Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00093 - Premier Performance RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 05/08/2020 10:40 am Permit Details Permit Number: 11-00093 Premier Performance Remodel 278 Dividend Dr Commercial - Remodel Permit Issued Date: 09/04/2014 Permit Inspection Statistics 13Total Inspections Completed: 9Total Inspections Passed: Inspection Pass Rate: 69.23% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 05/06/2011PassPLL ADMINCommercial Framing/Structure Inspection As per Jon Berry Framing upstairs not connected to old building. Framing completed Inspector Comments: 05/06/2011PassPLL ADMINCommercial Sheetrock/Drywall Inspection As per Jon Berry 4/22/11 - Data Room ok to tape 5/5/11 - OK to tape hallway and reception area. Ceiling OK to cover. Inspector Comments: 06/02/2011PassPLL ADMINCommercial Insulation Inspection As per Jon Berry Not req'd interior constr only Inspector Comments: 08/10/2011FailPLL ADMINCommercial Building Final As per Jon Berry 6/3/11 Recption area only Accessible parking signs req'd upstairs needs emerg lighting and exit signs Make unisex restroom out of womens in breakroom Inspector Comments: 09/12/2011PassPLL ADMINCommercial Building Final As per Jon Berry Vertical grab bar req'd in unisex restroom. CW 9/16/11 - Building Final Completed. Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 11-00093 Premier Performance Remodel 278 Dividend Dr Commercial - Remodel Permit Status of (Open) as of Report Date: 05/08/2020 10:40 am Permit Inspection Summary Electrical 04/25/2011PassBret StoddardCommercial Electrical Rough-in 4/22/11 - Approved for cover in phase 1. 4/25/11 - Approved for cover-phase 2-three offices. Inspector Comments: 08/03/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Need to cover the NM-B with a 15 minute finish rating around the panels in panel room, GFCI protection required for the outlet in the breakroom bathroom, call for a re-inspect when ready. Inspector Comments: 09/19/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection 6/6/11 - Need to install a covering over the NM cable in the HVAC closet by the front desk, need cover plates in several locations, call for a re-inspect when ready. 9/19/11 - Approved for a final and a C.O.-remodel. Inspector Comments: Fire 08/03/2011FailBret StoddardFire Department Final Inspection Fire inspection done at the same time as the electrical-no separate ticket was written for this inspection-see electrical final inspection ticket-need to supply and mount fire extinguishers every 75 feet throughout the remodeled space along with the minimum number per 3000 square foot requirement, call for a re-inspect when ready. Inspector Comments: 09/12/2011PassPLL ADMINFire Department Final Inspection As per Jon Berry Fire extinguishers installed. Inspector Comments: Mechanical 06/02/2011PassPLL ADMINHVAC Final Inspection As per Jon Berry 6/3/11 - Mech final for reception area only looks good *approved Inspector Comments: Plumbing 08/08/2011FailDon AllenPlumbing Final Inspection they needed to put heat shields around the drain in down stairs bathroom (womens) CW jb Inspector Comments: 09/15/2011PassDon AllenPlumbing Final Inspection Page 2 of 2