The proposal may be withdrawn by the Bidder by means of a written request, signed by the Bidder or his properly authorized representative. Such written request must be delivered to the place stipulated in the Invitation to Bid for receipt of proposals prior to the scheduled closing time for receipt of proposals. 6. OPENING OF PROPOSALS: The proposals will be publicly opened and read at the time and place stipulated in the Invitation to Bid. 7. MODIFICATIONS AND ALTERNATIVE PROPOSALS: Unauthorized conditions, limitations, or provisions attached to a proposal will render it informal and may cause its rejection. The complete proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless called for. Oral, telephonic proposals, or modifications will not be considered. Any bidder may modify his bid by telegraphic or written communication at any time prior to the scheduled closing time for receipt of bids, provided such communication is received by the Owner prior to the closing time. The telegraphic or written communication should not reveal the bid price; it should, however, state the addition or subtraction or other modification so that the final prices or terms will not be known by the Owner until the sealed bid is open. 8. DISCREPANCIES IN PROPOSALS: 6 Project # STR-07-20 In the event there is more than one bid item in a bidding schedule, the Bidder shall furnish a price for all bid items in the schedule, and failure to do so will render the proposal informal and may cause its rejection. In the event there are unit price bid items in a bidding schedule and the “amount” indicated for a unit price bid item does not equal the product of the unit price and quantity, the unit price shall govern and the amount will be corrected accordingly. In the event there is more than one bid item in a bidding schedule and the total indicated for the schedule does not agree with the sum of the prices bid on the individual items, the prices bid on the individual items shall govern and the total for the schedule will be corrected accordingly. 9. PROPOSAL GUARANTEE: Each proposal shall be accompanied by a certified cashier’s check or Corporate bid bond in the amount stated in the Invitation to Bid. Other forms of Bonds will not be allowed. Said check or bond shall be made payable to the City of Rexburg and shall be given as a guarantee that the Bidder, if awarded the work, will enter into a contract within 10 calendar days after receipt of the contract from the Owner, and will furnish the necessary insurance certificates, faithful performance bond, and labor and material bond; each of said bonds to be in the amount stated in these Contract Documents. In case of refusal or failure to enter into said contract, the check or bid bond, as the case may be, shall be forfeited to the Owner. If the Bidder elects to furnish a bid bond as his proposal guarantee, he shall use the bid bond form bound herein, or one conforming substantially to it in form. 10. RETURN OF PROPOSAL GUARANTEE: Within 10 calendar days after award of the contract, the Owner will return the proposal guarantees accompanying such of the proposals as are not considered in making the award. All other proposal guarantees will be held until the contract has been finally executed. They will then be returned to the respective bidders whose proposals they accompany. 11. CONTRACT SECURITY: A Performance Bond and a Payment Bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the Owner will be required for the faithful performance of the contract. Attorneys-in-fact who sign Bid Bonds or Payment Bonds and Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. 12. AWARD OF CONTRACT: The Owner will award the contract, if it is to be awarded, to the lowest responsive, responsible bidder submitting a bid for the selected alternative. Any such award will be made within 15 calendar days after opening of the proposals, unless a longer waiting period before award is expressly allowed in the Invitation to Bid, or is mutually agreed to between Owner and Bidder. A contract will be awarded for each schedule or combination of schedules of work as defined in the bid schedules. 7 Project # STR-07-20 Owner reserves the right to reject any and all bids; to waiver any and all informalities not involving price, time or changes in the work, and to negotiate contract terms with the successful Bidder; and the right to disregard all nonconforming, nonresponsive, unbalanced, or conditional bids. Also, Owner reserves the right to reject the bid of any Bidder if Owner believes that it would not be in the best interest of the project to make an award to that Bidder, whether because the bid is not responsive or the Bidder is unqualified, of doubtful financial ability, or fails to meet any pertinent standard or criteria established by the Owner. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The low Bidder shall supply the names and addresses of major material suppliers and subcontractors when required to do so by the Owner. 13. EXECUTION OF CONTRACT: The Bidder to whom award is made shall execute a written contract with the Owner on the form of agreement provided, shall secure all insurance, and shall furnish all certificates and bonds required by the specifications within ten calendar days after receipt of the Notice of Award from the Owner. Failure or refusal to enter into a contract as herein provided or to conform to any of the stipulated requirements in connection therewith shall be just cause for annulment of the award and the forfeiture of the proposal guarantee. If the successful Bidder refuses or fails to execute the contract, the Owner may award the contract to the second lowest responsive responsible Bidder. If the second lowest responsive responsible Bidder refuses or failed to execute the contract, the Owner may award the contract to the third lowest responsive responsible Bidder. On the failure or refusal of such second or third lowest Bidder to execute the contract, such Bidders’ guarantees shall be likewise forfeited to the Owner. 14. DISQUALIFICATION OF BIDDERS: More than one proposal from an individual, firm, partnership, corporation, or association under the same or different names will not be considered. Reasonable grounds for believing that any Bidder is interested in more than one proposal for the work contemplated will cause the rejection of all proposals in which such Bidder is interested. If there is reason for believing the collusion exists among the Bidders, all bids will be rejected and none of the participants in such collusion will be considered in future proposals. 15. BIDDER’S EXAMINATION OF SITE: Before submitting a proposal, the Bidder shall carefully examine the Plans, Specifications, and other contract documents, and he shall visit the area for the intended construction. It will be assumed that the Bidder is familiar with existing site conditions and that he has a clear understanding of the requirements of the Contract regarding the furnishing of materials and performance of work. 16. BIDDER’S UNDERSTANDING: 8 Project # STR-07-20 Each Bidder must inform himself of the conditions relating to the execution of the work, and it is assumed that he will inspect the construction site and make himself thoroughly familiar with all work to be completed and all existing conditions. Failure to do so will not relieve the successful Bidder of his obligation to enter into a contract and complete the contemplated work in strict accordance with the Contract Documents. It shall be the Bidder’s obligation to verify for himself and to his complete satisfaction all information concerning site, subsurface conditions, utilities, and existing facilities. Bidders must satisfy themselves of the accuracy of the estimated quantities in the Bid Schedule by examination of the site and a review of the Plans and Specifications, including Addenda. After bids have been submitted, the Bidder shall not assert that there was a misunderstanding concerning the quantities of work or of the nature of the work to be done. Each Bidder shall inform himself of, and the Bidder awarded a contract shall comply with Federal, State and local laws; statutes, and ordinances relative to the execution of the work. This requirement includes, but is not limited to, protection of public and employee safety and health, environmental protection, the protection of natural resources, fire protection, burning and non- burning requirements, permits, fees, and similar subjects. 17. DOCUMENT INTERPRETATION: The Contract Documents governing the work proposed herein consist of the Plans and all material bound herewith. These Contract Documents are intended to be mutually cooperate and to provide all details reasonably required for the execution of the proposed work. Any person contemplating the submission of a proposal shall have thoroughly examined all of the various parts of these documents, and should there be any doubt as to the meaning or intent of said Contract Documents or Plans, the Bidder should request of the Engineer, in writing, an interpretation thereof. Any interpretation or change in said Contract Documents will be made only in writing, in the form of Addenda to the documents, which will be furnished to all Bidders receiving a set of the documents. Bidders shall submit with their proposals, or indicate receipt of, all Addenda. The Owner will not be responsible for any other explanation or interpretations of said documents. Any Bidder who has objections, needs clarification, or any requests for changes or modifications to these documents must make it known in writing and delivered to the Engineer no later than 12:00 noon on the day seven days prior to the scheduled bid opening. 18. LICENSE REQUIREMENTS: All Contractors, Subcontractors and Specialty Contractors are required to have a current license as a Public Works Contractor in the State of Idaho in order to submit a bid or proposal on this project. 19. PREVAILING WAGE RATES: NONE 9 Project # STR-07-20 20. ENGINEER The Engineer for this project will be the City of Rexburg, Justin Beard, Assistant Public Works Director. 21. IDAHO PREFERENCE: Section 67-2348 Idaho Code, requires that any out of state Contractor submitting a bid in the State of Idaho be subject to the preference law of the state, in which his home office is located. ^TOP 10 Project # STR-07-20 Proposal Proposal Bid Bond 11 Project # STR-07-20 PROPOSAL Contract: STREET LIGHT LED UPGRADE PROJECT 2020 Project No.: STR-07-20 To: THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF REXBURG: The undersigned, hereinafter called the Bidder, declares that the only persons or parties interested in this Proposal are those named herein; that this Proposal is in all respects fair and without fraud; that it is made without collusion with any official or employee of the City of Rexburg, Idaho; and that the Proposal is made without any connection or collusion with any person making another proposal on this contract. Bidder has carefully examined these Contract Documents; has personally inspected the site; has satisfied himself as to quantities of materials, items of equipment, and conditions of work involved. This Proposal is based upon the Contract Documents, which are hereto attached and are hereby made a part of this Proposal, and in the event of any conflict between this Proposal and the Contract documents, the terms of the latter shall be controlling. Proposal and Bid Bond Each proposal must be submitted on the prescribed form. The proposal must be accompanied by a Certified Check or Cashier's Check drawn on a bank in good standing or a Bid Bond issued by a Surety authorized to issue such bonds in the State of Idaho, all in an amount not less than Five Percent (5%) of the total amount bid. The Bid Bond shall be in substantially the same form as the sample bid bond included in the Contract Documents. Bidder agrees this bid may not be withdrawn for a period of Thirty (30) Calendar Days after the opening of bids. If this Proposal is accepted, the bidder will execute the Contract with the City of Rexburg, in the form of contract attached herewith and will further deliver to the City of Rexburg, the Payment, and Performance Bonds required herein within ten (10) days after receipt of notification of acceptance of his Proposal. Bid securities will be returned to unsuccessful bidders after the award of contract and to successful bidders upon execution of the required Contract Documents. It is agreed that the sum of five percent (5%) of the bid, deposited herewithin. accordance with the conditions of the Contract Documents, may be retained by the City of Rexburg as liquidated damages as a fair measure of the damages that the City of Rexburg will sustain if Bidder fails or refuses to enter into the Contract for the work and to furnish the Payment and Performance Bonds as specified in the Contract Document. Preference for Idaho Domiciled Bidders In determining the lowest responsible bidder, the City shall consider the preferences for Idaho domiciled public works contractors and Idaho suppliers for purchases as provided in Idaho Code Sections 67-2348 and 67-2349, as currently in force and subsequently amended. Whether a bidder is an Idaho domiciled bidder or can be considered as an Idaho domiciled bidder shall be 12 Project # STR-07-20 determined in accordance with the definitions set forth in Idaho Code Section 67-2349, as currently in force and subsequently amended. ALL BIDDERS SHALL INDICATE ON THE EXCEPTION PAGE, IN THE SPACE PROVIDED, THE BIDDER'S STATE OF DOMICILE. If a bidder is domiciled outside the State of Idaho and desires to be considered as an Idaho domiciled bidder, he shall indicate this on the exception page in the space provided. If the bidder indicates that he is domiciled outside the State of Idaho and that he desires to be considered as an Idaho domiciled bidder, he shall provide information with the bid sufficient to establish a significant Idaho economic presence as defined in Idaho Code Section 67-2349, as currently in force and subsequently amended. If the bidder is domiciled in a state with a bid preference penalty, the bidder shall provide information with the bid concerning the bidder's state of domicile, the amount of the bid preference penalty in his state and a copy of the applicable Bid Preference Penalty Statute with respect thereto. All required information shall be attached to the EXCEPTION page of these documents. FAILURE TO PROVIDE SUCH INFORMATION OR TO INDICATE THE BIDDER'S STATE OF DOMICILE MAY RESULT IN REJECTION OF THE BID. Certificates of Insurance The bidder further agrees that should his Proposal be accepted, he will furnish to the City a Certificate of Insurance, executed by insurance companies authorized to do insurance business in Idaho, certifying that policies of insurance as required by the Contract have been duly issued to the Bidder and its subcontractors where required. This paragraph applies to all insurance required by the Contract, including, but not limited to, Workmen's Compensation Insurance. 