HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00271 - Fat Cats - RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/12/2020 12:18 pm
Permit Details Permit Number: 10-00271
Fat Cats - Remodel
475 N 2nd E
Commercial - Remodel
Permit Issued Date: 05/08/2014
Permit Inspection Statistics
12Total Inspections Completed:
10Total Inspections Passed:
Inspection Pass Rate: 83.33%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
08/23/2010PassPLL ADMINFraming/Structure Inspection
Framing completed so far looks good
Kitchen area OK (9/3 QO)
As per Jon Berry.
Inspector Comments:
08/26/2010PassPLL ADMINSheetrock/Drywall Inspection
10/12/2010PassPLL ADMINBuilding Final
as per Jon Berry.Inspector Comments:
Electrical
08/24/2010PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
Approved for cover in the newly framed areas in the back of the building for
mini-golf area.
Inspector Comments:
09/03/2010PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
Approved for cover in the kitchen area framed walls-need to maintain access to
the flex 90's in the wall down low-cabinet will be there and they said they would.
Inspector Comments:
03/24/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Need to supply us with the installation instructions for the power supplies for the
star shaped LED lights on the front of the theater, call for a re-inspect when
ready.
Inspector Comments:
Fire
12/17/2010FailPLL ADMINFire Department Final Inspection
The fire alarm system requires a horn strobe in the party room. A relay switch is
required to be installed so the lighting in the miniature golf area automatically
turns on when the fire alarm is activated.
as per Brad Johnson.
Inspector Comments:
02/16/2011PassPLL ADMINFire Department Final Inspection
All corrections made, approved for final, per Brad Johnson.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00271
Fat Cats - Remodel
475 N 2nd E
Commercial - Remodel
Permit Status of (Open) as of Report Date: 06/12/2020 12:18 pm
Permit
Inspection
Summary
Mechanical
09/27/2010PassPLL ADMINHVAC Rough-in
Hood exhaust inspected
M/U air ducting not installed
As per Jon Berry.
Inspector Comments:
10/12/2010PassPLL ADMINHVAC Final Inspection
Hood tested good, CFM ok, hood interlock system worked.
As per Jon Berry.
Inspector Comments:
Plumbing
09/03/2010PassPLL ADMINPlumbing Rough-in
As per Brad JohnsonInspector Comments:
11/30/2010PassPLL ADMINPlumbing Final Inspection
Inspections Required
COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Page 2 of 2