HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00368 - Teriyaki Express - RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 06/03/2020 1:06 pm
Permit Details Permit Number: 10-00368
Teriyaki Express - Remodel
110 W 4th S
Commercial - Remodel
Permit Issued Date: 12/07/2010
Permit Inspection Statistics
11Total Inspections Completed:
9Total Inspections Passed:
Inspection Pass Rate: 81.82%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
05/02/2011PassJohn BerryCommercial Sheetrock/Drywall Inspection
Drywall ok to tape.Inspector Comments:
06/10/2011FailJohn BerryCommercial Building Final
Building Final Copleted.
HVAC rep's CFM test on hoods & m/up air.
Inspector Comments:
06/23/2011PassQuinton OwensCommercial Building Final
Hood fire suppression system okay.
Building final okay except flow for hood & m/up air.
Inspector Comments:
Electrical
04/22/2011PassBret StoddardCommercial Electrical Rough-in
Approved for cover - walls - framed.Inspector Comments:
06/10/2011PassBret StoddardElectrical Final Inspection COM-A,R,T
Snoasis - permanent power needed - no cords.
Clean up panel room - no romex (NP).
Breaker locks XZ warmer and steam table.
Under Stairs - Clean up wiring.
Mount box in entry way.
Inspector Comments:
Door locked (10:35 am).Inspector Comments:
07/11/2011PassBret StoddardElectrical Final Inspection COM-A,R,T
Approved for a final & CO.Inspector Comments:
Fire
06/16/2011PassJohn BerryFire Sprinkler Final Inspection
Page 1 of 2
(Continued)
Permit Details Permit Number: 10-00368
Teriyaki Express - Remodel
110 W 4th S
Commercial - Remodel
Permit Status of (Open) as of Report Date: 06/03/2020 1:06 pm
Permit
Inspection
Summary
Mechanical
Furnace Install:
Furnace installation looks good.
Existing gas line not tested.
Note: Gas line shut off to rest of the building & end capped.
Inspector Comments:
12/06/2010PassJohn BerryHVAC Rough-in
Handrail needed both sides 34-38" w/guard rail at 42".
Reinstall emergency exit light in main area.
Drywall under stairs.
Block off upstairs until hand/guard rail fixed.
*OK to open for customers in 60 days.
Inspector Comments:
08/25/2011PassJohn BerryHVAC Final Inspection
Air flow tested good.
Return hand rails to wall.
Inspector Comments:
Plumbing
06/03/2011FailJohn BerryPlumbing Final Inspection
1. Needs backflow protector (DCVA).
2. Send copy of backflow certification to City of Rexburg.
Inspector Comments:
06/10/2011PassJohn BerryPlumbing Final Inspection
Re-inspection C/W.
Owner will forward inspection report from testing agency.
Inspector Comments:
Page 2 of 2