HomeMy WebLinkAboutSOIL DENSITY - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Thompson Farms
20001
Stillwater Equity Partners
Hill and Son Excavation
05/18/2020 F Pelton
12:00 PM 2:30 PM
867
1178 5179
BSBottom of Slab 5.5
128
96%
Approximately C.25 and 1.25 of Building 7.
Bottom of Slab
3/4
98%
128
4.696
125.1
130.9
97%
128
4.649
124.1
129.9
3/4
Bottom of Slab
Approximately C.5 and 1.4 of Building 7.
99%
128
98.68
126.3
130.7
3/4
Bottom of Slab
Approximately C.5 and 2 of Building 7.
101%
128
3.851
129.8
134.8
3/4
Bottom of Slab
Approximately C.65 and 2 of Building 7.
97%
128
3.819
124.2
128.9
3/4
Bottom of Slab
Approximately C.65 and 1.4 of Building 7.
97%
128
3.32
124.3
128.4
3/4
Bottom of Slab
Approximately C.8 and 1.4 of Building 7.
Digitally signed by Jacob P
Christensen
Date: 2020.05.19 11:43:13 -06'00'
BS
BS
BS
BS
BS
BS
1
123
129.6Approximately C.25 and 1.5 of Building 7.
3/4
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
98%
128
3.976
125.8
130.8
3/4
Bottom of Slab
Approximately C.8 and 2 of Building 7.
128
96%
5.281
122.8
129.3
3/4
Bottom of Slab
Approximately C.8 and 3.7 of Building 7.
128
101%
4.46
129.4
135.1
3/4
Bottom of Slab
Approximately C.65 and 3.7 of Building 7.
128
99%
3.852
127.1
132
3/4
Bottom of Slab
Approximately C.45 and 3.7 of Building 7.
128
96%
3.9
122.9
127.8
3/4
Bottom of Slab
Approximately C.15 and 3.7 of Building 7.
128
97%
4.599
124.3
130
3/4
Bottom of Slab
Approximately D.5 and 3.7 of Building 7.
128
98%
4.192
125.4
130.6
3/4
Bottom of Slab
Approximately D.25 and 2.5 of Building 7.
128
95%
4.717
121.2
127
3/4
Bottom of Slab
Approximately D.75 and 2.5 of Building 7.
128
96%
3.98Bottom of Slab
127.9Approximately D.5 and 1.4 of Building 7.
3/4
123
BS
BS
BS
BS
BS
BS
BS
BS
BS
8
11
15
16
9
10
14
13
12