HomeMy WebLinkAboutREVIEW MEETING - 07-00405 - Gymnastics Center - Site Plan
Design Review Committee Meeting - Gymnastics Center at
Airport Industrial Park - #07 00405 / #07 00406
11:00 am, March 4, 2008
Building Dept. Conference Room
Attendees: Ted Hill, Randall Porter, David Stein, Thaine Robinson, Ryan Watson of Silvertree Builders,
Gary Leikness, Elaine McFerrin
Areas of the Gymnastics Center building are stucco rather than the stone that was planned. Ryan
Watson is asking if the Design Review Committee will allow the stucco to remain. The owner wanted
stucco. There were also cost issues involved.
The committee agreed that some stone was needed on the building in order to uphold the design
standard.
It was decided that the builder would add stone to the entryway and on the columns for wainscoting.
Stucco along the front of the building can stay. Signage along with paint or texture/material change
could be used to break up the wall line of the building – the builder will bring back ideas concerning this
issue.