Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00297 -442 S 4th E - Rexburg RapidsPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/12/2020 11:23 am Permit Details Permit Number: 10-00297 442 S 4th E - Rexburg Rapids 442 S 4th E New Commercial Building Permit Issued Date: Permit Inspection Statistics 21Total Inspections Completed: 17Total Inspections Passed: Inspection Pass Rate: 80.95% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 08/09/2010PassJohn BerryCommercial Footing Inspection Footing & rebar looked good that wasn't covered. JRW took picturesInspector Comments: 08/09/2010PassJohn BerryCommercial Footing Inspection Footing & Rebar looked good that wasn't covered JRW tookInspector Comments: 08/11/2010PassJohn BerryFoundation Inspection surge tank footing & floor & piers look goodInspector Comments: 08/12/2010PassJohn BerryFoundation Inspection Foundation & Rebar look goodInspector Comments: 08/19/2010PassJohn BerryCommercial Footing Inspection Foundation & Rebar look goodInspector Comments: 08/25/2010PassJohn BerryCommercial Footing Inspection Footings & rebar look goodInspector Comments: 08/31/2010PassJohn BerryFoundation Inspection Foundation & Rebar look goodInspector Comments: 09/03/2010PassQuinton OwensCommercial Footing Inspection Ok to pour (for water slide)Inspector Comments: 09/09/2010PassJohn BerryFoundation Inspection Foundation wall looks goodInspector Comments: 09/22/2010PassJohn BerryCommercial Footing Inspection Slide footings look goodInspector Comments: 06/21/2011FailJohn BerryCommercial Building Final Tack Weld on tower needs to be welded stair side 3rd level braleInspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00297 442 S 4th E - Rexburg Rapids 442 S 4th E New Commercial Building Permit Status of (Open) as of Report Date: 06/12/2020 11:23 am Permit Inspection Summary Electrical 06/09/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Need to finish up loose endsInspector Comments: 06/21/2010FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection -Heat cable not terminated for piping by pod pumps. - Pole lights not installed - Bond to circ pumps -L.V. Seperation required in office - Compressor not completed - GFCI protection for Circ. pumps 120v 15 & 20A Inspector Comments: 06/15/2011PassBret StoddardCOM & MFR Electrical Service Inspection Approved to stay energized for permanent powerInspector Comments: 06/29/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection GFDE Protection required on snow melting equipment (2 locations)Inspector Comments: 07/13/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final & COInspector Comments: Mechanical 06/21/2010PassJohn BerryHVAC Final Inspection Mechanical looks good no ladder to get on roofInspector Comments: Plumbing 09/30/2010PassBrad JohnsonPlumbing Underground Inspection Good for coverInspector Comments: 10/07/2010PassBrad JohnsonPlumbing Underground Inspection Approved for coverInspector Comments: 05/02/2011PassJohn MillarPlumbing Rough-in Rough in inspection on water line 7 drain linesInspector Comments: 06/21/2011PassCD InternPlumbing Final Inspection 1. Pipe 2. Backflow devices (2) need testing (Concession area) & Tagged 3. LAV in family changing room leaking (trap) 4. RP device, main shrs, needs testing/tagged 3" (50gd) 5. Trap primers by small water heater need connections - parts on electrical boxes Inspector Comments: Page 2 of 2