Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00273 - 210 S 2nd W - LDS Church 13th WardPermit Inspection Summary Permit Status of (Open) as of Report Date: 04/13/2020 3:16 pm Permit Details Permit Number: 11-00273 210 S 2nd W - LDS Church 13th Ward 210 S 2nd W New Commercial Building Permit Issued Date: 10/06/2014 Permit Inspection Statistics 30Total Inspections Completed: 25Total Inspections Passed: Inspection Pass Rate: 83.33% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 10/11/2011PassPLL ADMINFoundation Inspection As per Jon Berry N, S, and W foundation walls and rebar look good. Completed. Inspector Comments: 11/07/2011PassPLL ADMINCommercial Footing Inspection As per Jon Berry 9/30/11 - FC 3.0 footings need #5 @ 14" OC crosswise (FAILED) 10/20/11 - Int. Footings and Foundation look good. 11/1/11 - Interior footings OK to pour north side and front. Tie rebar above ground. 11/2/11 - South int. footings OK 11/3/11 - NE footings OK 11/4/11 - Center west interior footings look good. 11/7/11 - SE interior footings OK to pour. Inspector Comments: 12/28/2011PassPLL ADMINSheeting As per Jon Berry Ext. sheathing nailed OK to cover. Inspector Comments: 02/09/2012PassTed DyeCommercial Insulation Inspection 2/1/12 - Rm 202 NE corner needs insulation on lower corner OK Room on SW corner needs insulation at Beam OK upper level last room on NE corner; hole on upside of rafers in wall OK **NOTE** All gable ends** and walls are not yet insulated.** 4/27/12 - Exterior walls approved (EXCEPT Entryways & Chapel popout - incomplete)2-7, QO Entryway walls and chapel pop-out done. (2-9, QO) Ceilings not done yet. Per QuintonO Inspector Comments: 08/07/2012PassPLL ADMINSidewalk Inspection As per Jon BerryInspector Comments: Page 1 of 5 (Continued) Permit Details Permit Number: 11-00273 210 S 2nd W - LDS Church 13th Ward 210 S 2nd W New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 3:16 pm Permit Inspection Summary 08/08/2012PassPLL ADMINCommercial Building Final As per Jon Berry ADA toilet paper not per code installed by church. Inspector Comments: 10/06/2012PassPLL ADMINCommercial Framing/Structure Inspection As per Jon Berry Framing looks good OK to insulate Inspector Comments: 10/06/2014PassPLL ADMINCommercial Sheetrock/Drywall Inspection As per Jon Berry 2/9/12 - Sheetrock at exterior walls in rooms approved per QuintonO 1/9/12 - Nailing looks good south and west sides. 2/6/12 - Exterior sides OK for insulation (entryways and chapel incomplete) ceiling drywall OK to tape. Inspector Comments: Page 2 of 5 (Continued) Permit Details Permit Number: 11-00273 210 S 2nd W - LDS Church 13th Ward 210 S 2nd W New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 3:16 pm Permit Inspection Summary Electrical 10/26/2011FailBret StoddardElectrical Underground Inspection Did not inspect the underground conduits-already backfilled before inspection.Inspector Comments: 11/15/2011PassBret StoddardElectrical Underground Inspection Approved for cover-underground conduits-home runs.Inspector Comments: 06/01/2012PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power-as per electrical contractor, engineer only requires what the City requires-they did not install an equipment grounding conductor from the C.T. enclosure to the main panel. Inspector Comments: 06/22/2012PassBret StoddardCommercial Electrical Rough-in 1/27/12 - Approved for cover in TJI ceilings and perimeter classroom walls. 2/15/12 - Approved for cover in interior walls, cultural hall, and chapel areas. 3/23/12 - Approved for cover in restroom floor 6/22/12 - Approved for cover. walls only. wires stubbed up into ceiling area not terminated into boxes. Inspector Comments: 08/02/2012FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Label panels throughout, all A/C units have wrong size breakers installed throughout, fire alarm system not done, romex needs to be covered in the north and south mezzanine (vestibule walls), blank covers needed in two location in the mezzanine area, call for a re-inspect when ready. Inspector Comments: 08/07/2012FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Need to cover the NM-B cable in the mezzanine area on the north and south side-vestibule, ground clamps not installed in the baptismal font area, call for a re-inspect when ready. Inspector Comments: 08/09/2012PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.Inspector Comments: Page 3 of 5 (Continued) Permit Details Permit Number: 11-00273 210 S 2nd W - LDS Church 13th Ward 210 S 2nd W New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 3:16 pm Permit Inspection Summary Fire 11/29/2011PassBret StoddardFire Underground Inspection 11/28/11 - Approved for cover-10:10AM 209#, 12:15PM 209#-2 hour test completed underground to street tie in. 11/29/11 - Flush Approved-4" for 10 minutes, 6" main line. Inspector Comments: 02/23/2012PassPLL ADMINFire Sprinkler Rough-in As per Jon Berry Sprinkler visual and head inspection looked good. Sprinkler piping main lines OK to cover over gym and chapel Inspector Comments: 04/27/2012PassPLL ADMINFire Alarm Rough-in As per Jon Berry Visual inspection of piping and heads looked good. Hydro to be scheduled. Inspector Comments: 07/31/2012PassPLL ADMINFire Sprinkler Final Inspection As per Jon Berry Sprinkler hydro tested good after leak repaired Hydro tested good at 200# Inspector Comments: 08/03/2012PassPLL ADMINFire Alarm Final Inspection As per Jon Berry Fire alarm system without sprinkler system checked good. Sprinklers to be tested 8/7 Inspector Comments: 08/08/2012PassPLL ADMINFire Department Final Inspection As per Jon Berry Finals completed. System on line *approved Inspector Comments: Mechanical 04/27/2012PassPLL ADMINHVAC Rough-in As per Jon BerryInspector Comments: 07/23/2012FailQuinton OwensHVAC Final Inspection -Fan not running in mens room -Cap opening on sides of furnace (horizontal) -Condensate pump 9west end) not working (power to outlet?) Inspector Comments: 08/07/2012PassQuinton OwensHVAC Final Inspection Page 4 of 5 (Continued) Permit Details Permit Number: 11-00273 210 S 2nd W - LDS Church 13th Ward 210 S 2nd W New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 3:16 pm Permit Inspection Summary Plumbing 08/28/2011PassDon AllenPlumbing Underground Inspection 10/28/2011 ground work is all good to coverInspector Comments: 03/01/2012PassSAUREY AMANDAPlumbing Rough-in 03/02/12: Men and Women's gang bathrooms look good, per Nathan Wood. 3/20/12 - The two bathrooms are all good -per Don Allen Inspector Comments: 07/26/2012FailDon AllenPlumbing Final Inspection Need to caulk everything. Air gap on softenerInspector Comments: 08/24/2012PassDon AllenPlumbing Sewer 08/24/2012PassDon AllenPlumbing Water 08/24/2012PassDon AllenPlumbing Final Inspection Page 5 of 5