13 Project # STR-07-20 Bid Proposal Item No. Item Description Unit Bid Quantity Unit Price Bid Amount 1 Replace Cobra Head Fixture on Street Light Pole 50 Per Fixture 2 Replace Cobra Head Fixture on Traffic Signal Pole 17 Per Fixture 3 Replace 480 V Bulb in Vertical Bulb Decorative Fixture, Install Transformer, and Bypass Ballast (Porter Park, Smith Park) 33 Per Bulb 4 Replace Bulb in 125 V to 277 V Horizontal Bulb Decorative Fixture and Bypass Ballast (Parking Lots, Street Lights, Rexburg Rapids) 153 Per Bulb 5 Replace Bulb in 125 V to 277 V Vertical Bulb Decorative Fixture and Bypass Ballast (Stone Bridge, Harvest Heights, Founders Square, Canyon View, Tabernacle, Roundabout) 81 Per Bulb 6 Replace Photo Cell for LED Compatibility 159 Per Photo Cell 7 Diagnosis and Repairs of Other Electrical Issues - Force Account 1 LS $5,000 $5,000 TOTAL The Bidder agrees that the foregoing prices represent a true measure of the labor and materials required to perform the work, including all allowances for overhead and profit, for each type and unit of work called for and that he will to the extent of his Proposal, furnish all machinery, tools and other equipment necessary for construction of this project, and do the work and furnish all materials necessary to complete the work in the manner, in the time and according to the methods as specified in the Contract Documents and required by the City Engineer thereunder. The City reserves the right to increase or decrease the various classes and types of work called for as best serves the interest of the City, provided a reasonable amount of additional time is allowed for performance of such additional work. The bidder will have no claim for costs associated with decreased work amounts. Additional work will be charged to the City only after being approved by the City Engineer and shall be comparably priced with the items in the Contract. In the event the Bidder performs additional work and no additional time is first agreed 14 Project # STR-07-20 to in writing, then Bidder shall be deemed to have waived its right to additional time to perform such work. The Bidder further agrees to accept as full payment for the work herein proposed the amount computed under the provisions of the Contract Documents, and based on the foregoing unit price proposals, it being expressly understood that the listed quantities are used for purposes of bid comparison and evaluation only. Contract Time and Liquidated Damages The Bidder further agrees that should this Proposal be accepted. Bidder will complete, in all respects, the construction hereunder within 60 calendar days for Substantial Completion from the Notice to Proceed. In the event the Bidder should fail to complete the work by the time limit or extended time limit agreed upon, liquidated damages shall be paid to the City of Rexburg, Idaho, at the rate of FIVE HUNDRED DOLLARS ($500.00) PER CALENDAR DAY until the work shall have been completed as provided by the Contract Documents. The name and signature of the authorizing Bidder who is submitting this Proposal is: Signature ______________________________________________ Written ________________________________________________ Who has an Idaho Public Works Contractors License No. And Type of ____________________ and doing business at ___________________________________________________________. (Street) (City) (State and zip code) which is the address to which all communication concerned with this Proposal and with the Contract shall be sent. The Bidder acknowledges receipt of the following Addenda Numbers: _____, _____, _____, _____, _____, _____, _____, _____, _____, _____, Bidder agrees that all addenda issued are hereby made part of the Contract Documents and that his Proposal includes all impacts resulting from said addenda. ACKNOWLEDGED BY: _____________________________________________________________________________ LIST OF SUBCONTRACTORS 15 Project # STR-07-20 List below1 the name and business address of each subcontractor, not limited to those required by State Law who will perform work under this contract in excess of ten percent of the CONTRACTOR's total bid price, indicating the work to be performed and the percentage amount of the total contract to be done by such subcontractor. After the opening of Bids, no changes or substitutions will be allowed. Work to be Performed Subcontractor's License Number Percent of Total Contract Subcontractor's Name & Address2 Electrical2 Plumbing2 HVAC2 Mechanical2 Other (List) Other (List) Other (List) _____________________________________________________________________________ Notes: 1. Attach additional sheets, if required. 2. By State law, all Electrical, Plumbing, HVAC, and Mechanical subcontractors must be listed above or the bid will be non-responsive. If there is no subcontractor associated with a specific type of work, please write “None” on the associated line under “Subcontractor’s Name & Address” SUBMITTED on _____________________ 2020 Idaho Contractor’s Registration # ____________________ Employer’s Tax ID No. _____________________ If Bidder is: An Individual 16 Project # STR-07-20 By: _______________________________________________________________________________ (SEAL) (Printed Individual's Name) (signature) doing business as ____________________________________________________________________ Business address: ____________________________________________________________________ Phone No.: _________________________________________________________________________ A Partnership By: ________________________________________________________________ (SEAL) (Firm Name) ____________________________________________________________________ (signature of general partner) Business address: _____________________________________________________ Phone No.: ___________________________________________________________ A Corporation By: ______________________________________________________________ (SEAL) (Corporation Name) __________________________________________________________________ (state of incorporation) By: _______________________________________________________________ (SEAL) (signature of person authorized to sign) __________________________________________________________________ (title) (CORPORATE SEAL) Attest: ____________________________________________________________ (secretary) Business Address: ___________________________________________________ Phone No.: _________________________________________________________ Date of Qualification to do business is ____________________________________ A Joint Venture By: _______________________________________________________________ (SEAL) (name) (signature) ___________________________________________________________________ (address) By: ________________________________________________________________ (SEAL) (name) (signature) ___________________________________________________________________ (address) Phone Number and Address for receipt of official communications: _____________ ___________________________________________________________________ (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above). NOTICE: In the event Bidder allows any subcontractor not listed above to perform work on the Project, Owner may terminate the Contract and Bidder shall forfeit all rights to complete the work and all right to compensation for work performed or materials supplied by such subcontractor. EXCEPTIONS: 17 Project # STR-07-20 If the terms and conditions provided on the preceding pages cannot be met, bidders are instructed to note those terms and conditions with which they take exception and give a full explanation in the space below. IF NO EXCEPTIONS ARE TAKEN, WRITE "NONE" ______________________________________________________________________________ BIDDER'S STATE OF DOMICILE:____________________________________________ Amount of Bid Preference Penalty: _________________________ A copy of the Bid Preference Penalty Statute of the State in which Bidder is domiciled must be attached hereto. Failure to furnish information as required in section "Preference for Idaho Domiciled Bidders" may result in rejection of Bid. GENERAL INFORMATION Furnish the following information. Failure to comply with this requirement will render the Bid incomplete and may cause its rejection. Attach additional sheets as required. 1. Contractor's name and address (mail and business): _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ 2. Contractor's telephone and fax numbers: ( ) ______________, ( ) _____________ 3. Contractor's State License: Primary Classification: ______________________________ State License No.: ________________________________________________________ Supplemental Classification held, if any: ______________________________________ _______________________________________________________________________ Bid Limit: ______________________________________________________________ 4. Number of years as a contractor in construction work of this type: __________________ 5. Names and titles of all officers of CONTRACTOR's firm: _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ 6. Name of person who inspected site of proposed work for your firm: Name: _______________________________ Date of Inspection: _________________ 18 Project # STR-07-20 7. Name, address, and telephone number of surety company and agent who will provide required bonds on this contract: Surety Company: _______________________________________________ Mailing Address: _______________________________________________ City, State, Zip: _________________________________________________ Contact: _____________________________________________________ Phone: ( )_______________________________________________ 19 Project # STR-07-20 BID BOND BIDDER (Name and Address): _________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ SURETY (Name and Address of Principal Place of Business): _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ OWNER (Name and Address): _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ BID BID DUE DATE: _________________________ PROJECT (Brief Description Including Location): ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ BOND BOND NUMBER: _____________________________________ DATE (Not later than Bid due date): _______________________ PENAL SUM: ________________________________________ ________________________________ (Words) (Figures) IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative. BIDDER SURETY _______________________________________ (Seal) _____________________________________ (Seal) Bidder's Name and Corporate Seal Surety's Name and Corporate Seal By: ___________________________________ By: _________________________________ Signature and Title Signature and Title (Attach Power of Attorney) Attest: ________________________________ Attest: _______________________________ Signature and Title Signature and Title _____________________________________________________________________________ Note: (1) Above addresses are to be used for giving the required notice. (2) Any singular reference to Bidder, Surety, OWNER or another party shall be considered plural where applicable. 20 Project # STR-07-20 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond. 2. The default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents. 3. This obligation shall be null and void if: 3.1. OWNER accepts Bidder's Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents, or 3.2. All Bids are rejected by OWNER, or 3.3. OWNER fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent. 6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by the United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned. 9. The surety shall cause to be attached to this Bond a current and effective Power or Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of a said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect. 11. The term "Bid" as used herein includes a Bid, offer or proposal as applicable. ^TOP ^TOP 21 Project # STR-07-20 NOTICE OF AWARD DATE: __________________ TO: _______________________________ ADDRESS: ________________________ __________________________________ Contract: STREET LIGHT LED UPGRADE PROJECT 2020 Project No: STR-07-20 You are notified that your Bid dated _____________________, 2020. for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded the Contract for _____________________________. The Contract Price of your Contract is ________________________________________. Three (3) copies of each of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions precedent within 15 days of the date you receive this Notice of Award. 1. Deliver to the OWNER Three (3) fully executed counterparts of the Contract Documents. [Each of the Contract Documents must bear your signature on Contract – pg 4.] 2. Deliver with the executed Contract Documents the Contract security (Payment and Performance Bonds) as specified. 