HomeMy WebLinkAboutSOIL DENSITY TEST - 19-00738 - The Grove at Thomson Farms - Whitepine - 20 Units - Bldg 3In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
Thompson Farms Apts
20001
Still Water Equity
Hill and Sons Excavation
May 18, 2020 E. Jenkins
8:00 AM 10:00 AM
76562
693 2774
6Bottom of Floor Slab 2.1
128
95%
Base for Floor pad building 3. East portion. Near NE corner.
Bottom of Floor Slab
3/4 Base
96%
128
1.9
123
125.4
95%
128
2.3
121.4
124.3
3/4 Base
Bottom of Floor Slab
Base for Floor pad building 3. Center portion. N side.
95%
128
2.3
121.9
124.7
3/4 Base
Bottom of Floor Slab
Base for Floor pad building 3. Center portion. S side.
Digitally signed by Jacob P
Christensen
Date: 2020.05.19 11:44:53 -06'00'
Tests 3-4 were achieved after many failed tests. Tests 3-4 will be retested at a later time after the contractor
adds moisture and re-compact the material.
6
6
6
1
122
124.2Base for Floor pad building 3. East portion. Near SW corner.
3/4 Base
2
3
4