HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00319 - Dr. Hopkin Medical OfficePermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/04/2020 8:58 am
Permit Details Permit Number: 10-00319
Dr. Hopkin Medical Office
255 N 3rd E
New Commercial Building
Permit Issued Date: 01/21/2010
Permit Inspection Statistics
13Total Inspections Completed:
13Total Inspections Passed:
Inspection Pass Rate: 100.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
08/03/2016PassJohn BerryCommercial Footing Inspection
Footings and rebar look good.Inspector Comments:
08/03/2016PassJohn BerryFoundation Inspection
Okay to pourInspector Comments:
08/03/2016PassJohn BerrySheeting
Sheathing nailing looks good.
Anchor bolts each side o front door and lag bolts in place.
Anchors and lag bolts in place for front columns.
Inspector Comments:
08/03/2016PassJohn BerryFraming/Structure Inspection
Framing looks good.
Ext. PCW
Inspector Comments:
08/03/2016PassJohn BerrySheetrock/Drywall Inspection
Drywall (except X-RAY Room) okay to cover.Inspector Comments:
08/03/2016PassJohn BerryBuilding Final
Building final completed.
Fire ext (2) in place.
Note: Landscaping in work
Inspector Comments:
Electrical
08/03/2016PassBret StoddardCommercial Electrical Rough-in
Approved for cover.
*Service Approved to be energized for permanent power.
Inspector Comments:
08/03/2016PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Outside lights not installed.
Power for Rain Bird.
Closet light missing reception area.
Outlet not finished reception area cabinet.
X-Ray machine not wired correctly.
GFCI protection for kitchen receptacles (6' sink) and drinking fountain.
Reception area receptacles not installed.
Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00319
Dr. Hopkin Medical Office
255 N 3rd E
New Commercial Building
Permit Status of (Open) as of Report Date: 06/04/2020 8:58 am
Permit
Inspection
Summary
Mechanical
08/03/2016PassDon AllenHVAC Rough-in
HVAC Re-inspection looks goodInspector Comments:
08/03/2016PassDon AllenHVAC Final Inspection
HVAC Final completedInspector Comments:
Plumbing
08/03/2016PassDon AllenPlumbing Sewer
Good - okay to coverInspector Comments:
08/03/2016PassDon AllenPlumbing Rough-in
64 psi at 4:00 / 64 psi @5:10 okay. Gas line tagged.
Finish insulating ducts on South side.
Inspector Comments:
08/03/2016PassDon AllenPlumbing Final Inspection
Caulk 2 S.S. sinks corrected on the spotInspector Comments:
Page 2 of 2