Permit Status of (Open) as of Report Date: 05/11/2020 12:28 pm
Permit Details Permit Number: 11-00050
BYUI Testing Center - Remodel
525 S Center St
Commercial - Remodel
Permit Issued Date: 08/28/2014
Permit Inspection Statistics
17Total Inspections Completed:
15Total Inspections Passed:
Inspection Pass Rate: 88.24%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
07/28/2011PassQuinton OwensCommercial Building Final
08/01/2011PassQuinton OwensCommercial Framing/Structure Inspection
08/01/2011PassQuinton OwensCommercial Insulation Inspection
08/01/2011PassQuinton OwensResidential Sheetrock/Drywall Inspection
Electrical
06/27/2011PassBret StoddardCommercial Electrical Rough-in
4/27/11 - Approved for cover-center line to the east-framed walls. Bathroom hard
lids not complete.
5/5/11 - Approved for cover in the bathrooms and half walls in the west side
area.
6/1/11 - Approved for cover-middle wall between main testing and bathrooms.
Also walked through the fire alarm locations and sprinkler piping tie in at the fire
riser.
6/27/11 - Approved for cover-cabinets-millwork 01 and 02.
Inspector Comments:
07/14/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Need to install K.O. seals in two locations, panels are not labeled, camera patch
cords are not plenum rated wires, call for a re-inspect when ready.
Inspector Comments:
07/26/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.-electrical-cameras have CM wire tied into them and
not plenum rated-System Tech pulled the wire-needs to be replaced. Will need to
re-inspect before the final is completed.
Inspector Comments:
07/28/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 11-00050
BYUI Testing Center - Remodel
525 S Center St
Commercial - Remodel
Permit Status of (Open) as of Report Date: 05/11/2020 12:28 pm
Permit
Inspection
Summary
Fire
07/05/2011PassDale PickeringFire Sprinkler Hydro
202 PSI 12:02pm-isolated to specific location(zone), 2:16pm 200 PSI, main drain
flush 115 PSI static and 105 residual, #2 riser flush(1 head simulation) 110 PSI
static and 90 PSI residual, witnessed the testing of the above items.
Inspector Comments:
07/26/2011PassBret StoddardFire Alarm Final Inspection
Approved for a final-fire alarm-walked through to verify all signalling devices are
operational.
Inspector Comments:
07/26/2011PassBret StoddardFire Department Final Inspection
Approved for a final and C.O.-no fire extinguishers are required in the testing
center area-article 906.1 exception.
Inspector Comments:
Mechanical
08/01/2011PassQuinton OwensHVAC Final Inspection
Plumbing
03/17/2011PassSAUREY AMANDAPlumbing Underground Inspection
Ground work on bathroom looks good, per Jeff Hackworth.Inspector Comments:
04/13/2011PassSAUREY AMANDAPlumbing Rough-in
Rough plumbing tested and approved, per Jeff Hackworth.Inspector Comments:
07/13/2011PassSAUREY AMANDAPlumbing Final Inspection
No Discrepancies on lower level, northwest corner. Approved per Larry WattsInspector Comments:
08/05/2011PassQuinton OwensPlumbing Sewer
"tenant finish" no new sewer service connectionInspector Comments:
08/05/2011PassDon AllenPlumbing Water
"tenant finish" no new water service connectionInspector Comments: