Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 6 - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Concrete 05/19/2020 cloudy 5:00 AM 42-46 10:30 AM I arrived on site and began my observation of the concrete placement and reinforcement of the interior slab of Building 7. The reinforcement was in conformance with the project plans. The contractor manually consolidated the concrete as it was placed and was in conformance with the project plans. I observed the duration of the concrete pour. Digitally signed by Jacob P Christensen Date: 2020.05.20 14:18:22 -06'00'8129697 Concrete reinforcement Concrete reinforcement Concrete reinforcement F Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: