HomeMy WebLinkAboutSOIL DENSITY - 19-00736 - The Grove at Thomson Farms - Linden - 30 Unit Bldg 7In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms Apts
20001
Still Water Equity
Hill and Sons Excavation
May 29, 2020 F. Pelton
12:30 PM 3:00
867
1165 5184
10Bottom of finish grade 7.3
132
95%
Approximately A.8 and 3.75 of Building 11.
Bottom of finish grade
Pit Run
96%
132
7.7
127
136.8
96%
132
4.963
126.3
132.6
Pit Run
Bottom of finish grade
Approximately A.5 and 2.3 of Building 11.
95%
132
4.591
125.2
131
Pit Run
Bottom of finish grade
Approximately A.25 and 1.2 of Building 11.
97%
132
5.918
127.8
135.4
Pit Run
Bottom of finish grade
Approximately A.8 and 1.2 of Building 11.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.01 08:21:44
-06'00'
12
12
12
12
1
125
133.9Approximately A.5 and 3.75 of Building 11.
Pit Run
5
2
3
4
In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms Apts
20001
Still Water Equity
Hill and Sons Excavation
May 29, 2020 F. Pelton
4:30 PM 6:30 PM
867
1165 5184
12Bottom of finish grade 5.547
132
95%
Approximately C.75and 3.8 of Building 11.
Bottom of finish grade
Pit Run
95%
132
5.864
125.5
132.8
96%
132
5.538
126.3
133.3
Pit Run
Bottom of finish grade
Approximately B.5 and 3.8 of Building 11.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.01 08:31:31
-06'00'
10
12
1
126
133.1Approximately C.2 and 3.8 of Building 11.
Pit Run
2
3
In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Thompson Farms
20001
Stillwater Equity Partners
Hill & Son Excavation
Jun 1, 2020 D. Aust
1:00 PM 3:30 PM
3743
755 2716
61' below Top of Concrete 8.2
132
96%
Bldg 11 Line C 0.3, 3.0
1' below Top of Concrete
Pit Run
96%
132
6.6
127.2
135.5
95%
132
4.4
124.8
130.3
Pit Run
1' below Top of Concrete
Bldg 11 Line D 0.5, 3.0
95%
132
4.8
124.8
130.7
Pit Run
1' below Top of Concrete
Bldg 11 Line B 0.5, 3.0
96%
132
4.6
126.4
132.2
Pit Run
1' below Top of Concrete
Bldg 11 Line A 0.7, 3.0
95%
132
5.3
125.1
131.8
Pit Run
1' below Top of Concrete
Bldg 11 Line A 0.3, 3.0
96%
132
6.4
127
135.2
Pit Run
1' below Top of Concrete
Bldg 11 Line A 0.5, 2.5
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.02 08:04:12
-06'00'
6
6
6
6
6
6
1
127
137.1Bldg 11 Line C 0.7, 3.0
Pit Run
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
95%
132
6.2
125.3
133
Pit Run
1' below Top of Concrete
Bldg 11 Line A 0.3, 1.3
132
96%
6.8
127.3
136
Pit Run
1' below Top of Concrete
Bldg 11 Line A 0.7, 1.3
132
96%
6
126.3
133.9
Pit Run
1' below Top of Concrete
Bldg 11 Line B 0.5, 1.3
132
97%
6.7
127.4
133.1
Pit Run
1' below Top of Concrete
Bldg 11 Line B 0.5, 2.5
132
97%
6.4
127.4
135.5
Pit Run
1' below Top of Concrete
Bldg 11 Line D 0.5, 2.5
132
96%
6.6
126.3
134.6
Pit Run
1' below Top of Concrete
Bldg 11 Line C 0.5, 2.5
6
6
6
6
6
6
8
11
9
10
13
12
In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms Apts
20001
Still Water Equity
Hill and Sons Excavation
May 29, 2020 F. Pelton
12:30 PM 3:00
867
1165 5184
10Bottom of finish grade 7.3
132
95%
Approximately A.8 and 3.75 of Building 11.
Bottom of finish grade
Pit Run
96%
132
7.7
127
136.8
96%
132
4.963
126.3
132.6
Pit Run
Bottom of finish grade
Approximately A.5 and 2.3 of Building 11.
95%
132
4.591
125.2
131
Pit Run
Bottom of finish grade
Approximately A.25 and 1.2 of Building 11.
97%
132
5.918
127.8
135.4
Pit Run
Bottom of finish grade
Approximately A.8 and 1.2 of Building 11.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.01 08:21:44
-06'00'
12
12
12
12
1
125
133.9Approximately A.5 and 3.75 of Building 11.
Pit Run
5
2
3
4