3. (List other conditions precedent). None____________________________________________________________________ Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid in default, to annul this Notice of Award and to declare your Bid security forfeited. Within ten days after you comply with the above conditions, OWNER will return to you one fully executed counterpart of the Contract Documents. Jerry L. Merrill By: __________________________________________________________________ Mayor, City of Rexburg ^TOP 22 Project # STR-07-20 Contract Forms Contract for Construction Performance Bond Payment Bond 23 Project # STR-07-20 CONTRACT FOR CONSTRUCTION For: STREET LIGHT LED UPGRADE PROJECT 2020 Project No.: STR-07-20 THIS CONTRACT, made and entered into this _____day of ______________, 2020, by and between the City of Rexburg, Idaho, hereinafter called City, ____________________, hereinafter called Contractor; WITNESSETH THAT, the City and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Contract Documents Contractor agrees, at his own proper cost and expense, to do all the work and furnish all the materials, tools, labor and all appliances, machinery, and appurtenances for the construction of the Project in accordance with the Proposal made by the Contractor on the _____ day of ______________, 2020, all in full compliance with the Contract Documents referred to herein. The "INVITATION FOR BIDS", the signed copy of the "PROPOSAL", the "SPECIAL PROVISIONS", and the fully executed "PAYMENT BOND" and "PERFORMANCE BOND" are hereby referred to and by reference all made a part of this Contract, as fully and completely as if the same were fully set forth herein. Contract Time and Payment Contractor agrees to complete the work within the time specified herein and to accept as full payment for all work, materials or services rendered on or delivered to the Project, an amount determined by the unit price method set forth in the Contract Documents and the Proposal, or the lump sum amount set forth in the Proposal. All work contemplated in the Proposal and the Contract Documents will be completed within 30 calendar days for Substantial Completion from the Notice to Proceed. Contract Execution and Bonds The Contractor agrees to execute this Contract and to deliver to the City of Rexburg, security for faithful performance of the Contract in the amount of one hundred percent (100%) of the contract amount and security for the protection of persons supplying labor or materials for the Contract in the amount of one hundred percent (100%) of the contract amount within ten (10) days after receipt of notification of acceptance of his Proposal. Such security may be in the form of a Certified Check or Cashier's Check drawn on a bank in good standing; performance Bond and Payment Bond in the form specified in the Contract Documents and issued by a Surety authorized to issue such bonds in the State of Idaho. 24 Project # STR-07-20 Certificates of Insurance Contractor agrees to furnish to the City, Certificate or Certificates of Insurance, executed by insurance companies authorized to do insurance business in Idaho, certifying that policies of insurance as required by the Contract have been duly issued to the Contractor and its subcontractors where required. This paragraph applies to all insurance required by the Contract, including, but not limited to, Workmen's Compensation Insurance. Payment of Taxes. Excises and License Fees Pursuant to the provisions of Section 63-1503 of the Idaho Code, the Contractor, in consideration of securing the business of erecting or constructing public works in the State of Idaho, recognizing that the business in which the Contractor is engaged is of a transitory character, and that in the pursuit thereof, the Contractor's property used therein may be without the State of Idaho when taxes, excises, or license fees to which the Contractor is liable become payable, agrees: a) To pay promptly when due all taxes (other than on real property), excises, and license fees due to the State of Idaho, its subdivisions, and municipal and quasi-municipal corporations therein, accrued or accruing during the term of this Contract, whether or not the same shall be payable at the end of such term; b) That if the said taxes, excises, and license fees are not payable at the end of said term, but liability for the payment thereof exists, even though the same constitute liens upon his property, to secure the same to the satisfaction of the respective officers charged with the collection thereof; c) That, in the event of the Contractor's default in the payment or securing of such taxes, excises, and license fees, to consent that the Owner may withhold from any payment due the Contractor under the Contract the estimated amount of such accrued and accruing taxes, excises, and license fees for the benefit of all taxing units to which said Contractor is liable; d) That pursuant to the provisions of Section 63-1504 of the Idaho Code, the Contractor shall furnish the Owner evidence that the Contractor has paid all taxes, excises, and license fees due to the State of Idaho and its taxing units, due and payable during the term of the Contract for such construction, and that the Contractor has secured all such taxes, excises and license fees liability for the payment of which has accrued during the term of such Contract, notwithstanding that they may not yet be due or payable. Applications for Payments If Contractor faithfully performs the work herein embraced, in accordance with the Contract Documents, the City agrees to pay to the Contractor the amounts set forth in the Proposal, and the Contract Documents, in the manner and at the times provided in the Contract Documents. 25 Project # STR-07-20 The City must receive a Public Works Contract Tax Release fully executed by the State of Idaho, Department of Revenue and Taxation prior to payment of retainage to the Contractor. Liquidated Damages In the event the Contractor fails to complete the work within the time limit or extended time limit agreed upon, as more particularly set forth in the Contract Documents, liquidated damages shall be paid to the City of Rexburg, Idaho, at the rate of FIVE HUNDRED DOLLARS ($500.00) PER CALENDAR DAY until the work has been finished as provided in the Contract Documents. Contractor acknowledges that such amount represents a fair and reasonable estimate of the damages Owner will suffer in the event of any delay in the performance of the work and that such amount does not constitute a penalty. Contractor further agrees that in the event Owner contributes to any delay, such liquidated damages shall be reduced only by the number of days fairly apportioned to such owner-caused delay, and owner may assess and collect liquidated damages for all remaining delay caused by Contractor. Warranty The Contractor warrants all defects in the workmanship or materials performed or furnished under this Contract for which there are no specifications or specific provisions in the Contract Documents for a period of one (1) year after the acceptance thereof by the City. (Cont. on next page) 26 Project # STR-07-20 IN WITNESS WHEREOF, the parties hereto, each herewith subscribe the same this ____ day of _________, 2020. CITY OF REXBURG, IDAHO (SEAL) __________________________________ Mayor Attest:____________________________ City Clerk __________________________________ (SEAL) Contractor __________________________________ (Signature) __________________________________ (Title) Attest: ___________________________ (Secretary) __________________________________ (Witness) _______________________________________________________________________ (Complete business address) ^TOP 27 Project # STR-07-20 Payment Bond Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. _____________________________________________________________________________________________ CONTRACTOR (Name and Address): SURETY (Name and Address of Principal Place of Business): OWNER (Name and Address): CONTRACT Date: Amount: Description (Name and Location): BOND Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: _____________________________________ Signature: ___________________________ Name and Title: Name and Title: (Attach Power of Attorney) (Space is provided below for signatures of additional parties, if required.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: _____________________________________ Signature: ___________________________ Name and Title: Name and Title: 28 Project # STR-07-20 EJCDC No. 1910-28-B (1996 Edition) Originally prepared through the joint efforts of the Surety Association of America, Engineers Joint Contract Documents Committee, the Associated General Contractors of America, the American Institute of Architects, the American Subcontractors Association, and the Associated Specialty Contractors. 1. The CONTRACTOR and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the OWNER to pay for labor, materials and equipment furnished for use in the performance of the Contract, which is incorporated herein by reference. 2. With respect to the OWNER, this obligation shall be null and void if the CONTRACTOR: 2.1.Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2.Defends, indemnifies and holds harmless the OWNER from all claims, demands, liens or suits by any person or entity who furnished labor, materials or equipment for use in the performance of the Contract, provided the OWNER has promptly notified the CONTRACTOR and the Surety (at the addresses described in paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the CONTRACTOR and the Surety, and provided there is no OWNER Default. 3. With respect to Claimants, this obligation shall be null and void if the CONTRACTOR promptly makes payment, directly or indirectly, for all sums due. 4. The Surety shall have no obligation to Claimants under this Bond until: 4.1.Claimants who are employed by or have a direct contract with the CONTRACTOR have given notice to the Surety (at the addresses described in paragraph 12) and sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 4.2. Claimants who do not have a direct contract with the CONTRACTOR: 1.Have furnished written notice to the CONTRACTOR and sent a copy, or notice thereof, to the OWNER, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and 2.Have either received a rejection in whole or in part from the CONTRACTOR, or not received within 30 days of furnishing the above notice any communication from the CONTRACTOR by which the CONTRACTOR had indicated the claim will be paid directly or indirectly; and 3.Not having been paid within the above 30 days, have sent a written notice to the Surety and sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the CONTRACTOR. 5. If a notice required by paragraph 4 is given by the OWNER to the CONTRACTOR or to the Surety, that is sufficient compliance. 6. When the Claimant has satisfied the conditions of paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.1.Send an answer to the Claimant, with a copy to the OWNER, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 6.2.Pay or arrange for payment of any undisputed amounts. 7. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 8. Amounts owed by the OWNER to the CONTRACTOR under the Contract shall be used for the performance of the Contract and to satisfy claims, if any, under any Performance Bond. By the CONTRACTOR furnishing and the OWNER accepting this Bond, they agree that all funds earned by the CONTRACTOR in the performance of the Contract are dedicated to satisfy obligations of the CONTRACTOR and the Surety under this Bond, subject to the OWNER's priority to use the funds for the completion of the Work. 9. The Surety shall not be liable to the OWNER, Claimants or others for obligations of the CONTRACTOR that are unrelated to the Contract. The OWNER shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10. The Surety hereby waives notice of any change, including changes of time, to the Contract or to related Subcontracts, purchase orders and other obligations. 11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the Work or part of the Work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by paragraph 4.1 or paragraph 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to the Surety, the OWNER or the CONTRACTOR shall be mailed or delivered to the addresses shown on the signature page. Actual receipt of notice by Surety, the OWNER or the CONTRACTOR, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the Contract was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is, that this Bond shall be construed as a statutory Bond and not as a common law bond. 14. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, the CONTRACTOR shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15. DEFINITIONS 15.1.Claimant: An individual or entity having a direct contract with the CONTRACTOR or with a Subcontractor of the CONTRACTOR to furnish labor, materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Contract, architectural and engineering services required for performance of the Work of the CONTRACTOR and the CONTRACTOR's Subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished. 15.2.Contract: The agreement between the OWNER and the CONTRACTOR identified on the signature page, including all Contract Documents and changes thereto. 29 Project # STR-07-20 15.3.OWNER Default: Failure of the OWNER, which has neither been remedied nor waived, to pay the CONTRACTOR as required by the Contract or to perform and complete or comply with the other terms thereof. ^TOP 30 Project # STR-07-20 Performance Bond Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. _____________________________________________________________________________________________ CONTRACTOR (Name and Address): SURETY (Name and Address of Principal Place of Business): OWNER (Name and Address): CONTRACT Date: Amount: Description (Name and Location): BOND Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: _______________________________ Signature: __________________________ Name and Title: Name and Title: (Attach Power of Attorney) (Space is provided below for signatures of additional parties, if required.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: _______________________________ Signature: __________________________ Name and Title: Name and Title: 31 Project # STR-07-20 1. The CONTRACTOR and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Contract, which is incorporated herein by reference. 2. If the CONTRACTOR performs the Contract, the Surety and the CONTRACTOR have no obligation under this Bond, except to participate in conferences as provided in paragraph 3.1. 3. If there is no OWNER Default, the Surety's obligation under this Bond shall arise after: 3.1.The OWNER has notified the CONTRACTOR and the Surety at the addresses described in paragraph 10 below, that the OWNER is considering declaring a CONTRACTOR Default and has requested and attempted to arrange a conference with the CONTRACTOR and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Contract. If the OWNER, the CONTRACTOR and the Surety agree, the CONTRACTOR shall be allowed a reasonable time to perform the Contract, but such an agreement shall not waive the OWNER's right, if any, subsequently to declare a CONTRACTOR Default; and 3.2.The OWNER has declared a CONTRACTOR Default and formally terminated the CONTRACTOR's right to complete the Contract. Such CONTRACTOR Default shall not be declared earlier than twenty days after the CONTRACTOR and the Surety have received notice as provided in paragraph 3.1; and 3.3.The OWNER has agreed to pay the Balance of the Contract Price to: 3.3.1. The Surety in accordance with the terms of the Contract; 3.3.2Another contractor selected pursuant to paragraph 4.3 to perform the Contract. 