Loading...
HomeMy WebLinkAboutDESIGN REVIEW MEETING - 07-00258 - Express Car Wash - New Building Design Review Committee Meeting – Express Wash #07 00258 11:00 am April 25, 2008 Building Dept. Conference Room Attendees: DRC Committee members- Dan Hanna, Thaine Robinson, Randall Porter Applicant- Garrett Sandow representing Express Car Wash Staff- Gary Leikness, Elaine McFerrin The issues that were addressed were the exterior building color, the rock wainscot, and the stucco columns. The builder was asking if he could run the 4 feet of rock wainscot all along the bottom of the walls with the stucco columns going down to the wainscot rather than to the ground. The committee members agreed, as this design meets the overall intent of the design standards, which is to break up the long wall. The choice of color was to be determined for the exterior of the building, on the gabled ends. The builder brought a chip of the rust color (included in file # 07 00258) so the committee could determine if it was a true rust and not the prohibited (design standards) color red. The committee decided on this rust color.