HomeMy WebLinkAboutDESIGN REVIEW MEETING - 07-00258 - Express Car Wash - New Building
Design Review Committee Meeting – Express Wash #07 00258
11:00 am April 25, 2008
Building Dept. Conference Room
Attendees:
DRC Committee members- Dan Hanna, Thaine Robinson, Randall Porter
Applicant- Garrett Sandow representing Express Car Wash
Staff- Gary Leikness, Elaine McFerrin
The issues that were addressed were the exterior building color, the rock wainscot, and the stucco
columns.
The builder was asking if he could run the 4 feet of rock wainscot all along the bottom of the walls with
the stucco columns going down to the wainscot rather than to the ground. The committee members
agreed, as this design meets the overall intent of the design standards, which is to break up the long
wall.
The choice of color was to be determined for the exterior of the building, on the gabled ends. The
builder brought a chip of the rust color (included in file # 07 00258) so the committee could determine if
it was a true rust and not the prohibited (design standards) color red. The committee decided on this
rust color.