4. When the OWNER has satisfied the conditions of paragraph 3, the Surety shall promptly and at the Surety's expense take one of the following actions: 4.1.Arrange for the CONTRACTOR, with consent of the OWNER, to perform and complete the Contract; or 4.2.Undertake to perform and complete the Contract itself, through its agents or through independent contractors; or 4.3.Obtain bids or negotiated proposals from qualified contractors acceptable to the OWNER for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution by the OWNER and the contractor selected with the OWNER's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the Bonds issued on the Contract, and pay to the OWNER the amount of damages as described in paragraph 6 in excess of the Balance of the Contract Price incurred by the OWNER resulting from the CONTRACTOR Default; or 4.4.Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances; 4.4.1After investigation, determine the amount for which it may be liable to the OWNER and, as soon as practicable after the amount is determined, tender payment therefor to the OWNER; or 4.4.2Deny liability in whole or in part and notify the OWNER citing reasons therefor. 5. If the Surety does not proceed as provided in paragraph 4 with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the OWNER to the Surety demanding that the Surety perform its obligations under this Bond, and the OWNER shall be entitled to enforce any remedy available to the OWNER. If the Surety proceeds as provided in paragraph 4.4, and the OWNER refuses the payment tendered or the Surety has denied pliability, in whole or in part, without further notice the OWNER shall be entitled to enforce any remedy available to the OWNER. 6. After the OWNER has terminated the CONTRACTOR's right to complete the Contract, and if the Surety elects to act under paragraph 4.1, 4.2, or 4.3 above, then the responsibilities of the Surety to the OWNER shall not be greater than those of the CONTRACTOR under the Contract, and the responsibilities of the OWNER to the Surety shall not be greater than those of the OWNER under the Contract. To a limit of the amount of this Bond, but subject to commitment by the OWNER of the Balance of the Contract Price to mitigation of costs and damages on the Contract, the Surety is obligated without duplication for: 6.1.The responsibilities of the CONTRACTOR for correction of defective Work and completion of the Contract; 6.2.Additional legal, design professional and delay costs resulting from the CONTRACTOR's Default, and resulting from the actions or failure to act of the Surety under paragraph 4; and 6.3.Liquidated damages, or if no liquidated damages are specified in the Contract, actual damages caused by delayed performance or non-performance of the CONTRACTOR. 7. The Surety shall not be liable to the OWNER or others for obligations of the CONTRACTOR that are unrelated to the Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the OWNER or its heirs, executors, administrators, or successors. 8. The Surety hereby waives notice of any change, including changes of time, to the Contract or to related subcontracts, purchase orders and other obligations. 9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the Work or part of the Work is located and shall be instituted within two years after CONTRACTOR Default or within two years after the CONTRACTOR ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 10. Notice to the Surety, the OWNER or the CONTRACTOR shall be mailed or delivered to the address shown on the signature page. 11. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the Contract was be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12. Definitions. 12.1Balance of the Contract Price: The total amount payable by the OWNER to the CONTRACTOR under the Contract after all proper adjustments have been made, including allowance to the CONTRACTOR of any amounts received or to be received by the OWNER in settlement of insurance or other Claims for damages to which the CONTRACTOR is entitled, reduced by all valid and proper payments made to or on behalf of the CONTRACTOR under the Contract. 12.2.Contract: The agreement between the OWNER and the CONTRACTOR identified on the signature page, including all Contract Documents and changes thereto. 12.3.CONTRACTOR Default: Failure of the CONTRACTOR, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Contract. 12.4. OWNER Default: Failure of the OWNER, which has neither been remedied nor waived, to pay the CONTRACTOR as required by the Contract or to perform and complete or comply with the other terms thereof. ^TOP 32 Project # STR-07-20 General Forms Notice to Proceed Change Order Work Change Directive Certificate of Substantial Completion Application for Payment 33 Project # STR-07-20 NOTICE TO PROCEED Date: _________________ TO: _________________________________ ADDRESS: ___________________________ _____________________________________ Contract: STREET LIGHT LED UPGRADE PROJECT 2020 Project No: STR-07-20 You are notified that the Contract Times under the above contract will commence to run on ________________. By that date, you are to start performing your obligations under the Contract Documents. All work contemplated in the Proposal and the Contract Documents will be completed by ________________________. In accordance with Article 4 of the Agreement the date of Substantial Completion is ___________________________and the date of readiness for final payment is __________________________. Before you may start any Work at the Site, paragraph 2.05.C of the General Conditions provides that you and Owner must each deliver to the other (with copies to Engineer and other identified additional insureds) certificates of insurance which each is required to purchase and maintain in accordance with the Contract Documents. Also, before you may start any Work at the Site, you must ________________________________________________________________________ ________________________________________________________________________ City of Rexburg _______________________________________________ (OWNER) By: _________________________________________________________________ (AUTHORIZED SIGNATURE) Mayor _____________________________________________________ (TITLE) ^TOP 34 Project # STR-07-20 CHANGE ORDER No. _________ DATE OF ISSUANCE : ___________________ EFFECTIVE DATE: __________________ OWNER: City of Rexburg CONTRACTOR: Contract: Project: OWNER's Contract No.: ENGINEER's Contract No. __________NA_____________ ENGINEER: You are directed to make the following changes in the Contract Documents: Description: Reason for Change Order: Attachments: CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: __________________________ Ready for final payment: __________________________ (days or dates) Net Increase (Decrease) from previous Change Orders No. ___ to ___: $______________________ Net change from previous Change Orders No. ___ to No. ___: Substantial Completion: __________________________ Ready for final payment: __________________________ (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: __________________________ Ready for final payment: __________________________ (days or dates) Net decrease of this Change Order: __________________________ Net increase (decrease) this Change Order: Substantial Completion: __________________________ Ready for final payment: __________________________ (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: __________________________ Ready for final payment: __________________________ (days or dates) APPROVED: ACCEPTED: By: _______________________ By: ______________________ OWNER (Authorized Signature) CONTRACTOR (Authorized Signature) Date: ______________________ Date: _____________________ 35 Project # STR-07-20 CHANGE ORDER INSTRUCTIONS ______________________________________________________________________________ A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. ^TOP 36 Project # STR-07-20 WORK CHANGE DIRECTIVE No. __________________ DATE OF ISSUANCE _________________ EFFECTIVE DATE ___________________ OWNER: _____________________________________________________________________________________ CONTRACTOR: ______________________________________________________________________________ Contract: _____________________________________________________________________________________ Project: ______________________________________________________________________________________ OWNER's Contract No. ___________________ ENGINEER's Project No. _________________ You are directed to proceed promptly with the following change(s): Description: Purpose of Work Change Directive: Attachments: (List documents supporting change) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents. Method of determining change in Contract Price: □ Unit Prices □ Lump Sum □ Cost of the Work ______________________ Estimated increase (decrease) in Contract Price: $_____________________________________. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Estimated increase (decrease) in Contract Times: Substantial Completion: ______ days; Ready for final payment: ______ days. ______________________________________________________________________________ AUTHORIZED: _______________________________________ OWNER By: ___________________________________ EJCDC No. 1910-8-F (1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. 37 Project # STR-07-20 WORK CHANGE DIRECTIVE INSTRUCTIONS _____________________________________________________________________________ A. GENERAL INFORMATION This document was developed for use in situations involving changes in the Work which, if not processed expeditiously, might delay the Project. These changes are often initiated in the field and may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive to proceed with Work that may be included in a subsequent Change Order. For supplemental instructions and minor changes not involving a change in the Contract Price or the Contract Times a Field Order should be used. B. COMPLETING THE WORK CHANGE DIRECTIVE FORM Engineer initiates the form, including a description of the items involved and attachments. Based on conversations between Engineer and Contractor, Engineer completes the following: METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to be used in determining the final cost of Work involved and the estimated net effect on the Contract Price. If the change involves an increase in the Contract Price and the estimated amount is approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the estimated price or Contractor may stop the changed Work when the estimated time is reached. If the Work Change Directive is not likely to change the Contract Price, the space for estimated increase (decrease) should be marked "Not Applicable". Once Engineer has completed and signed the form, all copies should be sent to Owner for authorization because Engineer alone does not have authority to authorize changes in Price or Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by Change Order signed by Owner and Contractor with Engineer's recommendation. Paragraph 10.03.A.2 of the General Conditions requires that a Change Order be initiated and processed to cover any undisputed sum or amount of time for Work actually performed pursuant to this Work Change Directive. Once the Work covered by this directive is completed or final cost and times are determined, Contractor should submit documentation for inclusion in a Change Order. THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT PRICE OR CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED PROMPTLY. ^TOP 38 Project # STR-07-20 CERTIFICATE OF SUBSTANTIAL COMPLETION DATE OF ISSUANCE ____________________ OWNER: _____________________________________________________________________________________ CONTRACTOR: ______________________________________________________________________________ Contract: _____________________________________________________________________________________ Project: ______________________________________________________________________________________ OWNER's Contract No. ___________________ ENGINEER's Project No. __________________________ This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To_____________________________________________________________________________ OWNER And To _________________________________________________________________________ CONTRACTOR The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on ______________________________ DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within _______ days of the above date of Substantial Completion. EJCDC No. 1910-8-D (1996 Edition) Prepared by the Engineers' Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: OWNER: _____________________________________________________________________ _____________________________________________________________________________ 39 Project # STR-07-20 _____________________________________________________________________________ CONTRACTOR: _______________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ The following documents are attached to and made a part of this Certificate: [For items to be attached see definition of Substantial Completion as supplemented and other specifically noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents. Executed by ENGINEER on _______________________ Date ___________________________________________ ENGINEER By: __________________________________________ (Authorized Signature) CONTRACTOR accepts this Certificate of Substantial Completion on ________________________ Date __________________________________________ CONTRACTOR By: __________________________________________ (Authorized Signature) OWNER accepts this Certificate of Substantial Completion on _______________________ Date _______________________________________ OWNER By: _______________________________________ (Authorized Signature) ^TOP 40 Project # STR-07-20 APPLICATION FOR PAYMENT NO. ________ To: _________________________________________________________________________________(OWNER) From: _________________________________________________________________________(CONTRACTOR) Contract: _____________________________________________________________________________________ Project: ______________________________________________________________________________________ OWNER's Contract No.: _____________________ ENGINEER's Project No.: _____________________________ For Work accomplished through the date of: ____________________________ 1. Original Contract Price: $_____________________ 2. Net change by Change Orders and Written Amendments (+ or -): $_____________________ 3. Current Contract Price (1 plus 2): $_____________________ 4. Total completed and stored to date: $_____________________ 5. Retainage (per Agreement): _____% of completed Work: $____________________ _____% of stored material: $____________________ Total Retainage: $_____________________ 6. Total completed and stored to date less retainage (4 minus 5): $_____________________ 7. Less previous Application for Payments: $_____________________ 8. DUE THIS APPLICATION (6 MINUS 7): $_____________________ Accompanying Documentation: Schedule of Values CONTRACTOR'S Certification: The undersigned CONTRACTOR certifies that (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied on account to discharge CONTRACTOR’s legitimate obligations incurred in connection with Work covered by prior Applications for Payment numbered 1 through _____ inclusive; (2) title of all Work, materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond acceptable to OWNER indemnifying OWNER against any such Lien, security interest or encumbrance); and (3) all Work covered by this Application for Payment is in accordance with the Contract Documents and not defective. Dated ______________________ _______________________________________________________________ CONTRACTOR By: State of ______________________________ County of ____________________________ Subscribed and sworn to before me this _____ day of __________________, ________ ____________________________________ Notary Public My Commission expires: _______________ Payment of the above AMOUNT DUE THIS APPLICATION is recommended. Dated ______________________ ______________________________________________________________ ENGINEER By: EJCDC No. 1910-8-E (1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specification Institute. 41 Project # STR-07-20 APPLICATION FOR PAYMENT INSTRUCTIONS ______________________________________________________________________________ A. GENERAL INFORMATION The sample form of Application for Payment is intended as a guide only. Many projects require a more extensive form with space for numerous items, descriptions of Change Orders, identification of variable quantity adjustments, summary of materials and equipment stored at the site and other information. It is expected that a separate form will be developed by Engineer and Contractor at the time Contractor's Application for Payment is finalized. Note also that the format for retainage must be changed if the Contract permits (or the law provides), and Contractor elects to deposit securities in lieu of retainage. Refer to Article 14 of the General Conditions for provisions concerning payments to Contractor. B. COMPLETING THE FORM The Schedule of Values, submitted and approved as provided in paragraphs 2.05.B.3 and 2.07 of the General Conditions, should be reproduced as appropriate in the space indicated on the Application for Payment form. Note that the cost of materials and equipment is often listed separately from the cost of installation. Also, note that each Unit Price is deemed to include Contractor's overhead and profit. All Change Orders affecting the Contract Price should be identified and included in the Schedule of Values as required for progress payments. The form is suitable for use in the Final Application for Payment as well as for Progress Payments; however, the required accompanying documentation is usually more extensive for final payment. All accompanying documentation should be identified in the space provided on the form. C. LEGAL REVIEW All accompanying documentation of a legal nature, such as Lien waivers, should be reviewed by an attorney, and Engineer should so advise Owner ^TOP 42 Project # STR-07-20 ISPWC DIVISION 100 – STANDARD GENERAL CONDITION OF THE CONSTRUCTION CONTRACT A copy of the Standard General Conditions can be found at the following location. These conditions are considered to be incorporated into the contract by reference: https://www.rexburg.org/sites/default/files/fileattachments/public_works/page/10759/2017_edition_i spwc.pdf ^TOP 43 Project # STR-07-20 SUPPLEMENTARY CONDITIONS INTRODUCTORY STATEMENT These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction and other provisions of the Contract Documents as indicated below. All provisions which are not so amended or supplemented remain in full force and effect. The terms used in these Supplementary Conditions which are defined in the Standard General Conditions of the Construction Contract have the meanings assigned to them in the General Conditions. SC 1. Add the following term to definition to Article 1: Contingency amount – Moneys allocated by OWNER but no payable to CONTRACTOR for the WORK described in the Contract Documents. SC 2. Add the following to paragraph 2.6.1 2.6.1 This estimated progress schedule shall be in the form of the bar graph or CPM, in reproducible form. The OWNER shall approve the form and the content for adequacy. SC 3.7 Add paragraph 3.7 to the General Conditions as follows: Priority of Provisions of Contract Documents: 3.7 In the event that any provision of any one Contract Document conflicts with the provision of another Contract, the provision in that Contract Document first listed below shall govern, except as otherwise specifically stated: 1. Agreement 2. Addenda to Contract Documents 3. Remaining Legal and Procedural Documents a. Bid Form b. Invitation to Bid c. Instructions to Bidders 4. Detailed Specification Requirements (Divisions 1 thru 16 inclusive). 44 Project # STR-07-20 5. Drawings 6. General Conditions of the Contract 7. Bonds a. Performance Bond b. Labor and Materials Payment Bond c. Proposal Guaranty SC 5.3 The limits of liability for the insurance required by paragraph 5.3 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations: 5.3.1 and 5.3.2 Workers’ Compensation, etc., under paragraphs 5.3.1 and 5.3.2 of the General Conditions 1. State: Statutory 2. Applicable Federal (e.g. Statutory Longshoreman’s): 3. Employer’s Liability Statutory 5.3.3, 5.3.4 and 5.3.6 Comprehensive General Liability (under paragraphs 5.13 through 5.3.6 if the General Conditions): 1. Bodily Injury (including completed operations products liability): $1,000,000 Each Occurrence $1,000,000 Annual Aggregate Property Damage $1,000,000 Each Occurrence $1,000,000 Annual Aggregate or combined single limit of $3,000,000 2. Property Damage Liability Insurance will provide Explosion, Collapse, and Underground coverage where applicable. 3. Personal Injury, with employment exclusion deleted: $1,000,000 Annual Aggregate 5.3.7 Comprehensive Automobile Liability: Bodily Injury: 3,000,000 Each Person 3,000,000 Each Occurrence 45 Project # STR-07-20 Property Damage: Statutory Each Occurrence or combined single limit $1,000,000 Add the following paragraph: 5.3.8 CONTRACTOR’S Liability Insurance shall specifically cover claims under GC 5,3.6 for damages caused by CONTRACTOR’S equipment, material, tools and property of OWNER or other contractors employed on the project by the OWNER. 5.3.8 The CONTRACTOR’S liability insurance shall include the City of Rexburg under the policy for this project only. SC 5.4 1. Bodily Injury $3,000,000 Each Occurrence $3,000,000 Annual Aggregate SC 6.8 Add two new paragraphs immediately after paragraph 6.8.2 of the General Conditions which is to read as follows: 6.8.3 CONTRACTOR shall not be permitted, without the express written authorization of OWNER, to subcontract more than fifty percent (50%) of the CONTRACTOR’S work. Said percentage shall be computed by dividing the summation of the total cost for all the subcontracted work by the CONTRACTOR’S price or the summation of all total man hours for all subcontracted work by the summation of all total man hours required for CONTRACTOR’S total man hours, whichever is less. SC 6.1.3 Amend the first sentence with the following: 6.1.3 Unless otherwise provided in Contract CONTRACTOR shall obtain and pay Administrative Provisions, permits and licenses. SC 6.19 Following the first paragraph, add the following: CONTRACTOR shall provide the OWNER five (5) copies of all vendor information on items purchased and installed by CONTRACTOR. All vendor information shall be bound in binder as approved by OWNER and submitted to OWNER prior to 46 Project # STR-07-20 CONTRACTOR’S application for final payment. Information required shall include, but not necessarily be limited to drawings, replacement lists, vendor’s name, address, and telephone number, operating instructions, warranty and location of service centers. SC 6.30 Replace paragraph 6.30 with the following: Indemnification: 6.30 The CONTRACTOR shall hold harmless, indemnify and defend the OWNER, their officers, employees and agents, from any and all liability claims, losses or damage arising or alleged to arise from the performance of the work described herein, but not including the sole negligence of the OWNER. SC 11.2 Revise paragraph 11.2 as follows: Delete reference to thirty (30) days for making claim and replace with seven (7) days. SC 11.6.1 Delete “or if none can be agreed upon.” SC 11.6.2 Delete in its entirety. SC 11.9.3 Paragraph 11.9.3 of the General Conditions is hereby deleted in its entirety and the following is substituted in its place: “The united price of an item of Unit Price Work shall be subject to reevaluation and adjustment under the following conditions: 11.9.3.1 If the total cost of a particular item of Unit Price Work amounts to 15 percent or more of the Contract Price and the variation in the quantity of the particular item of Unit Price Work performed by Contractor differs by more than 25 percent from the estimated quantity of such item indicated in the Agreement; then either OWNER or CONTRACTOR may make a claim for an adjustment in the Contract Price in accordance with Article 11 if the parties are unable to agree as to the effect of any such variations in the quantity of Unity Price Work performed.” 47 Project # STR-07-20 SC 12.1 Revise paragraph 12.1 as follows: 12.1 Delete reference to thirty (30) days for making claim and replace with seven (7) days. SC 14.2 14.2 Delete the last sentence and insert: “Retainage will be 5% of the amount paid.” SC 14.4 Amend the third sentence of paragraph 14.4 of the General Conditions to read as follows: Thirty days after…by OWNER to CONTRACTOR SC 14.5 Add the following paragraphs immediately after paragraph 14.5 of the General Conditions to read as follows: 14.5 The OWNER may retain five (5) percent of the amount of each payment until final completion and acceptance of all work covered by the CONTRACT DOCUMENTS. When the work is substantially complete (operational or beneficial occupancy), the retained amount may be further reduce below five (5) percent to only that amount necessary to assure completion. On completion and acceptance of a part of the work on which the price is stated separately in the Contract Documents, payment may be in full, including retained percentages, less authorized deductions. SC 14.7.5 Add a new paragraph immediately after paragraph 14.7.4 of the General Conditions which is to read as follows: 14.7.5 If the OWNER fails to make payment thirty (30) days after approval by the ENGINEER, in addition to other remedies available to the CONTRACTOR, there shall be added to each such payment interest at the maximum legal rate commencing on the first day after said payment is due and continuing until the payment is received by the CONTRACTOR. SC 15.2 Add the additional paragraphs after paragraph 15.2.9 of the General Conditions which is to read as follows: 48 Project # STR-07-20 15.2.10 If, no through no act or fault of the CONTRACTOR, the WORK is stopped for a period of more than ninety (90) days by the OWNER or under an order of court or other public authority, or the ENGINEER fails to act on any request for payment within ninety (90) days after it is submitted, or the OWNER fails to pay the CONTRACTOR substantially the sum approved by the ENGINEER within thirty (30) days of its approval and presentation, then the CONTRACTOR may, after ten (10) days from delivery of a WRITTEN NOTICE to the OWNER terminate the CONTRACT and recover from the OWNER payment for all WORK executed and all expenses sustained. In addition and in lieu of terminating the CONTRACT, if the OWNER has failed to act on a request for payment or if the OWNER has failed to make any payment as aforesaid, the CONTRACTOR may, upon ten (10) days written notice to the OWNER, stop the WORK until all amounts then due, in which event and upon resolution of the WORK CHANGE ORDERS shall be issued for adjusting to the CONTRACT PRICE or extending the CONTRACT TIME, or both, to compensate for the costs and delays attributable to stoppage of the WORK. 15.2.11 If the performance of all or any portion of the WORK is suspended, delayed, or interrupted as a result of a failure of the OWNER to act within the time specified in the CONTRACT DOCUMENTS, or if no time is specified, within a reasonable time, an adjustment in the CONTRACT PRICE or an extension of the CONTRACT TIME, or both, shall be made by CHANGE ORDER to compensate the CONTRACTOR for the costs and delays necessarily caused by the failure of the OWNER or ENGINEER. SC. 16 Delete Article 16 – ARBITRATION from General Conditions END OF SUPPLEMENTARY CONDITIONS ^TOP 49 Project # STR-07-20 SPECIAL PROVISIONS For: STREET LIGHT LED UPGRADE PROJECT 2020 Project No.: STR-07-20 GENERAL INFORMATION All work associated with this project shall be performed and completed in conformance with these Contract Documents, the construction drawings pertaining to this project, the City of Rexburg Standard Drawings and Specifications, and applicable Federal, State or Local requirements or as directed by the City Engineer. PROJECT DESCRIPTION The project consists of upgrading existing City of Rexburg street, path, and parking lot lights. The contractor will provide and install new LED fixtures and provide and install new LED bulbs in existing fixtures with associated electrical modifications. STANDARD