Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 10-00368 - Teriyaki Express - RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 06/03/2020 1:06 pm Permit Details Permit Number: 10-00368 Teriyaki Express - Remodel 110 W 4th S Commercial - Remodel Permit Issued Date: 12/07/2010 Permit Inspection Statistics 11Total Inspections Completed: 9Total Inspections Passed: Inspection Pass Rate: 81.82% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 05/02/2011PassJohn BerryCommercial Sheetrock/Drywall Inspection Drywall ok to tape.Inspector Comments: 06/10/2011FailJohn BerryCommercial Building Final Building Final Copleted. HVAC rep's CFM test on hoods & m/up air. Inspector Comments: 06/23/2011PassQuinton OwensCommercial Building Final Hood fire suppression system okay. Building final okay except flow for hood & m/up air. Inspector Comments: Electrical 04/22/2011PassBret StoddardCommercial Electrical Rough-in Approved for cover - walls - framed.Inspector Comments: 06/10/2011PassBret StoddardElectrical Final Inspection COM-A,R,T Snoasis - permanent power needed - no cords. Clean up panel room - no romex (NP). Breaker locks XZ warmer and steam table. Under Stairs - Clean up wiring. Mount box in entry way. Inspector Comments: Door locked (10:35 am).Inspector Comments: 07/11/2011PassBret StoddardElectrical Final Inspection COM-A,R,T Approved for a final & CO.Inspector Comments: Fire 06/16/2011PassJohn BerryFire Sprinkler Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 10-00368 Teriyaki Express - Remodel 110 W 4th S Commercial - Remodel Permit Status of (Open) as of Report Date: 06/03/2020 1:06 pm Permit Inspection Summary Mechanical Furnace Install: Furnace installation looks good. Existing gas line not tested. Note: Gas line shut off to rest of the building & end capped. Inspector Comments: 12/06/2010PassJohn BerryHVAC Rough-in Handrail needed both sides 34-38" w/guard rail at 42". Reinstall emergency exit light in main area. Drywall under stairs. Block off upstairs until hand/guard rail fixed. *OK to open for customers in 60 days. Inspector Comments: 08/25/2011PassJohn BerryHVAC Final Inspection Air flow tested good. Return hand rails to wall. Inspector Comments: Plumbing 06/03/2011FailJohn BerryPlumbing Final Inspection 1. Needs backflow protector (DCVA). 2. Send copy of backflow certification to City of Rexburg. Inspector Comments: 06/10/2011PassJohn BerryPlumbing Final Inspection Re-inspection C/W. Owner will forward inspection report from testing agency. Inspector Comments: Page 2 of 2