HomeMy WebLinkAbout17-00742 - MEETING MINUTES - 160 W 2nd S - Hemming Village Div.1 - Short PlatMay 21, 2019
Attendees:
Staff: Stephen Zollinger, Justin Beard
Applicant: Richie Webb
Address: Hemming Properties on W 2ad S
c IT Y OF
REXBURG
America's kn ily Colnnlanlfy
City of Rexburg Planning and 7oniog
35 Nodi, is East Rzxbug. ID 83440
Phone (208) 359-3020
LOT 1:
Scenario #1
Comprehensive Plan: Neighborhood Commercial/Mixed Use
Zone: Hemming Project Redevelopment Option
2 Outstanding issues:
1) Stairs for the Parking Structure
2) Incomplete land use action
Building is OK to give occupancy for the 2 residential structures. The problem lies with the stairway in the
parking structure.
-Option is to bond for future fixes
When Richie sold the Pines, the agreement was the Pines would park to the north and northwest. The plat was
started, but the Engineer had to be changed part way through. The plat was completed through Eagle Rock
Engineering. The Pines did not get the plat to their lender. Time passes. The lender does not respond. Richie
offered to talk to the lender directly. The lender did not respond. Richie went back to the owners to contact
the lender with no progress.
What would the effect of the plat not being completed? Richie and the property owners are operating as if the
plat was completed. Richie suggested the option could be cross easement agreements for parking. The city is
not sure this would help Richie's situation if he is not getting responses from the lender.
The code requirement for stairs does not work well in Rexburg due to the amount of snowfall. The city
recognizes an adaptation is necessary and has taken steps to allow only a 4" gap toeplate to allow snow to be
pushed through. 2 options are being tried: diamond extended metal will be tack welded to the tread to see
how it performs. The secondary option is to put a pan under the stairs and fill it with concrete. Chad and
Tom are allowed to experiment for 12 months to determine best solutions.
CONCLUSIONS:
• Letter from Richie that he will continue to pursue the plat proposal dated Dec. 13, 2018 Eagle Rock
Hemming Short Plat div. 1.
• Get Headwater and Luthy to put together price estimate and get a bond or money in an escrow
account to fix the stairs. Have the city set up to be notified of withdrawals. With these in place,
Certificates of Occupancy can be issued for Budding A & B and the parking structure.
TEM
Certificate of Occupancy
C I TY OF
T �,` B RCity of Rexburg
l�+ �j U 1�G Department of Community Development
o 35 N. 1st E.1 Rexburg, ID. 83440
Americas Family Community
Phone (208) 359.30201 Fax (208) 359-3022
Building Permit Number
Site Address
Description of Building or
Portion of Building covered by Certificate
Name and Address of Owner
Contractor
Applicable Edition of Code
Construction Type
Use and Occupancy (sq. ft.)
Design Occupant Load
Sprinkler System Required?
Sprinkler System Provided?
Special Conditions
16-00038
155 W 2nd 5
Hemming Cedars II - Bldg B - Mixed Use
Hemming Cedars II LLC
160 W 2nd 5, ID 83440
Headwaters Construction
IBC 2012
N/A
58,295 sq ft • Residential, multiple family
41,630 sq ft - Storage, low hazard
N/A
N/A
N/A
All final PW and Building tasks need to
be completed before Full CO
TEMPORARY
This Certificate, issued pursuant to the requirements of Section 111 of the International Building Code,
certifies that, at the time of issuance, this building or that portion of the building that was inspected on the
date listed was found to be in compliance with the requirements of the code for the group and division of
occupancy and the use for which the proposed occupancy was classified.
There shall be no further change in the existing occupancy classification of the building nor shall any
structural changes, modifications or additions be made to the building or any portion thereof until the
Building Official has reviewed and approved said future changes.
Date C.O. Issued — 402019
Building Official: Public Works: ��'---
-7
oQgexsuRc
Fa io CITY OF
u o
REXBURG
Americo FamilyCommuniry
Building Permit Number
Site Address
Description of Building or
Portion of Building covered by Certificate
Name and Address of Owner
Contractor
Applicable Edition of Code
Construction Type
Use and Occupancy (sq. ft.)
Design Occupant Load
Sprinkler System Required?
Special Conditions
vOccu
Certificate of
pancy
City of Rexburg
Department of Community Development
35 N. list E. I Rexburg, ID. 83440
Phone (208) 359-30201 Fax (208) 359-3022
16-00289
155 W 2nd S
Hemming Cedars 11 - Bldg A - Dormitory Housing
Headwaters Construction Co.
IBC 2012
HIS
R-2 Residential - Multiple family
140,200 sq ft - Residential, multiple family
75 Units - Dormitory Housing
Yes TEMPORARY
This is a Temporary Certificate of Occupancy only and will expire on June 1st, 2018 before which time all landscaping
shall be completed. This building has not yet passed inspections for occupancy.
Dumpster enclosure must be completed. Water valves must be raised to grade w/ landscaping. Sidewalk replaced by
grand sleeve by SE approach, State certification for south elevator required. Courtyard must be finished. Complete all
Planning & Zoning Items.
This Certificate, issued pursuant to the requirements of Section 111 of the International Building Code,
certifies that, at the time of issuance, this building or that portion of the building that was inspected on the
date listed was found to be in compliance with the requirements of the code for the group and division of
occupancy and the use for which the proposed occupancy was classified.
Date C.O. Issued January 0���5,,,///2��I018
C.O. Issued by Building Inspector y
There shall be no further change in the existing occupancy classification of the building nor shall any structural
changes, modifications or additions be made to the building or any portion thereof until the building Official has
reviewed and approved said future changes.
Mechanical Inspector .��•, Fire Department
Plumbing Inspector
Fire Alarm:
Electrical Inspector Fire Sprinkler:
Planning & Zoning �Zi.�%sr Qi.�cay Public Works: