Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00031 - Headwaters Office - Tenant FinishPermit Inspection Summary Permit Status of (Open) as of Report Date: 05/11/2020 1:28 pm Permit Details Permit Number: 11-00031 Headwaters Office - Tenant Finish 160 W 2nd S #201 Commercial Tenant Finish Permit Issued Date: 09/03/2014 Permit Inspection Statistics 12Total Inspections Completed: 11Total Inspections Passed: Inspection Pass Rate: 91.67% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 02/23/2011PassPLL ADMINCommercial Framing/Structure Inspection As per Jon Berry Framing, Drywall, and HVAC rough all look good. Inspector Comments: 02/23/2011PassPLL ADMINCommercial Sheetrock/Drywall Inspection As per Jon Berry Framing, Drywall, and HVAC rough all look good. Inspector Comments: 04/06/2011PassPLL ADMINCommercial Building Final As per Jon Berry exit sign in west hall to be changed to one with bug eye emergency light. Inspector Comments: Electrical 02/22/2011PassBret StoddardCommercial Electrical Rough-in 2/17/11 - Approved for cover. 2/22/11 - As per Jane Shaw-fill-in electrical inspector-Approved for cover in the retail spaces-west side upstairs. Inspector Comments: 03/28/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Need to install GFCI protection for the receptacle under the sinks in the bathroom and the kitchen, need to install a K.O. seal in the box and hang the light in the north east office, call for a re-inspect when ready. Inspector Comments: 04/06/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and a C.O.Inspector Comments: Fire 03/30/2011PassPLL ADMINFire Department Final Inspection Approved by Brad JohnsonInspector Comments: Mechanical 04/06/2011PassPLL ADMINHVAC Final Inspection As per Jon Berry HVAC Final Completed. Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 11-00031 Headwaters Office - Tenant Finish 160 W 2nd S #201 Commercial Tenant Finish Permit Status of (Open) as of Report Date: 05/11/2020 1:28 pm Permit Inspection Summary Plumbing 02/16/2011PassDon AllenPlumbing Water As per Brad JohnsonInspector Comments: 02/16/2011PassPLL ADMINPlumbing Rough-in As per Brad Johnson Plumbing approved for cover. Inspector Comments: 02/16/2011PassPLL ADMINPlumbing Sewer As per Brad JohnsonInspector Comments: 03/29/2011PassSAUREY AMANDAPlumbing Final Inspection 03/28/11: Final plumbing looks good, per Jeff Hackworth.Inspector Comments: Page 2 of 2