HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00071 - Physical Therapy RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 05/08/2020 11:16 am
Permit Details Permit Number: 11-00071
Physical Therapy Remodel
217 N 2nd E
Commercial - Remodel
Permit Issued Date: 09/03/2014
Permit Inspection Statistics
13Total Inspections Completed:
9Total Inspections Passed:
Inspection Pass Rate: 69.23%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
03/28/2011PassPLL ADMINCommercial Framing/Structure Inspection
As per Jon Berry
Interior framing looks good. OK to cover.
Inspector Comments:
04/04/2011PassQuinton OwensCommercial Sheetrock/Drywall Inspection
Missed fasteners in a few locations, instructed to fix.Inspector Comments:
05/26/2011FailPLL ADMINCommercial Building Final
As per Jon Berry
Side grab bar d/n end at 54"
3' rear grab bar required
Cabinet c/n be between sink and toilet
Emergency exit light required in reception area.
Inspector Comments:
07/13/2011PassPLL ADMINCommercial Building Final
As per Jon Berry
7/13/11 - Building Final Completed.
7/20/11 - Building, Fire, Mech Finals Completed.
Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 11-00071
Physical Therapy Remodel
217 N 2nd E
Commercial - Remodel
Permit Status of (Open) as of Report Date: 05/08/2020 11:16 am
Permit
Inspection
Summary
Electrical
03/25/2011PassBret StoddardCommercial Electrical Rough-in
Approved for cover-main service and panels are existing, north rooms are wired
with green MC cable.
Inspector Comments:
05/16/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Blank cover needed for the furnace in the laundry room, need to install a
receptacle for the data panel-cord connected, washer and fridge need GFCI
protection-6' from the edge of the sink, GFCI protection for soffit
receptacles?-verify-they are as per Scott, flourescent lights in the exam room are
on dimmers-dimmable ballasts?-verify-as per Scott-yes, back portion not
completed, call for a re-inspect when ready.
Inspector Comments:
07/13/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Need to install a breaker lock for the heater circuit in the west side, closet light
not installed in the west side, call for a re-inspect when ready.
Inspector Comments:
07/20/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and a C.O. entire building-need to keep panel clearances in
the mech. room in front of the panels.
Inspector Comments:
Fire
07/13/2011FailBret StoddardFire Department Final Inspection
Need to install a fire extinguisher by the main entrance, call for a re-inspect when
ready-inspected this at the same time as the electrical-no separate ticket was
written.
Inspector Comments:
07/20/2011PassPLL ADMINFire Department Final Inspection
As per Jon Berry
Extinguishers installed in both units.
Inspector Comments:
Mechanical
07/13/2011PassPLL ADMINHVAC Final Inspection
As per Jon Berry
HVAC Final Completed.
Inspector Comments:
Plumbing
03/23/2011PassPLL ADMINPlumbing Rough-in
Approved by Brad JohnsonInspector Comments:
07/13/2011PassSAUREY AMANDAPlumbing Final Inspection
No Discrepancies Noted, approved per Larry Watts.Inspector Comments:
Page 2 of 2