HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00306 - Henderson Apartments - Bldg #2, 24 UnitsPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/04/2020 9:07 am
Permit Details Permit Number: 10-00306
Henderson Apartments - Bldg #2, 24 Units
649 S 2nd W
New Multi-Family Residence
Permit Issued Date: 08/02/2016
Permit Issued Date: 08/02/2016
Permit Inspection Statistics
19Total Inspections Completed:
14Total Inspections Passed:
Inspection Pass Rate: 73.68%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
Footings Building 2 North and West and East look good.Inspector Comments:
Footings and rebar look goodInspector Comments:
Footomgs and rebar look good per plansInspector Comments:
Footings for building 4 look goodInspector Comments:
08/02/2016PassJohn BerryFooting Inspection
Interior footings and rebar look goodInspector Comments:
08/02/2016PassJohn BerryFoundation Inspection
West half of building 2 foundation looks goodInspector Comments:
Interior footings and rebar look goodInspector Comments:
08/02/2016PassJohn BerryFraming/Structure Inspection
Framing looks very good. Okay to insulateInspector Comments:
First 2 floors require 4" oc edge nailing. Many areas exceed this.Inspector Comments:
08/02/2016PassJohn BerrySheeting
Exterior sheathing and roof sheathing ok to coverInspector Comments:
Building 2 3rd & 4th floors ok to drywallInspector Comments:
08/02/2016PassJohn BerryInsulation Inspection
1st and 2nd floors still in workInspector Comments:
08/02/2016N/AJohn BerrySheeting
08/02/2016N/AJohn BerrySheetrock/Drywall Inspection
Corridor Panels not tied inInspector Comments:
Clean out covers (Plumbing) in corridor walls need to be metalInspector Comments:
Fire caulk sprinkler lines in stairwellInspector Comments:
Each building needs a number and each unitInspector Comments:
08/02/2016PassQuinton OwensBuilding Final
Anchor rooftop (ships ladder)Inspector Comments:
08/02/2016N/AJohn BerrySidewalk Inspection
Page 1 of 3
(Continued)
Permit Details Permit Number: 10-00306
Henderson Apartments - Bldg #2, 24 Units
649 S 2nd W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 06/04/2020 9:07 am
Permit
Inspection
Summary
Electrical
08/02/2016N/ABret StoddardElectrical Underground Inspection
08/02/2016PassBret StoddardResidential Electrical Service Inspection
Approved for cover on all units
2nd floor Corridor panel not
Inspector Comments:
08/02/2016N/ABret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Fire
08/02/2016PassJohn BerryFire Sprinkler Rough-in
Fire Caulking 3rd & 4th floors building 2 looks good
Ok to cover
Inspector Comments:
200 psi 1:14 pm (8/22)Inspector Comments:
200 psi 3:15 pm (8/22)Inspector Comments:
Head by Riser not below ceilingInspector Comments:
Knox box needs keysInspector Comments:
Extinguisher missing inspection tagsInspector Comments:
FDC's missing ringsInspector Comments:
Jon Berry Walked entire building for head inspectionInspector Comments:
extra sprinkler heads (6 of each)Inspector Comments:
Paperwork from sprinkler and alarm contractorInspector Comments:
Elevator recall done. Check temperatures of heat detectorsInspector Comments:
Walked and signed all devicesInspector Comments:
Need 24 hour test when rest of system done. Verified a/c lastInspector Comments:
08/02/2016PassBret StoddardFire Sprinkler Final Inspection
Approved for final and CO/Inspector Comments:
Mechanical
08/02/2016PassDon AllenHVAC Rough-in
Gas line building 2 good at #62
Sheathing building 3A ok to cover
Inspector Comments:
08/02/2016PassDon AllenHVAC Final Inspection
Building 2 HVAC final CompletedInspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 10-00306
Henderson Apartments - Bldg #2, 24 Units
649 S 2nd W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 06/04/2020 9:07 am
Permit
Inspection
Summary
Plumbing
Approved to cover main line onlyInspector Comments:
Approved for ground work drainage only!Inspector Comments:
08/02/2016PassDon AllenPlumbing Underground Inspection
Rough goodInspector Comments:
08/02/2016PassJohn BerryPlumbing Rough-in
GC: Chad Richards 313-2092Inspector Comments:
08/02/2016PassDon AllenPlumbing Final Inspection
Check Hangers in mendal room when guy backInspector Comments:
Page 3 of 3