Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00736 - The Grove at Thomson Farms - Linden - 30 Unit Bldg 7Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Concrete 05-11-2020 cloudy 1:30 PM 70-73 7:00 PM Observed the concrete placement of the foundation and exterior walls of Building 11. Digitally signed by Jacob P Christensen Date: 2020.05.19 11:49:57 -06'00'8129697 F Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 05-14-2020 cloudy 1:30 PM 54 6:00 PM Observed the exterior walls placement of Building 11. Digitally signed by Jacob P Christensen Date: 2020.05.19 11:53:32 -06'00'8129697 F Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 05/13/2020 Cloudy/windy 12:30 PM 59 6:00 PM Observed the concrete placement of the Exterior walls and foundation of Building 11. Digitally signed by Jacob P Christensen Date: 2020.05.19 11:51:49 -06'00'8129697 F Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: