Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00307 - Henderson Apartments - Bldg #4, 24 UnitsPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/04/2020 9:06 am Permit Details Permit Number: 10-00307 Henderson Apartments - Bldg #4, 24 Units 649 S 2nd W New Multi-Family Residence Permit Issued Date: 08/02/2016 Permit Inspection Statistics 20Total Inspections Completed: 15Total Inspections Passed: Inspection Pass Rate: 75.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 08/02/2016PassJohn BerryFoundation Inspection Foundation walls and rebar look goodInspector Comments: 08/02/2016PassJohn BerryFraming/Structure Inspection Anchor bolts missing in hallway 1st floor and shear wall between south unitsInspector Comments: 08/02/2016PassJohn BerryFooting Inspection All exterior insulation okay to cover on 4th floor. 2nd East units don't have sound insulation yet. Framing completed. Inspector Comments: 3rd and 4th floor windows need to be foamed to seal. Insulation okay to cover both 3rd and 4th floors. Inspector Comments: Seal around windows. Insulation okay.Inspector Comments: No insulation over Foundation walls. No vapor Barrier at exterior bathroom walls. Insulation should not be compacted. Cut around wires as needed. Cut to fit stud cavity. Some cavities short insulation behind interior partitions. Inspector Comments: 08/02/2016PassJohn BerryInsulation Inspection Still no vapor barrier at exterior bath walls. Still missing insulation 2nd unit from west, north side, bedroom corner. Water leaking from floor above through insulation. No drywall until insulation has dried. Inspector Comments: 08/02/2016N/AJohn BerrySheetrock/Drywall Inspection 08/02/2016N/AJohn BerrySheeting 08/02/2016PassJohn BerryBuilding Final Building final completeInspector Comments: 08/02/2016N/AJohn BerrySidewalk Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 10-00307 Henderson Apartments - Bldg #4, 24 Units 649 S 2nd W New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/04/2020 9:06 am Permit Inspection Summary Electrical 08/02/2016N/ABret StoddardElectrical Underground Inspection 08/02/2016PassBret StoddardCommercial Electrical Rough-in Approved for cover on building #4Inspector Comments: 08/02/2016N/ABret StoddardResidential Electrical Service Inspection 08/02/2016PassJohn BerryElectrical Final Inspection SFR-B,A,R, MFR-A,R Heat tape not done. 4101 not done. Lights not done. Need to band areas across water meters Inspector Comments: 08/02/2016PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for final and coInspector Comments: Fire 08/02/2016PassJohn BerryFire Sprinkler Rough-in Sprinkler lines okay to coverInspector Comments: 08/02/2016PassJohn BerryFire Sprinkler Final Inspection Approved for final and COInspector Comments: Mechanical 08/02/2016PassJohn BerryHVAC Rough-in HVAC Building 4 Rough looks goodInspector Comments: 08/02/2016PassDon AllenHVAC Final Inspection HVAC Final Completed on Building 4Inspector Comments: Plumbing 08/02/2016PassDon AllenPlumbing Underground Inspection Rough plumbing on #4 complete and tested. ApprovedInspector Comments: 08/02/2016PassDon AllenPlumbing Rough-in 08/02/2016PassDon AllenPlumbing Final Inspection Need to put floor drain covers on in man-gal roomInspector Comments: Page 2 of 2