Current --- Building Review Status: REVISIONS
Application Number: 20-00273Permit Details
Application Received Date: 04/28/2020
New Commercial Building
Application Approved Date:
Application Approved Status: ACCEPTED
04/29/2020
2300 University Blvd
2300 University Blvd - MHS Field House
Status of Plan Reviews Completed
05/01/2020--- Plumbing Review COMPLETED
05/01/2020--- HVAC Review COMPLETED
05/05/2020--- Electrical Review COMPLETED
05/28/2020--- Building Review REVISIONS
Permit Review Status
Plan Reviews Still in Progress
DESCRIPTION COMMENTS STA TUS
*Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed!
Handrails and Guards meet the requirements of
IBC Sections 1014 and 1015
REVISIONSNot shown
*Revisions Response :
Stairways meet the requirements of IBC Section
1011 & 1019
REVISIONSNot shown
*Revisions Response :
Checked for linked cases N/A
Ramps meet the requirements of IBC Section
1012
COMPLETED
Use classification is identified as per IBC Section
302
Classification is E COMPLETED
Type of construction is identified.III-B COMPLETED
Fire resistance rating of building elements meet
Sect. 704 & Table 601
COMPLETED
Exterior walls meet the requirements of IBC
Section 705
COMPLETED
Exterior wall openings meet the requirements of
IBC Section 705.8
COMPLETED
Reviewed By: Ted Dye
Review Date: 05/28/2020
Plan Review Details
ted.dye@rexburg.org
--- Building Review Status: REVISIONS
Page 1 of 3
Approval of plans does not constitute approval of variance from code
--- Building Review (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Fire walls meet the requirements of IBC Section
706
COMPLETED
Fire partitions meet the requirements of IBC
Section 708
COMPLETED
Insulation materials meet the requirements of
Section 720
COMPLETED
Automatic sprinklers are provided or exempted as
per IBC Section 903.2
COMPLETED
Means of egress meets requirements of IBC
Section 1003 and 1005
COMPLETED
Occupant load is identified on plans as per IBC
Section 1004
Occupant load 955 COMPLETED
Accessible Means of Egress complies with IBC
Section 1009
COMPLETED
Doors meet the requirements of IBC Section
1010
COMPLETED
Landings at doors meet the requirements of IBC
Sections 1010.1.5 and 1010.1.6
COMPLETED
Panic Hardware shall be installed as per IBC
Section 1010.1.10
COMPLETED
Exit Access meets the requirements of IBC
Section 1016
COMPLETED
Corridors meet the requirements of IBC Section
1020
COMPLETED
Exits meet the requirements of IBC Sections 1022
and 1006
COMPLETED
Exit Discharge meets the requirements of IBC
Section 1028
COMPLETED
All Accessible Routes meet the requirements of
IBC Section 1104
COMPLETED
Accessible Entrances are provided as per IBC
Section 1105
COMPLETED
Toilets, Bathing Fac., Sinks, Kit. and Drink. Fount.
meet IBC Sec. 1109
COMPLETED
Ventilation is provided as per IBC Section 1203 COMPLETED
Page 2 of 3
Approval of plans does not constitute approval of variance from code
--- Building Review (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Exterior Walls and Coverings comply with IBC
Chapter 14
COMPLETED
Building complies with IECC (IBC 1301)COMPLETED
Roof and Roof Fire Classification comply with IBC
Chapter 15
COMPLETED
Structural Docs identify snow, wind, seismic and
other loads per IBC Chp. 16
COMPLETED
Structural Docs or plans identify Risk Category as
per IBC Table 1604.5
COMPLETED
Site Grading meets the requirements of IBC
Section 1804.4
COMPLETED
Foundation and Footings meet the requirements
of IBC Chapter 1800
COMPLETED
Concrete Documentation provided as per IBC
Section 1901.5
COMPLETED
Concrete Reinforcement identified on plans and
designed by a licensed Engineer
COMPLETED
Anchorage to concrete is identified on plans as
per IBC Section 1901.3
COMPLETED
Masonry/reinforce. designed by licensed Eng.and
meets the reqs. of IBC Chp 21
COMPLETED
Struct. Steel designed by a licensed Eng. and
meets the reqs. of IBC Chp. 22
COMPLETED
Wood Fram. design. by lice. Eng. and meets.
reqs. IBC Chp. 23 or Conv. Li-Frame
COMPLETED
Amount of Plumbing Fixtures meets the
requirements of IBC Chapter 29
COMPLETED
Exit Lighting and Exit Signs comply with IBC 1008
& 1013
COMPLETED
Page 3 of 3
Approval of plans does not constitute approval of variance from code