Loading...
HomeMy WebLinkAboutREVIEW MEETING - 07-00405 - Gymnastics Center - Site Plan Design Review Committee Meeting - Gymnastics Center at Airport Industrial Park - #07 00405 / #07 00406 11:00 am, March 4, 2008 Building Dept. Conference Room Attendees: Ted Hill, Randall Porter, David Stein, Thaine Robinson, Ryan Watson of Silvertree Builders, Gary Leikness, Elaine McFerrin Areas of the Gymnastics Center building are stucco rather than the stone that was planned. Ryan Watson is asking if the Design Review Committee will allow the stucco to remain. The owner wanted stucco. There were also cost issues involved. The committee agreed that some stone was needed on the building in order to uphold the design standard. It was decided that the builder would add stone to the entryway and on the columns for wainscoting. Stucco along the front of the building can stay. Signage along with paint or texture/material change could be used to break up the wall line of the building – the builder will bring back ideas concerning this issue.