HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00311 - Henderson Apartments - Bldg #3A, 32 UnitsPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/04/2020 9:03 am
Permit Details Permit Number: 10-00311
Henderson Apartments - Bldg #3A, 32 Units
649 S 2nd W
New Multi-Family Residence
Permit Issued Date: 08/03/2016
Permit Inspection Statistics
12Total Inspections Completed:
9Total Inspections Passed:
Inspection Pass Rate: 75.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
3A North 1/2 Foundation looks goodInspector Comments:
East and West foundation walls of 3A South look goodInspector Comments:
08/03/2016PassJohn BerryFoundation Inspection
Foundation common area #3 looks goodInspector Comments:
Interior footings North and building 3A look goodInspector Comments:
08/03/2016PassJohn BerryFooting Inspection
Interior footings look good. Rebar to be inspected by SI Gary from Strata.Inspector Comments:
Foam windowsInspector Comments:
Insulation 3rd floor okay to cover.
Note: Finish 2 south units.
Inspector Comments:
Vapor barrier not installed.
Windows not foamed.
Inspector Comments:
Insulation levels 1 and 2 completed.Inspector Comments:
Okay to cover 4th floorInspector Comments:
08/03/2016PassJohn BerryInsulation Inspection
Common area
Mineral wool looks good. Okay to cover,
Window need to be foamed.
Okay to cover insulation.
Inspector Comments:
08/03/2016N/AJohn BerrySheetrock/Drywall Inspection
08/03/2016N/AJohn BerrySheeting
Approved in all units except common areas, mechanical rooms, main entrance
corridor, and need to inspect roof top units.
Inspector Comments:
#2107 Negative pressure in mechanical closet. Add return air grill to hallway.
(2207,2307,2407).
#2407 AC Lines penetrating roof don't seem to be sealed. (2406)
Inspector Comments:
Leaking toilet in 2404 (I shut water line to toilet).
Patch holes in laundry wall #2208 (on punch list).
Fire caulk fire riser penetration in wall in North stairwell.
Inspector Comments:
08/03/2016PassJohn BerryBuilding Final
Building final completed 3A and 3B. Project and P&Z final completed.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00311
Henderson Apartments - Bldg #3A, 32 Units
649 S 2nd W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 06/04/2020 9:03 am
Permit
Inspection
Summary
Electrical
08/03/2016N/AJohn BerryElectrical Rough-in SFR-A,R,B, MFR-A,R
Approved for cover on building 3A except corridor panels and SE cable by main
panels.
Inspector Comments:
08/03/2016PassJohn BerryResidential Electrical Service Inspection
Approved to be energized for permanent power. (1000A)Inspector Comments:
2208 Rev Polarity kitchen by fridge.
2307 GFCI won't reset.
2404 Dryer cover missing.
Approved on all units except those listed above and mechanical rooms, common
areas, and main entrance/corridor.
Inspector Comments:
Fire alarm not complete (11/22).
Electrical Approved for final and CO entire complex.
5 minute test 4:45 11/22 ended - failed.
24 hour test started at 4:42 pm (11/22).
Inspector Comments:
08/03/2016PassJohn BerryElectrical Final Inspection SFR-B,A,R, MFR-A,R
Approved to be energized for power.Inspector Comments:
Mechanical
HVAC Rough building 3A looks goodInspector Comments:
OK to cover in commons areaInspector Comments:
Levels 2 and 3 commons area okay to coverInspector Comments:
HVAC 1 and 4 looks goodInspector Comments:
08/03/2016PassDon AllenHVAC Rough-in
Insulation 1st floor commons okay to cover.Inspector Comments:
HVAC CompletedInspector Comments:
08/03/2016PassDon AllenHVAC Final Inspection
Approved on Mechanical rooms (north end)Inspector Comments:
Plumbing
08/03/2016PassDon AllenPlumbing Final Inspection
2101 2nd bath water on floor.
Okay 2101 kitchen sink hookup.
Inspector Comments:
Page 2 of 2