Loading...
HomeMy WebLinkAboutDESIGN REVIEW MINUTES 11.17.09 - 09-00309 - Nauvoo House - CUP add 45 units in 5 new bldgs (250 more students) Design Review Committee Meeting Nauvoo House (Pre Building) (Conditional Use Permit # 09 00306) November 17, 2009 Attendees Design Review Committee members: Ted Hill, Dan Hanna, Thaine Robinson Applicants: Developer Chris Carr, architect Newell Goldsberry Staff: Val Christensen, Elaine McFerrin Chris Carr brought visual color drawings of the planned project. Val Christensen stated that this project is coming before the Design Review Committee to look at the building form and to decide if the planned stairwell connection is sufficient to break up the long length of the buildings. Chris Carr stated that they want a balance between the old and new. They know they need to meet rules, but they want to maintain the flavor of the original development. In the presented drawings, the roof line is broken up, and there is an elevation break-up for each building. The stairwell and enclosing its back wall was discussed. The Design Review Committee concluded that the stairwell was sufficient to break up the long expanse of building, and that the back wall would be enclosed to better protect from the elements.