HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00093 - Premier Performance RemodelPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 05/08/2020 10:40 am
Permit Details Permit Number: 11-00093
Premier Performance Remodel
278 Dividend Dr
Commercial - Remodel
Permit Issued Date: 09/04/2014
Permit Inspection Statistics
13Total Inspections Completed:
9Total Inspections Passed:
Inspection Pass Rate: 69.23%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
05/06/2011PassPLL ADMINCommercial Framing/Structure Inspection
As per Jon Berry
Framing upstairs not connected to old building.
Framing completed
Inspector Comments:
05/06/2011PassPLL ADMINCommercial Sheetrock/Drywall Inspection
As per Jon Berry
4/22/11 - Data Room ok to tape
5/5/11 - OK to tape hallway and reception area. Ceiling OK to cover.
Inspector Comments:
06/02/2011PassPLL ADMINCommercial Insulation Inspection
As per Jon Berry
Not req'd interior constr only
Inspector Comments:
08/10/2011FailPLL ADMINCommercial Building Final
As per Jon Berry
6/3/11 Recption area only
Accessible parking signs req'd
upstairs needs emerg lighting and exit signs
Make unisex restroom out of womens in breakroom
Inspector Comments:
09/12/2011PassPLL ADMINCommercial Building Final
As per Jon Berry
Vertical grab bar req'd in unisex restroom. CW
9/16/11 - Building Final Completed.
Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 11-00093
Premier Performance Remodel
278 Dividend Dr
Commercial - Remodel
Permit Status of (Open) as of Report Date: 05/08/2020 10:40 am
Permit
Inspection
Summary
Electrical
04/25/2011PassBret StoddardCommercial Electrical Rough-in
4/22/11 - Approved for cover in phase 1.
4/25/11 - Approved for cover-phase 2-three offices.
Inspector Comments:
08/03/2011FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Need to cover the NM-B with a 15 minute finish rating around the panels in panel
room, GFCI protection required for the outlet in the breakroom bathroom, call for
a re-inspect when ready.
Inspector Comments:
09/19/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
6/6/11 - Need to install a covering over the NM cable in the HVAC closet by the
front desk, need cover plates in several locations, call for a re-inspect when
ready.
9/19/11 - Approved for a final and a C.O.-remodel.
Inspector Comments:
Fire
08/03/2011FailBret StoddardFire Department Final Inspection
Fire inspection done at the same time as the electrical-no separate ticket was
written for this inspection-see electrical final inspection ticket-need to supply and
mount fire extinguishers every 75 feet throughout the remodeled space along
with the minimum number per 3000 square foot requirement, call for a re-inspect
when ready.
Inspector Comments:
09/12/2011PassPLL ADMINFire Department Final Inspection
As per Jon Berry
Fire extinguishers installed.
Inspector Comments:
Mechanical
06/02/2011PassPLL ADMINHVAC Final Inspection
As per Jon Berry
6/3/11 - Mech final for reception area only looks good
*approved
Inspector Comments:
Plumbing
08/08/2011FailDon AllenPlumbing Final Inspection
they needed to put heat shields around the drain in down stairs bathroom
(womens) CW jb
Inspector Comments:
09/15/2011PassDon AllenPlumbing Final Inspection
Page 2 of 2