Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00319 - Dr. Hopkin Medical OfficePermit Inspection Summary Permit Status of (Open) as of Report Date: 06/04/2020 8:58 am Permit Details Permit Number: 10-00319 Dr. Hopkin Medical Office 255 N 3rd E New Commercial Building Permit Issued Date: 01/21/2010 Permit Inspection Statistics 13Total Inspections Completed: 13Total Inspections Passed: Inspection Pass Rate: 100.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 08/03/2016PassJohn BerryCommercial Footing Inspection Footings and rebar look good.Inspector Comments: 08/03/2016PassJohn BerryFoundation Inspection Okay to pourInspector Comments: 08/03/2016PassJohn BerrySheeting Sheathing nailing looks good. Anchor bolts each side o front door and lag bolts in place. Anchors and lag bolts in place for front columns. Inspector Comments: 08/03/2016PassJohn BerryFraming/Structure Inspection Framing looks good. Ext. PCW Inspector Comments: 08/03/2016PassJohn BerrySheetrock/Drywall Inspection Drywall (except X-RAY Room) okay to cover.Inspector Comments: 08/03/2016PassJohn BerryBuilding Final Building final completed. Fire ext (2) in place. Note: Landscaping in work Inspector Comments: Electrical 08/03/2016PassBret StoddardCommercial Electrical Rough-in Approved for cover. *Service Approved to be energized for permanent power. Inspector Comments: 08/03/2016PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Outside lights not installed. Power for Rain Bird. Closet light missing reception area. Outlet not finished reception area cabinet. X-Ray machine not wired correctly. GFCI protection for kitchen receptacles (6' sink) and drinking fountain. Reception area receptacles not installed. Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 10-00319 Dr. Hopkin Medical Office 255 N 3rd E New Commercial Building Permit Status of (Open) as of Report Date: 06/04/2020 8:58 am Permit Inspection Summary Mechanical 08/03/2016PassDon AllenHVAC Rough-in HVAC Re-inspection looks goodInspector Comments: 08/03/2016PassDon AllenHVAC Final Inspection HVAC Final completedInspector Comments: Plumbing 08/03/2016PassDon AllenPlumbing Sewer Good - okay to coverInspector Comments: 08/03/2016PassDon AllenPlumbing Rough-in 64 psi at 4:00 / 64 psi @5:10 okay. Gas line tagged. Finish insulating ducts on South side. Inspector Comments: 08/03/2016PassDon AllenPlumbing Final Inspection Caulk 2 S.S. sinks corrected on the spotInspector Comments: Page 2 of 2