Loading...
HomeMy WebLinkAboutSOIL DENSITY 2 - 19-00740 - The Grove at Thomson Farms - Blackoak - 20 Units - Bldg 5In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Thompson Farms 20001 Stillwater Equity Partners Hill and Son Excavation 05/26/2020 F Pelton 1:45 4:45 00443 965 1587/5024 12Bottom of Footing 3.451 132 97% Approximately E.8 and 3.8 of Building 5. Bottom of Footing Pit Run 98% 132 3.136 128.9 133 97% 132 3.759 128.3 133.1 Pit Run Bottom of Footing Approximately E.8 and 2.5 of Building 5. 97% 132 3.487 128 132.4 Pit Run Bottom of Footing Approximately E.5 and 1.2 of Building 5. 95% 132 4.321 125.4 130.8 Pit Run Bottom of Footing Approximately D.5 and 2.5 of Building 5. 97% 132 3.765 128 132.9 Pit Run Bottom of Footing Approximately B.5 and 1.2 of Building 5. 97% 132 4.584 127.4 133.2 Pit Run Bottom of Footing Approximately B.5 and 2.5 of Building 5. Digitally signed by Jacob P Christensen Date: 2020.05.28 08:03:37 -06'00' 10 12 12 12 10 10 1 128 132Approximately D and 3.8 of Building 5. Pit Run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 98% 132 4.705 129.2 135.2 Pit Run Bottom of Footing Approximately A.2 and 2.5 of Building 5. 132 97% 5.226 127.8 134.4 Pit Run Bottom of Footing Approximately B and 3.8 of Building 5. 12 12 8 9 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ Thompson Farms Apts 20001 Still Water Equity Hill and Sons Excavating 05/20/2020 F Pelton 12:45,5:00 2:45,7:00 76561 785 2779 12Bottom of Finish Grade 5.3 132 96% Approximately E.75 and 1.25 of Building 5. Bottom of Finish Grade Pit Run 96% 132 5.6 126.1 133.2 95% 132 5.5 125.9 132.8 Pit Run Bottom of Finish Grade Approximately E.5 and 2.5 of Building 5. 96% 132 5.4 127 133.8 Pit Run Bottom of Finish Grade Approximately E.25 and 3.6 of Building 5. 96% 132 5.4 126.2 133 Pit Run Bottom of Finish Grade Approximately E.75 and 3.6 of Building 5. Digitally signed by Jacob P Christensen Date: 2020.05.28 07:59:42 -06'00' 12 10 10 10 1 127 133.8Approximately E.25 and 1.25 of Building 5. Pit Run 5 2 3 4 In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Thompson Farms 20001 Stillwater Equity Partners Hill and Son Excavation 05-13-2020 F Pelton 12:30 PM 6:00 PM 443 972 5041 12Bottom of Footing 5.288 132 98% Approximately A.5 and 3.8 of Building 5. Bottom of Footing Pit Run 97% 132 6.174 128.3 136.2 98% 132 4.63 128.8 134.7 Pit Run Bottom of Footing Approximately B.5 and 2.5 of Building 5. 97% 132 3.883 127.5 132.5 Pit Run Bottom of Footing Approximately C.5 and 3.8 of Building 5. 97% 132 4.527 127.7 133.5 Pit Run Bottom of Footing Approximately E.8 and 3.8 of Building 5. 99% 132 4.936 130.4 136.8 Pit Run Bottom of Footing Approximately E.8 and 2.5 of Building 5. 99% 132 4.011 130.9 136.1 Pit Run Bottom of Footing Approximately E.2 and 1.25 of Building 5. Digitally signed by Jacob P Christensen Date: 2020.05.19 11:35:08 -06'00' 12 12 10 12 12 12 1 130 136.4Approximately A.25 and 2.5 of Building 5. Pit Run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 97% 132 4.142 128.1 133.4 Pit Run Bottom of Footing Approximately D.5 and 2.5 of Building 5. 132 95% 4.772 124.9 130.9 Pit Run Bottom of Footing Approximately C.25 and 1.25 of Building 5. 132 95% 4.262 125.9 131.3 Pit Run Bottom of Footing Approximately A.45 and 1.25 of Building 5. 12 12 12 8 9 10