Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00311 - Henderson Apartments - Bldg #3A, 32 UnitsPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/04/2020 9:03 am Permit Details Permit Number: 10-00311 Henderson Apartments - Bldg #3A, 32 Units 649 S 2nd W New Multi-Family Residence Permit Issued Date: 08/03/2016 Permit Inspection Statistics 12Total Inspections Completed: 9Total Inspections Passed: Inspection Pass Rate: 75.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 3A North 1/2 Foundation looks goodInspector Comments: East and West foundation walls of 3A South look goodInspector Comments: 08/03/2016PassJohn BerryFoundation Inspection Foundation common area #3 looks goodInspector Comments: Interior footings North and building 3A look goodInspector Comments: 08/03/2016PassJohn BerryFooting Inspection Interior footings look good. Rebar to be inspected by SI Gary from Strata.Inspector Comments: Foam windowsInspector Comments: Insulation 3rd floor okay to cover. Note: Finish 2 south units. Inspector Comments: Vapor barrier not installed. Windows not foamed. Inspector Comments: Insulation levels 1 and 2 completed.Inspector Comments: Okay to cover 4th floorInspector Comments: 08/03/2016PassJohn BerryInsulation Inspection Common area Mineral wool looks good. Okay to cover, Window need to be foamed. Okay to cover insulation. Inspector Comments: 08/03/2016N/AJohn BerrySheetrock/Drywall Inspection 08/03/2016N/AJohn BerrySheeting Approved in all units except common areas, mechanical rooms, main entrance corridor, and need to inspect roof top units. Inspector Comments: #2107 Negative pressure in mechanical closet. Add return air grill to hallway. (2207,2307,2407). #2407 AC Lines penetrating roof don't seem to be sealed. (2406) Inspector Comments: Leaking toilet in 2404 (I shut water line to toilet). Patch holes in laundry wall #2208 (on punch list). Fire caulk fire riser penetration in wall in North stairwell. Inspector Comments: 08/03/2016PassJohn BerryBuilding Final Building final completed 3A and 3B. Project and P&Z final completed.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00311 Henderson Apartments - Bldg #3A, 32 Units 649 S 2nd W New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/04/2020 9:03 am Permit Inspection Summary Electrical 08/03/2016N/AJohn BerryElectrical Rough-in SFR-A,R,B, MFR-A,R Approved for cover on building 3A except corridor panels and SE cable by main panels. Inspector Comments: 08/03/2016PassJohn BerryResidential Electrical Service Inspection Approved to be energized for permanent power. (1000A)Inspector Comments: 2208 Rev Polarity kitchen by fridge. 2307 GFCI won't reset. 2404 Dryer cover missing. Approved on all units except those listed above and mechanical rooms, common areas, and main entrance/corridor. Inspector Comments: Fire alarm not complete (11/22). Electrical Approved for final and CO entire complex. 5 minute test 4:45 11/22 ended - failed. 24 hour test started at 4:42 pm (11/22). Inspector Comments: 08/03/2016PassJohn BerryElectrical Final Inspection SFR-B,A,R, MFR-A,R Approved to be energized for power.Inspector Comments: Mechanical HVAC Rough building 3A looks goodInspector Comments: OK to cover in commons areaInspector Comments: Levels 2 and 3 commons area okay to coverInspector Comments: HVAC 1 and 4 looks goodInspector Comments: 08/03/2016PassDon AllenHVAC Rough-in Insulation 1st floor commons okay to cover.Inspector Comments: HVAC CompletedInspector Comments: 08/03/2016PassDon AllenHVAC Final Inspection Approved on Mechanical rooms (north end)Inspector Comments: Plumbing 08/03/2016PassDon AllenPlumbing Final Inspection 2101 2nd bath water on floor. Okay 2101 kitchen sink hookup. Inspector Comments: Page 2 of 2