SPECIFICATIONS AND STANDARD DRAWINGS The City of Rexburg has adopted Idaho Standards for Public Works Construction Specifications and Drawings as its (Rexburg's) Standard Specifications and Standard Drawings; and these referenced Standard Specifications and Standard Drawings shall be those governing and referenced in this Contract except as they may be amended in current City of Rexburg Engineering Standards, these Special Provisions, or Project Plans. Wherever the word CITY is used in these Standards, it shall be understood to mean the City of Rexburg. Wherever the word ENGINEER or CITY ENGINEER is used, it shall be understood to mean the City Engineer of the City of Rexburg, or the Engineer the City has designated to be in charge of the project or particular part of the project work. ROCKY MOUNTAIN POWER INCENTIVE REQUIREMENTS This project will be partially funded by the Rocky Mountain Power Wattsmart Incentive program. Fixtures and bulbs must be eligible for that program, or have an approved exception request from Rocky Mountain Power. Contractor shall provide documentation of compliance with the incentive program in the submittals. The Contractor is required to fill out a “Light Upgrade Report Form” for each fixture or set of identical fixtures found at the end of this section. This form will provide the information required for the City to receive the incentive from Rocky Mountain Power and must be included with the Application for Payment to document the work. 50 Project # STR-07-20 ELECTRICAL PERMIT The Contractor is required to obtain an electrical permit from the City of Rexburg Building Department and to coordinate with the Building Department for required inspections. There will be no cost to the Contractor for the permit. REPLACEMENT OF COBRA-HEAD STYLE FIXTURES Cobra head style street light fixtures shall be replaced with the following fixture on the existing pole: American Electric Lighting ATBM P20 MVOLT R3 AO per City of Rexburg Engineering Standards. REPLACEMENT OF BULBS IN DECORATIVE STYLE FIXTURES The Contractor shall replace the bulbs in decorative type fixtures and bypass the ballast in the fixture per bulb manufacturer recommendations. LED replacement bulbs shall meet the following requirements: For decorative fixtures with horizontal bulbs (Parking Lots, Street Lights, Rexburg Rapids): • Bulb is to be 45 W LED 4000K 100-277 V • RAB HID -45-EX30-840-BYP-PT, or equivalent, “corncob” type bulb. Must be DLC or Energy Star Certified or have an approved exception request from Rocky Mountain Power. • Specified light bulb has EX39 base type. However, some fixtures may have E26 base. Contractor to verify required base size required for each fixture and provide required bulb with required base or adaptor. • Contractor to verify that bulb, and adaptor when applicable, fit in each fixture. • Additional Technical Specifications o Built in Surge Protection: 4KV o Minimum Rated Hours: 50,000 o Initial Lumens: 6,000 minimum o Enclosure Rating: Approved for Totally Enclosed Fixtures o Rated for outdoor & indoor use • Warranty: 5 Year For 480 V decorative fixtures with vertical bulbs (Smith Park, Porter Park): • Bulb is to be 27 W LED 4000K 100-277 V with 480 V to 277 V transformer. • RAB HID -27-EX39-840-BYP-PT or RAB HID-27-E26-840-BYP-PT, or equivalent “Corncob” type bulb. Must be DLC or Energy Star Certified or have an approved exception request from Rocky Mountain Power. • Transformer to be RAB XFMR200-480-277, or equivalent. • Contractor to verify required base size required for each fixture and provide required bulb with required base or adaptor. • Contractor to verify that bulb, and adaptor when applicable, fit in each fixture. • Additional Technical Specifications 51 Project # STR-07-20 o Built in Surge Protection: 4KV o Minimum Rated Hours: 50,000 o Initial Lumens: 3,900 minimum o Enclosure Rating: Approved for Totally Enclosed Fixtures o For outdoor & indoor use • Warranty: 5 Year For 100-277 V decorative fixtures with vertical bulbs (Stone Bridge, Harvest Heights, Founders Square, Canyon View, Tabernacle, Roundabout) • Bulb is to be 27 W LED 4000K 100-277 V • RAB HID-27-EX39-840-BYP-PT or RAB HID-27-E26-840-BYP-PT, or equivalent “Corncob” type bulb. Must be DLC or Energy Star Certified or have an approved exception request from Rocky Mountain Power. • Contractor to verify required base size required for each fixture and provide required bulb with required base or adaptor • Contractor to verify that bulb, and adaptor when applicable, fit in each fixture. • Additional Technical Specifications o Built in Surge Protection: 4KV o Minimum Rated Hours: 50,000 o Initial Lumens: 3,900 minimum o Enclosure Rating: Approved for Totally Enclosed Fixtures o For outdoor & indoor use • Warranty: 5 Year VERIFYING QUANTITIES / EXISTING LED FIXTURES AND BULBS The Contractor shall be responsible to verify the quantity of each type of fixture, bulb, and photo cell required before ordering. Some of the lights identified in the project may already have been replaced with LED fixtures and/or bulbs. The Contractor will not modify existing LED bulbs or fixtures. The City will not pay restocking fees resulting from the Contractor failing to order the correct quantities and types of fixtures and bulbs. REPLACEMENT OF PHOTO CELLS It is anticipated that many photo cells will need to be replaced with LED-compatible photo cells. Existing photo cells vary in type and location. Some photo cells serve a single light, while others serve multiple lights. Contractor shall check compatibility of each existing photocell with the new LED fixture/bulb and replace the photo cells when necessary. Photo cells that need to be replaced will be paid for at the rate listed in the bid proposal. Unit price shall include all work and materials required to replace the photo cell. ADDITIONAL ELECTRICAL MODIFICATIONS AND REPAIRS During replacement of fixtures and bulbs, the Contractor may identify needed repairs or problems with the existing fixtures or wiring. The Contractor will notify the City of any needed 52 Project # STR-07-20 electrical repairs to the lights and provide an estimate of the effort required to make the repairs. The City will consider the recommendations and must preauthorize any repairs. HEIGHT ACCESS TO POLES The Contractor will be responsible to provide a manner to access all the poles to be modified. The City’s bucket truck will not be available for use by the Contractor. TRAFFIC CONTROL The Contractor will be responsible for traffic control and barricading parking stalls to provide bucket truck access to lights, where required. If traffic lane closures are necessary to provide safe access to lights, the Contractor will coordinate with the City to determine a time that will cause minimal interruption to traffic flow. When light replacements at traffic signals require the traffic signal to be taken offline, the Contractor will coordinate with the City Engineer to determine a time that will cause minimal interruption to traffic flow and the City Engineer will operate the traffic signal. The City will provide temporary stop signs at the intersection while the traffic signal is offline. Contractor will provide all other traffic control. UTILITY LOCATIONS The Contractor shall request all utility companies to locate all of their utilities prior to commencement of any phase of construction that may affect said utilities. This location may be obtained for utilities within the city limits by calling 1-800-346-3972 scheduling a "locate". The Contractor shall be responsible for maintaining a record of these locations for use during construction. GENERAL CLEANUP The Contractor shall be responsible for the general cleanup of the project site. The Contractor shall pick up, load, haul and dispose of all debris left from construction. Any labor, material, or equipment used to meet the requirements of this paragraph shall be considered incidental to the project and all costs associated therewith shall be included in the contractor's unit bid price for other bid items. DISPOSAL OF WASTE: COMPLIANCE WITH ENVIRONMENTAL LAWS Contractors shall remove, transport and properly dispose of all fixtures, bulbs, debris, and waste material removed from the work site as required under the terms and conditions hereof. All such removal, transportation and disposal shall be at Contractor's sole expense and shall be accomplished in accordance with all statutes, laws, regulations and ordinances of the United States government, the State of Idaho or other agencies or local governments having jurisdiction thereof. Prior to the disposal of any hazardous chemical or regulated waste at any landfill, Contractor shall provide written proof satisfactory to the City that the operator of such landfill possesses all permits and licenses required by law in order to accept waste to be removed from the project site. Prior to acceptance of the work by the City, Contractor shall deliver to the City a 53 Project # STR-07-20 certificate from the operator of any landfill wherein such waste has been delivered, stating that all such waste material has been properly disposed of in accordance with all such laws, statutes and regulations. Contractor shall hold the City harmless from all fines, penalties, costs, claims and demands of any kind, including attorneys' fees and court costs, arising from any act or omission by Contractor while removing, transporting or disposing of any hazardous substance or regulated waste at the project site. COMPLETION TIME TABLE The CONTRACTOR shall have 60 calendar days for substantial completion. ^TOP 54 Project # STR-07-20 LIGHT UPGRADE REPORT FORM (Fill out one form per pole or set of identical poles) Light #’s Location / Street Existing Fixture / Bulbs Fixture Type Cobra Head / Decorative Bulb Type MH / HPS / Induction / Mercury Vapor / LED Voltage Watts Number of Fixtures / Bulbs New LED Installation Watts Fixture / Bulb Type Number of Fixtures / Bulbs New Photo Cell (Only Report Once for Each Photo Cell) Was Photo Cell Replaced? Yes / No / NA Type of Photo Cell Other Repairs Performed (Must be pre-approved by City) ")! ")! ")! ")! ")! ")! ")! ")!")! ")! ")!")! ")! ")!")! ")!")! ")!")!")! ")! ")!")! ")! ")! ")!")! ")! ")!")! ")!")!")! ")! ")! ")! ")!")!")! ")!")! ")! ")! ")! ")! ")! ")! ")! ")!")!")!")!")! ")! ")!")! ")!")!")!")!")! ")!")!")!")!")! ")!")! ")! ")! ")! ")! ")! ")! ")! ")!")!")!")! ")! ")! ")! ")!")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")!")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")!")!")! ")! ")!")!")!")!")! ")! ")!")! ")!")! ")!")! ")! ")!")! ")! ")! ")! ")!")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")!")! ")!")! ")!")! ")! ")!")! ")! ")! ")! ")! ")! ")!")!")! ")!")! ")!")! ")! ")!")!")!")! ")!")! ")!")! ")! ")! ")! ")! ")! ")! ")! ")!")!")! ")! ")! ")! ")! ")!")! ")! ")! ")! ")!")!")! ")!")! ")! ")! ")! ")!")!")! ")!")!")! ")! ")!")!")! ")! ")! ")! ")!")! ")!")!")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")! ")!")!")!")! ")!")! ")! ")! ")!")!")! ")! ")!")! ")! ")! ")!")!")! ")! ")! ")!")! ")! ")! ")! ")! ")! ")! ")!")!")!")! ")! ")!")!")! F a i r v i e w A v e Lila c S t E 1st S Twi s t e d Will o w S C e n t e r S t S t o n e D r Mountain River TetonR Village A i r p o r t R d S 2 3 8 0 W E7th S In d e p e n d e n c e Way E 1st N S 5 t h W S 2 n d E E 2nd S C a s p e r A v e Park St Cou n t r y s i d e A v e Pio n e e r R d Oak Hill C i r Sto n e b r i d g e S t Fisher Way W 4th S W 4th S S 2 2 7 5 W S 2 n d W S 2 3 1 5 W S 2 n d W Syr i n g a S t UniversityBlvd Dividend Dr W Main St H a m i l t o n L n Stationery Rd Geo r g e t o w n D r P a u l R e v e r e L n S h o s h o n e Ave E 4th N Tower Rd Johnson St JeffersonDr Mar i a n n e D r W 860 S T a n g l e w o o d D r Lodgepole St N 1 s t E Willowcreek Ln Tanglewood Dr Pol l a r d A v e N M i l l h o l l o w Rd Sea g u l l D r Dav i d Ct McJon Ln Arie s S t Log a n St S 5 t h W Y a l e A v e Larch Dr Georgetown Dr Star V i e w D r Parkside Dr Brittany Ln Crest View Dr G r a n d L o o p Summerwood Dr Max Dr W e s t w o o d D r Summerfield Ln Eagle Ct S 5 t h E Sun f l o w e r R d Grandview Dr Huc k l e b e r r y CirFreedomLn Sidd o w a y S t N 2 n d E Baldwin D r E 3rd S E 2nd South Alley CoyoteWillowWay G r e e n H a v e n C i r Ryan St W 1st N Sarah St S 3 r d E Har v a r d A v e Cor n e l l A v e Pinehaven St Rid g e Vie w D r N 3 r d E S 1 s t E W 7th S Col l e g e A v e S 2 1 0 0 W Moh a w k A v e ParkSt Sum m i t D r Dell Dr W h e a t l a n d C i r Engleman St S 2 4 0 0 W N Ye l l o w s t o n e H w y S 1 s t W WheatlandDr C h u c k Y e a g e r W a y S 4 t h E Timberhawk Dr Mar i g o l d S t N C e n t e r S t A u t u m n D r Bluebell St Mar i a h A v e S 4 t h W Lin d e n A v e Westwo o d C i r Arctic Willow Dr Pine Brook Ln S M i l l h o l l o w R d W 6th S Laleene Dr EdithCir West s i d e Est a t e s S t Comanche Dr Tw i s t e d Will o w Pol o D r Ada m s CtMon r o e Dr Oak t r a i l D r Nina DrMela n i e Dr Win n Dr Woodbridge St N 5 t h W Turin Way MeadowhawkDr Maple Dr C a s t l e P i n e s R d Pon d e r o s a A v e A s h A v e N 4 t h W Bir c h A v e M i l l R a c e R d E Main St W 960 S Sparrowhawk Dr Cook St Lu p i n e St Mea d o w b r o o k S t Golden Willow Cir Col o n i a l Way Sunrise Dr Kell y J o h n s o n W a y Blackhawk Dr R e e d S t Sho s h o n e A v e John H a n c o c k Ave PalmerCir Sun s e t C i r Orc h a r d Ave Boxwood Ave O a k A v e Blu e Will o w C i r Will o w Bro o k C i r N 3 r d W Val l i n d a L n Poplar Cir Tam a n a D r W 3rd S S Ye l l o w s t o n e H w y Taurus Dr N 2 n d W E5thS Gol d e n W i l l o w Dr Sto c k s A v e Andrews Pl Bare St Tor r e y L n Ste i n e r A v e Prin c e t o n C t OakHill Way W 1st S Wash i n g t o n Blv d Carlson Ave EMainAlleySouth Sage St Webster Ave W Campus St LupineSt E 4th S W Main Alley South H a n d c a r t L n Wingit Way Carlson Extension Alley J e r r y A v e E 2nd N Liberty Ln Capital Ln E 7th N Cul De Sac Dr Everett Pl P a p p y B o y i n g t o n W a y Rolling Hills Dr K S t Vis t a A v e Salem Ave Mad i s o n P r o f Par k N 4 t h E Hope St Mea d o w b r o o k St M i l l S t r e a m S t N H i l l R d S C e n t e r S t S 1 2 t h W Autumn Ct W 550 S L e g a c y L n W 2nd N W 690 S Yost St Griffin St Henderson St Vale Ln Holly St W 7th S Ros e w o o d D r Seq u o i a A v e S H i d d e n V a ll e y R d E 4th S Terra Vista Dr Lorene St W 880 S C a n y o n S p r i n g s D r P h y s i c a l P l a n t W a y W 4th N