Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00217 - Bealls Commercial RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 04/16/2020 9:22 am Permit Details Permit Number: 11-00217 Bealls Commercial Remodel 125 Valley River Dr Commercial - Remodel Permit Issued Date: 09/24/2014 Permit Inspection Statistics 11Total Inspections Completed: 10Total Inspections Passed: Inspection Pass Rate: 90.91% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 06/30/2011PassPLL ADMINCommercial Framing/Structure Inspection As per Jon BerryInspector Comments: 06/30/2011PassPLL ADMINCommercial Sheetrock/Drywall Inspection As per Jon BerryInspector Comments: 08/11/2011FailPLL ADMINCommercial Building Final As per Jon Berry Fire ext required front and back Vert grab bars req'd restrooms Fire alarm test required Inspector Comments: 09/12/2011PassPLL ADMINCommercial Building Final As per Jon Berry Brett did partial Inspector Comments: Electrical 06/23/2011PassBret StoddardCommercial Electrical Rough-in Approved for cover in the framed walls only.Inspector Comments: 08/11/2011PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.-they labeled the panel and re-wired the RTU's back in after the roofer took them off-from prior inspection(8/10/11). Inspector Comments: Fire 08/16/2011PassBret StoddardFire Alarm Final Inspection Approved for a final-after verification of the air handlers being 1800 CFM as per Johnny Watson-shut off power to FACP at 2:05pm 8/15, turned power back on at 2:20pm 8/16, ran the notification devices for 5 minutes and 20 seconds in the Beall's side of the building on new power supply. Received CFM air handler specs 8/17/11. Inspector Comments: 08/16/2011PassBret StoddardFire Department Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 11-00217 Bealls Commercial Remodel 125 Valley River Dr Commercial - Remodel Permit Status of (Open) as of Report Date: 04/16/2020 9:22 am Permit Inspection Summary Mechanical 08/11/2011PassPLL ADMINHVAC Rough-in As per Jon BerryInspector Comments: 08/22/2011PassPLL ADMINHVAC Final Inspection As per Jon Berry HVAC final completed. Inspector Comments: Plumbing 08/12/2011PassDon AllenPlumbing Final Inspection its all approved for the c oInspector Comments: Page 2 of 2