Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00306 - Henderson Apartments - Bldg #2, 24 UnitsPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/04/2020 9:07 am Permit Details Permit Number: 10-00306 Henderson Apartments - Bldg #2, 24 Units 649 S 2nd W New Multi-Family Residence Permit Issued Date: 08/02/2016 Permit Issued Date: 08/02/2016 Permit Inspection Statistics 19Total Inspections Completed: 14Total Inspections Passed: Inspection Pass Rate: 73.68% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Footings Building 2 North and West and East look good.Inspector Comments: Footings and rebar look goodInspector Comments: Footomgs and rebar look good per plansInspector Comments: Footings for building 4 look goodInspector Comments: 08/02/2016PassJohn BerryFooting Inspection Interior footings and rebar look goodInspector Comments: 08/02/2016PassJohn BerryFoundation Inspection West half of building 2 foundation looks goodInspector Comments: Interior footings and rebar look goodInspector Comments: 08/02/2016PassJohn BerryFraming/Structure Inspection Framing looks very good. Okay to insulateInspector Comments: First 2 floors require 4" oc edge nailing. Many areas exceed this.Inspector Comments: 08/02/2016PassJohn BerrySheeting Exterior sheathing and roof sheathing ok to coverInspector Comments: Building 2 3rd & 4th floors ok to drywallInspector Comments: 08/02/2016PassJohn BerryInsulation Inspection 1st and 2nd floors still in workInspector Comments: 08/02/2016N/AJohn BerrySheeting 08/02/2016N/AJohn BerrySheetrock/Drywall Inspection Corridor Panels not tied inInspector Comments: Clean out covers (Plumbing) in corridor walls need to be metalInspector Comments: Fire caulk sprinkler lines in stairwellInspector Comments: Each building needs a number and each unitInspector Comments: 08/02/2016PassQuinton OwensBuilding Final Anchor rooftop (ships ladder)Inspector Comments: 08/02/2016N/AJohn BerrySidewalk Inspection Page 1 of 3 (Continued) Permit Details Permit Number: 10-00306 Henderson Apartments - Bldg #2, 24 Units 649 S 2nd W New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/04/2020 9:07 am Permit Inspection Summary Electrical 08/02/2016N/ABret StoddardElectrical Underground Inspection 08/02/2016PassBret StoddardResidential Electrical Service Inspection Approved for cover on all units 2nd floor Corridor panel not Inspector Comments: 08/02/2016N/ABret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Fire 08/02/2016PassJohn BerryFire Sprinkler Rough-in Fire Caulking 3rd & 4th floors building 2 looks good Ok to cover Inspector Comments: 200 psi 1:14 pm (8/22)Inspector Comments: 200 psi 3:15 pm (8/22)Inspector Comments: Head by Riser not below ceilingInspector Comments: Knox box needs keysInspector Comments: Extinguisher missing inspection tagsInspector Comments: FDC's missing ringsInspector Comments: Jon Berry Walked entire building for head inspectionInspector Comments: extra sprinkler heads (6 of each)Inspector Comments: Paperwork from sprinkler and alarm contractorInspector Comments: Elevator recall done. Check temperatures of heat detectorsInspector Comments: Walked and signed all devicesInspector Comments: Need 24 hour test when rest of system done. Verified a/c lastInspector Comments: 08/02/2016PassBret StoddardFire Sprinkler Final Inspection Approved for final and CO/Inspector Comments: Mechanical 08/02/2016PassDon AllenHVAC Rough-in Gas line building 2 good at #62 Sheathing building 3A ok to cover Inspector Comments: 08/02/2016PassDon AllenHVAC Final Inspection Building 2 HVAC final CompletedInspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 10-00306 Henderson Apartments - Bldg #2, 24 Units 649 S 2nd W New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/04/2020 9:07 am Permit Inspection Summary Plumbing Approved to cover main line onlyInspector Comments: Approved for ground work drainage only!Inspector Comments: 08/02/2016PassDon AllenPlumbing Underground Inspection Rough goodInspector Comments: 08/02/2016PassJohn BerryPlumbing Rough-in GC: Chad Richards 313-2092Inspector Comments: 08/02/2016PassDon AllenPlumbing Final Inspection Check Hangers in mendal room when guy backInspector Comments: Page 3 of 3