Walker Dr Angela Dr Chad Dr American St G o l d e n B e a u t y D r Elizabeth St W 900 S S 2 n d E a s t A l l e y Har v a r d A l l e y S 1 s t E a s t A l l e y Cor n e l l A l l e y Trejo St Cha r l e s Pla c e SummersDr Cypress Loop Love St Ella Ln N H i d d e n V a l l e y R d Chu c k Yea g e r W a y Rod n e y D r Mar k A v e Reb e c c a A v e Sus a n D r Ran d y D r Gar y D r Car l o w D r Eagle Summit St N 2 n d W S H i d d e n V a l l e y R d T al o n Dr Widdison Ln P l e a s a n t V i e w W 3rd N Violet St Laurel St Elm A v e F i r s t AmericanCir W 5th S W 2nd S V a l l e y V i e w T H P r i v a t e A l l e y N 1 s t W W 7th S S 3 r d W W Viking Dr Ricks Extension Alley Mad i s o n A v e Ricks Ave E Viking Dr E 5th S ValleyRiverDr W S u n s e t C i r E S u n s e t C i r Erikson Dr BarneyDairyRd P r o f e s s i o n a l P l a z a S t Tam a r a c k A v e Jill D r M o r g a n D r Profit St S 2 4 7 0 W W 1000 S Green Willow Dr WHwy 33 Gemini Dr Eag l e w o o d D r Sto n e b r i d g e S t Mikan Dr Apa c h e A v e Nez P e r c e A v e Fra n k l i n D r Bon d A v e Centennial Loop ThomsonFarmsRd Stegelmeier Ln Harvest D r N 5 t h W Dou g l a s D r Anne St Hill v i e w D r N atureParkDr E 15th N Greenside Loop Hori z o n D r S Ra i l r o a d A v e Widdison Ln G r a n d L o o p C o r n e l i s o n A v e H i l l s i d e D r Je t S t r e a m D r N 1 2 t h W E Moody Rd E a gle P a r k D r 1 2 3 4 5 7 8 9101112 13 15 16 19 20 21 24 25 26 27 28 29 3031 32 34 35 3637 38 39 40 41 42 43 44 45 47 48 49 50 51 5253 54 55 56 57 58 59 60 61 62 63 646566 67 68 69707172 73 74 75 76 777879 80 81 82 83 84 858687 88 89 90 91 9394 9596 97 98 99 100 101 102 103 104 105 108 109 110 111 112 113 114 115 116 117 118 119 120 122123 124 125 126 127 128 129 130 131 132 133 134 135 136137138139 140 141 142 143 144 145 146 147 148 150151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167168169 170 171 172 173 174 175 176177179 180 181 182 184 187 188 190 191 192 193 194195196 197 198 199 200 201 202 203 209 210211 212 213 214 215216 217 218219 220 221 222 223 224 225 226 227228 229 230 231232233 234 235 236 237 239 240 242243 245 246 253 254 255 260 261262 263 264 265 266 267268 269270 271272 273 274 275276 277 278281 282 283 284 285 286 287288289290 291 292 293 294 295 296 297 298 300 302 303 304305 307 308 309 310 311 312 313 314 315 316317 318 319 320 321 322 MRGIS Poles Primary Function ")!Light On Traffic Signal Pole ")!Parking Lot Light Pole ")!Streeet Light Pole ")!Path Light Pole ")!Light On Recreational Field Pole ")!Unknown Rexburg Selected Lights for LED Upgrade Project 2020 ")! ")! ")! ")! ")! ")! ")!")! ")! ")! ")! ")! ")! ")! ")! ")!")! ")!")!")! N C e n t e r S t E 2nd NW 2nd N 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 302 303 304305307 MRGIS ")!")!")! ")! ")!")! ")! ")! ")!")! ")! ")!")! ")!")!")!")!")!")!")!")! ")! ")!")! ")!")!")! ")! ")! ")!")!")!")!")! ")!")! ")! ")!")! ")! ")!")!")! Col l e g e Ave S 1 s t E N 1 s t E N C e n t e r S t E Main Alley North Ricks Extension Alley 174 175 176 177 178 179 180 181 182 183 184 185186 187188189 190 191 235 236 237 238 239 240 241 242 243 244 245246247 248 249 250 251 252 275276 277 278 279 280 281 MRGIS ")! ")! ")! ")! ")! ")!")! N 4 t h E 75 76 77 253 254 255263 MRGIS ")!")! ")! ")! ")! ")! ")! ")! ")! ")!")! ")! W 1st N N 1 s t W N 2 n d W N 2 n d W 9596 97 265 266 267 268 269 270 271272 274 MRGIS Exhibit B - Light Detail Table ID Poles Primary Function Operating Volts Lamp Type Manufacturer Wattage Fixtures Pole Style Latitude Longitude 1 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82195865 -111.7840295 2 Street Light Pole 240 Volts Induction 150 Watts 1 Standard 43.81174112 -111.8087587 3 Street Light Pole 240 Volts Induction 150 Watts 1 Standard 43.81259045 -111.8087741 4 Street Light Pole 240 Volts Induction 150 Watts 1 Standard 43.8133582 -111.8089789 5 Street Light Pole 240 Volts Induction 150 Watts 1 Standard 43.82622214 -111.7923241 7 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.8229037 -111.7824944 8 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82230377 -111.7824947 9 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82201065 -111.7825027 10 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82197169 -111.7832516 11 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82195806 -111.7844373 12 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82195812 -111.7850604 13 Street Light Pole 240 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.81176953 -111.797913 15 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82451236 -111.7824726 16 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82409594 -111.7824699 19 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82498499 -111.7832526 20 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.8248704 -111.7836093 21 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82530122 -111.7823033 24 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81770376 -111.7779384 25 Street Light Pole 277 Volts Metal Halide Everlast Lighting 400 Watts 1 Standard 43.81967074 -111.7779301 26 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81905889 -111.7779409 27 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81880352 -111.777938 28 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81804038 -111.777938 29 Street Light Pole 277 Volts Metal Halide Everlast Lighting 400 Watts 1 Standard 43.81753487 -111.7779381 30 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81694214 -111.7779471 31 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81661196 -111.7779477 32 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81629941 -111.7779394 34 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81439258 -111.7779477 35 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81369309 -111.7779476 36 Street Light Pole 277 Volts Metal Halide Everlast Lighting 400 Watts 1 Standard 43.81351904 -111.7779447 37 Street Light Pole 277 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.81336485 -111.7779486 38 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81296579 -111.777951 39 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81233558 -111.7778944 40 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81191981 -111.7778695 41 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81729107 -111.7779463 42 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81943199 -111.7779394 43 Street Light Pole 240 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.81168644 -111.8178528 44 Street Light Pole 240 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.82338551 -111.8178843 45 Street Light Pole 240 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.83409965 -111.7782518 47 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82564429 -111.7868056 48 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82523549 -111.7865545 49 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82487156 -111.7868088 50 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82454563 -111.7865565 51 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82426038 -111.7868093 52 Street Light Pole 240 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.82404501 -111.7865021 53 Street Light Pole 240 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.82385965 -111.7868088 54 Street Light Pole 240 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.81574539 -111.7922798 55 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81489291 -111.7779463 56 Street Light Pole 277 Volts Metal Halide Everlast Lighting 150 Watts 1 Standard 43.81568686 -111.7779416 57 Street Light Pole 277 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.81839764 -111.7779392 58 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.84027748 -111.7710809 59 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.8399763 -111.7698808 60 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.83997134 -111.768744 61 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.8399398 -111.7672153 62 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.84022419 -111.765963 63 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.83869491 -111.7675875 64 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.83854756 -111.7686492 65 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.83854989 -111.7700572 66 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.838551 -111.7708275 67 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.83851995 -111.7668608 68 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.83951366 -111.7660351 69 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82807091 -111.7724144 70 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.8281071 -111.7733196 71 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82810963 -111.7741667 72 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82811284 -111.7750005 73 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.8274597 -111.7750484 74 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82748309 -111.7723859 75 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82697803 -111.7726625 76 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.8266416 -111.7730389 77 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82633787 -111.7736738 78 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82618685 -111.7742234 79 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 2 Decorative 43.8262864 -111.7750262 80 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82683894 -111.7750418 81 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82388053 -111.7922001 82 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82388019 -111.791514 83 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82370507 -111.7897497 84 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.8222864 -111.7903299 85 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82250927 -111.7907806 86 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82251065 -111.7915595 87 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82251088 -111.7922166 Exhibit B - Light Detail Table ID Poles Primary Function Operating Volts Lamp Type Manufacturer Wattage Fixtures Pole Style Latitude Longitude 88 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82296897 -111.7922831 89 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82340415 -111.792287 90 Street Light Pole 240 Volts High Pressure Sodium Unk 400 Watts 1 Standard 43.81161055 -111.7868832 91 Street Light Pole 240 Volts High Pressure Sodium Unk 400 Watts 1 Standard 43.81161654 -111.7840632 93 Street Light Pole Mercury Vapor 170 Watts 1 Standard 43.8328448 -111.8009251 94 Street Light Pole Mercury Vapor 170 Watts 1 Standard 43.83281981 -111.8024259 95 Street Light Pole 208 Volts Induction Everlast Lighting 150 1 Standard 43.82830466 -111.7868581 96 Street Light Pole 125 Volts Induction Everlast Lighting 150 1 Standard 43.82832627 -111.7897235 97 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82734734 -111.7894119 98 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.81927701 -111.8076322 99 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.8192788 -111.8054124 100 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.82015115 -111.8068933 101 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.82045843 -111.805443 102 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.82090687 -111.8068963 103 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.81927628 -111.8043413 104 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.81927992 -111.8030632 105 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.82125276 -111.8030276 108 Street Light Pole 125 Volts High Pressure Sodium Other 100 Watts 2 Decorative 43.81772647 -111.7899686 109 Street Light Pole High Pressure Sodium Other 100 Watts 2 Decorative 43.81799095 -111.7895662 110 Street Light Pole 125 Volts High Pressure Sodium Other 100 Watts 2 Decorative 43.81772157 -111.7891932 111 Street Light Pole High Pressure Sodium Other 100 Watts 2 Decorative 43.81744141 -111.7895762 112 Light On Traffic Signal Pole 125 Volts Induction 250 Watts 1 Standard 43.81161367 -111.7782335 113 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82388839 -111.7908074 114 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82388362 -111.7901769 115 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82316775 -111.7897674 116 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82264998 -111.7897736 117 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82196244 -111.7915915 118 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82229916 -111.791764 119 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 400 Watts 1 Standard 43.82176723 -111.789728 120 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 400 Watts 1 Standard 43.82196631 -111.7893725 122 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81332407 -111.7632474 123 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.8135429 -111.7634476 124 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81274128 -111.7641029 125 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81169345 -111.7671919 126 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81185294 -111.7664976 127 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81165285 -111.7659951 128 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.8118443 -111.7656232 129 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81230741 -111.7659825 130 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.8116962 -111.7650342 131 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81194099 -111.7644349 132 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81241084 -111.7643738 133 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81321556 -111.7641135 134 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81367015 -111.7642511 135 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81396821 -111.7647988 136 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.8143601 -111.7648772 137 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81457755 -111.7654559 138 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81476401 -111.7661244 139 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.8145647 -111.7669562 140 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81413651 -111.7672864 141 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81319605 -111.7673408 142 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81275321 -111.7671052 143 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81228705 -111.7673598 144 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81350049 -111.7671045 145 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81370536 -111.766672 146 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81352909 -111.766269 147 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81318179 -111.7658973 148 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81342018 -111.7657015 150 Street Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.82500656 -111.7814011 151 Street Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.8249969 -111.7816879 152 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.81830494 -111.7678984 153 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.81830714 -111.7666124 154 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.81756743 -111.7679528 155 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81757101 -111.7661543 156 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.81694199 -111.7658086 157 Street Light Pole High Pressure Sodium Other 100 Watts 1 Decorative 43.8164774 -111.7678846 158 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.81647775 -111.7667763 159 Street Light Pole Metal Halide Other 100 Watts 1 Decorative 43.81574913 -111.767949 160 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81238445 -111.7632318 161 Street Light Pole 125 Volts High Pressure Sodium Other 100 Watts 1 Decorative 43.81589593 -111.7653014 162 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 400 Watts 1 Standard 43.80407729 -111.8088475 163 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 400 Watts 1 Standard 43.80369719 -111.8087085 164 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 400 Watts 1 Standard 43.80396271 -111.808495 165 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81158543 -111.7635106 166 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81114727 -111.7642793 167 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81071296 -111.7647976 168 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81078283 -111.7654156 169 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81081154 -111.7666374 170 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81057755 -111.7661704 171 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81068668 -111.7672265 Exhibit B - Light Detail Table ID Poles Primary Function Operating Volts Lamp Type Manufacturer Wattage Fixtures Pole Style Latitude Longitude 172 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81041001 -111.7677161 173 Street Light Pole 125 Volts Metal Halide Other 100 Watts 1 Decorative 43.81032003 -111.7674275 174 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82676527 -111.783432 175 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82676832 -111.7831192 176 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82673435 -111.7828485 177 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82692418 -111.7828453 178 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82711522 -111.782845 179 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82711385 -111.7825399 180 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82692437 -111.7825293 181 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82729177 -111.7822384 182 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82711664 -111.7822393 183 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82711725 -111.7819496 184 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82729138 -111.781946 185 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82692694 -111.7819516 186 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82692599 -111.7822414 187 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82672745 -111.7818667 188 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82673231 -111.7822417 189 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82673296 -111.7825081 190 Path Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82655226 -111.7823843 191 Path Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82630196 -111.7823811 192 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80422586 -111.7754617 193 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80330135 -111.7757974 194 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80330073 -111.7747823 195 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80326621 -111.776783 196 Street Light Pole 125 Volts High Pressure Sodium Other 150 Watts 1 Decorative 43.80314386 -111.7773322 197 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80244063 -111.7767808 198 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80255236 -111.7762607 199 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80316101 -111.7759634 200 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80316298 -111.7749839 201 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80260144 -111.7752993 202 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.802289 -111.7746736 203 Street Light Pole High Pressure Sodium Other 150 Watts 1 Decorative 43.80295911 -111.7739973 209 Light On Traffic Signal Pole Induction Everlast Lighting 250 Watts 1 Standard 43.81159445 -111.7778333 210 Light On Traffic Signal Pole Induction Everlast Lighting 250 Watts 1 Standard 43.81137591 -111.7778564 211 Light On Traffic Signal Pole Induction Everlast Lighting 250 Watts 1 Standard 43.8113385 -111.7782009 212 Street Light Pole High Pressure Sodium 400 Watts 1 Standard 43.8117573 -111.7943583 213 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.81347199 -111.7940832 214 Street Light Pole High Pressure Sodium 250 Watts 1 Standard 43.81369306 -111.7950938 215 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 2 Decorative 43.8305287 -111.7851079 216 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 2 Decorative 43.83090162 -111.7851055 217 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83117509 -111.7851017 218 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83135457 -111.7855071 219 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83146978 -111.7857775 220 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83133719 -111.7862941 221 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83159729 -111.786307 222 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83164146 -111.7858435 223 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83183674 -111.7858436 224 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83136037 -111.7846755 225 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83156312 -111.7846308 226 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.83180507 -111.7846318 227 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 2 Decorative 43.83216187 -111.7847927 228 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 2 Decorative 43.83232929 -111.7852917 229 Parking Lot Light Pole Metal Halide Eurotique 150 Watts 2 Decorative 43.83216708 -111.7857836 230 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.8117576 -111.8233181 231 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81232655 -111.8236437 232 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81232308 -111.8254681 233 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.812341 -111.8268862 234 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81175757 -111.8268936 235 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82634945 -111.7808059 236 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82655735 -111.7808065 237 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82671629 -111.7807306 238 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82671602 -111.7804748 239 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82671371 -111.7802314 240 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82673787 -111.77998 241 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82673796 -111.7797428 242 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82691716 -111.7797412 243 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82709874 -111.7797417 244 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82709835 -111.7799769 245 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82691885 -111.779978 246 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82691881 -111.7802293 247 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82692022 -111.7804714 248 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82684488 -111.7807281 249 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82695115 -111.780727 250 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82710356 -111.7807268 251 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.8271021 -111.7804703 252 Parking Lot Light Pole 208 Volts Metal Halide Eurotique 150 Watts 2 Decorative 43.82710099 -111.780231 253 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82663376 -111.7726158 254 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82672996 -111.7727589 255 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82678645 -111.7725097 Exhibit B - Light Detail Table ID Poles Primary Function Operating Volts Lamp Type Manufacturer Wattage Fixtures Pole Style Latitude Longitude 260 Street Light Pole 125 Volts High Pressure Sodium Other 100 Watts 1 Decorative 43.81556478 -111.7665489 261 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81311113 -111.8236566 262 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81311973 -111.8254827 263 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82681296 -111.7727 264 Path Light Pole 480 Volts High Pressure Sodium Sternberg 1290 100 Watts 1 Decorative 43.82210458 -111.7897562 265 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82664709 -111.7894118 266 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82697383 -111.7896784 267 Street Light Pole 208 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.82766223 -111.7892346 268 Street Light Pole 208 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.82784472 -111.7894429 269 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82797107 -111.7888507 270 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82810914 -111.7881323 271 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82830298 -111.7877512 272 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82828908 -111.7885567 273 Street Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82196855 -111.785826 274 Street Light Pole 208 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82811096 -111.7872112 275 Path Light Pole 125 Volts Other 150 Watts 1 Decorative 43.82725898 -111.7843017 276 Path Light Pole 125 Volts Other 150 Watts 1 Decorative 43.82725618 -111.7845274 277 Path Light Pole 125 Volts Other 150 Watts 1 Decorative 43.82725494 -111.7840894 278 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82709542 -111.7816191 279 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82709431 -111.7812328 280 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82729144 -111.7816188 281 Parking Lot Light Pole 240 Volts Metal Halide Eurotique 150 Watts 1 Decorative 43.82729383 -111.7812358 282 Street Light Pole 125 Volts High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.82221938 -111.7808138 283 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.82192952 -111.7801745 284 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.82193133 -111.7796213 285 Street Light Pole 125 Volts Induction Everlast Lighting 150 Watts 1 Standard 43.82193023 -111.7807533 286 Street Light Pole 208 Volts Induction Neptune 150 Watts 1 Standard 43.85495544 -111.7734545 287 Street Light Pole 208 Volts Induction Neptune 150 Watts 1 Standard 43.85495391 -111.7748845 288 Street Light Pole 208 Volts Induction Neptune 150 Watts 1 Standard 43.85495443 -111.7764728 289 Light On Traffic Signal Pole 208 Volts High Pressure Sodium Valmont 250 Watts 1 Standard 43.8547684 -111.7777095 290 Light On Traffic Signal Pole 208 Volts High Pressure Sodium Valmont 250 Watts 1 Standard 43.85498519 -111.7776949 291 Light On Traffic Signal Pole 208 Volts High Pressure Sodium Valmont 250 Watts 1 Standard 43.8549804 -111.7780671 292 Light On Traffic Signal Pole 208 Volts High Pressure Sodium Valmont 250 Watts 1 Standard 43.85474585 -111.7780484 293 Street Light Pole 208 Volts Induction Neptune 150 Watts 1 Standard 43.85596844 -111.7777637 294 Street Light Pole 208 Volts Induction Neptune 150 Watts 1 Standard 43.85706924 -111.7775011 295 Street Light Pole 208 Volts Induction Neptune 150 Watts 1 Standard 43.85706953 -111.7748371 296 Street Light Pole 208 Volts Induction Neptune 150 Watts 1 Standard 43.85707153 -111.7734264 297 Street Light Pole 125 Volts High Pressure Sodium Unk 400 Watts 1 Standard 43.80454497 -111.810415 298 Street Light Pole 125 Volts Induction 150 Watts 1 Standard 43.8394703 -111.7782449 300 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81521246 -111.7779439 302 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.83298202 -111.7843171 303 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.83297782 -111.7828873 304 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.8327912 -111.7828882 305 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.83278929 -111.7836043 307 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.83279376 -111.7843219 308 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81733452 -111.792313 309 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81709394 -111.7923177 310 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81761347 -111.7918932 311 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.81679486 -111.7923079 312 Street Light Pole Induction 150 Watts 1 Standard 43.80616757 -111.7983245 313 Street Light Pole Induction 150 Watts 1 Standard 43.80738415 -111.7983305 314 Street Light Pole Induction 150 Watts 1 Standard 43.80615855 -111.7997646 315 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 250 Watts 1 Standard 43.82195455 -111.7868405 316 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 250 Watts 1 Standard 43.82198684 -111.7865993 317 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 250 Watts 1 Standard 43.82179652 -111.7865134 318 Light On Traffic Signal Pole 125 Volts High Pressure Sodium 250 Watts 1 Standard 43.82174772 -111.7867953 319 Street Light Pole High Pressure Sodium 400 Watts 1 Standard 43.83609836 -111.7987287 320 Street Light Pole Metal Halide Eurotique 150 Watts 1 Decorative 43.8238091 -111.7866096 321 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.82294516 -111.7865527 322 Street Light Pole High Pressure Sodium Eurotique 150 Watts 1 Decorative 43.82249288 -111.7865508