Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00312 - Henderson Apartments - Bldg #3B, 32 UnitsPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/04/2020 9:02 am Permit Details Permit Number: 10-00312 Henderson Apartments - Bldg #3B, 32 Units 649 S 2nd W New Multi-Family Residence Permit Issued Date: 08/03/2016 Permit Inspection Statistics 9Total Inspections Completed: 9Total Inspections Passed: Inspection Pass Rate: 100.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Footings for 3B look goodInspector Comments: 08/03/2016PassJohn BerryFooting Inspection Interior footings and rebar look goodInspector Comments: 3B East and South foundation look goodInspector Comments: 08/03/2016PassJohn BerryFoundation Inspection 3B foundation and rebar look goodInspector Comments: Exterior sheathing okay to coverInspector Comments: 08/03/2016PassJohn BerryFraming/Structure Inspection Nuts and washers missing N unit and commons wall SW Unit against hall needs drywall behind it 4 story chase - drywall Inspector Comments: Insulation on 4th floor okay to coverInspector Comments: R-21 on exterior with vapor barrier. Okay to drywall. Inspector Comments: Insulation not completed. Windows not foamed. Inspector Comments: Insulation 2nd floor looks good. Okay to cover. Inspector Comments: Insulation not completed 1st level. Drywall levels 3 and 4 okay to cover. Inspector Comments: 08/03/2016PassJohn BerryInsulation Inspection Insulation level 1 okay to cover. Drywall installed behind tub. Drywall level 2 okay to cover. Inspector Comments: Approved on units on 1,2,3 floors and commons area level 2.Inspector Comments: 08/03/2016PassJohn BerryBuilding Final 2211 Laundry Room - Water door. N stairwell 1st floor handrail. Fire door 3rd floor. S Stairwell Handrail. Note: Accessible units will need to be to full when needed - tub and vanity etc. Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00312 Henderson Apartments - Bldg #3B, 32 Units 649 S 2nd W New Multi-Family Residence Permit Status of (Open) as of Report Date: 06/04/2020 9:02 am Permit Inspection Summary Electrical 4th floor approved to insulate. 3rd floor not complete - SE; Fire Wire. Nail plate above panels. Not commons area - not complete Inspector Comments: Approved for cover - 3rd floor - entire #3BInspector Comments: Approved for cover commons areas.Inspector Comments: 08/03/2016PassBret StoddardCommercial Electrical Rough-in Approved for units on 4th floor corridor.Inspector Comments: Mechanical Broken elbow 1st floor East middle unit and South unit. 2nd and 3rd floors okay. 4th in work. Inspector Comments: Re-inspect c/w okay to cover.Inspector Comments: 08/03/2016PassDon AllenHVAC Rough-in Rough in completed all 4 floors.Inspector Comments: 08/03/2016PassDon AllenHVAC Final Inspection 3B HVAC Final completed. Note: Several furnaces missing covers on Bottom of furnace. Several furnaces missing drywall on returns. Inspector Comments: Plumbing Section of 6" A135 needed to be installed under building foundation, 100' section; will be connected to on both upper and lower end. Pipe was tested with 10' head of water. Inspector Comments: 08/03/2016PassDon AllenPlumbing Underground Inspection 3" drain line, 3B, 4th floor, East end not properly graded. Do not cover. Okay to cover all other walls, ceilings, etc. Inspector Comments: Page 2 of 2