HomeMy WebLinkAbout08.08.16 DESIGN REVIEW MINUTES - Campus Courtyard1
Design Review Committee Meeting
Campus Courtyard – 273 South 5th West
August 8, 2016 – 12:00 pm
Attendees
Design Review Committee: Jedd Walker, Brad Wolfe, Johnny Watson
Applicant: Jared Sommer
City staff: Elaine McFerrin
The Design Review Committee is composed of a P&Z Commissioner (Jedd Walker), a City Council member (Brad
Wolfe) or the Mayor, and a professional from the community (Johnny Watson). Several other individuals serve on the
committee as necessary. The Committee may meet if there is a development issue that is non-conforming or differs
from the Design Standards requirements that are stated in the City of Rexburg Development Code Ordinance No. 1115.
The purpose of the Design Review Committee meeting is often to reach an amicable compromise for the applicant and
the community.
The reason for today’s meeting is to address the stated P&Z Commission and City Council conditions to make sure the
project will meet City requirements.
From the June 18, 2015 P&Z meeting (4 conditions) and the August 5, 2015 City Council meeting
(added a 5th condition), the conditions on the rezone of the property for this development were as
follows:
Conditions:
1. The existing green (Barrick) building on South 5th West on the subject property shall be beautified and resurfaced as stated
tonight by the applicant.
2. Buildings shall be a maximum of 30 feet in height.
3. An architectural design review meeting shall be held to address having a significant landscape buffer, especially along South 5th
West.
4. A P&Z Commissioner who was present at this meeting tonight shall be a participant in this design review meeting to address
this buffer.
5. Provide uniform landscaping over the entire project (old and new); landscaping to be continued into the existing apartment
complex.
It was clarified that Condition #2 regarding building height is met.
Condition #4 is met by the presence of P&Z Commission Chairman Jedd Walker at this meeting.
Conditions # 3 and #5regarding a significant landscape buffer uniform landscaping will be addressed, followed by
addressing Condition #1 – plans for the existing green (Barrick)building’s beautification.
A YouTube video of proposed landscaping for the project was viewed. The back area will have gravel. There would be
varied nice landscaping to help conceal the parking lot from the neighboring properties and the street.
Jared Sommer said they would rather do the proposed landscaping than have a berm.
Johnny Watson clarified that screening the parking is what they are trying to achieve. A variety of plants is visually more
pleasing than a grass berm.
Brad Wolfe said there was a lot of discussion about a berm at the rezone meetings. That is why the words “significant
landscape buffer ” were used in the 3rd stated condition.
2
A berm could be a solution but there are other ways to address the issue.
Jedd Walker said everywhere that a berm would have room to be, would not hide the parking.
A copy of the proposed landscape plan was viewed. There was discussion regarding adding a variety of trees and bushes
and taller evergreens.
There would be varied landscaping in front of the existing green building. Jared Sommer stated they want to
maintain the historical nature of the building but also want it to tie in with the new project. It would be used
for storage. The building will be sandblasted of its paint, and brown acid stain would then be used on the
cinderblock.
He brought brown shingles to show the Committee the planned color for a new roof for this building; the
dome may be of metal.
The Design Review Committee concluded, and Jared Sommer was in agreement, that for Campus Courtyard:
1. There shall be more established plants (5 gallon).
2. Trees shall be 2-inch caliper (already indicated on landscape plan).
3. Increase evergreens around the 2 entrances.
4. Add trees to the boulevard strip in front of the development on South 5th West, to be approved by
City staff regarding type of trees and the distance to be between them.
5. The existing green building (Barrick) shall be improved as suggested by the applicant - with a new
roof, acid brown stain, and improvement and restoration to windows with new trim/seals and
darkened/frosted glass windows for the front of the building (see attached Sommer proposed
restoration of the cinderblock building document).
The Design Review Committee concluded that per this meeting, applicant Jared Sommer may move forward
and obtain a building permit.
The Committee thanked Jared Sommer for his willingness to work with them for the betterment of the
community and the city.