April 4, 2019
Attendees:
Staff: Scott Johnson, Bret Stoddard,
Applicant: Todd Mitchell
Address: 404 N 2ad E
Val Christensen, Keith Davidson
LOT 1: RPR3MCA0203955
Scenario #1
Comprehensive Plan: Commercial
Zone: (CBC) Community Business Center
Time Frame: Possible building submittal 6 weeks.
'/z therapy and''/: family practice, but both share parts of the facility
Load of about 60 people at one time.
Lease for 8 years, then buy. Tax complications.
BUILDING
Ingress/Egress. Additional windows will be put in — Johnny Watson's firm; John Toombe is working
structurally to put the windows in. The walls are CMU. The roof is double -Ts. 2 doors will be added egress in
the rear.
HVAC. The front 2 HVAC units are heaters. Air exchangers were used to circulate the air from those two
heaters. The back 4 rooftop units will not be used. In the past, to compensate, 3 Resnor heaters were used.
There will be ducted returns.
Fire Sprinklers. The building is currently sprinkled and will be. Phoenix Fire — Clint — walked through the
building with him to replace the heads.
Fire Alarm. Fire Alarm will be updated in parallel. Both are typically delayed submittals.
PUBLIC WORKS
• The parking lot has 2 exits onto 2nd. Would you be willing to only have one exit onto tad E?
Water& Sewer. Water is 6" riser and sewer is 8".
Roads. Building sits right on west property line.
• Potential right of way needed on E 40' N.
• Impact Fees
Fire & Police = $0
Streets = Trips/Day
Water & Sewer = Comparison to similar facility (2 bathrooms currently to 6 bathrooms);
Potential upsize of meter (will need to pay for the meter)
PLANNING & ZONING
Lot Configuration. Shane Murphy is the agent. The owners are replatting the site to continue the north
south lot line in the middle of the property south to the road.
• An application and review process would be needed before recording.
Parking. The change in access would actually allow them to pick up some more parking. 18 employee
parking in the back. 81 spaces in the front.
Loading/Unloading. Current loading dock will be used for storage.
Sign. Owners will reuse the sign.