Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm
Permit Details Permit Number: 11-00390
37 S 2nd E - New Building - Beaumont
37 S 2nd E
New Commercial Building
Permit Issued Date: 03/20/2014
Permit Inspection Statistics
38Total Inspections Completed:
29Total Inspections Passed:
Inspection Pass Rate: 76.32%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
11/28/11 JB: East footings and rebar look good.Inspector Comments:
12/06/2011PassPLL ADMINFooting Inspection
12/6/11 JB: West footing ok to pour.
Approved as per Jon Berry.
Inspector Comments:
12/20/11 JB: Foundation and footings look good
East and south sides
Int. Footings east.
Inspector Comments:
01/09/2012PassPLL ADMINFoundation Inspection
1/9/12 JB: Foundation and rebar look good.
Approved per Jon Berry.
Inspector Comments:
06/26/2012FailQuinton OwensSheeting
-Several missed locations (marked in red)
-Some blocking missed on 2nd floor near stairs on east wall.
Inspector Comments:
06/29/2012PassQuinton OwensSheeting
Sheathing approved.Inspector Comments:
01/22/2013FailTed DyeFraming/Structure Inspection
3rd floor - header of wall under duct across form elevator.
Ok? on separation of rooms and corridors. OK.
Inspector Comments:
01/23/2013PassTed DyeFraming/Structure Inspection
3rd floor complete.Inspector Comments:
01/23/2013PassTed DyeInsulation Inspection
3rd floor wall are complete.Inspector Comments:
Page 1 of 6
(Continued)
Permit Details Permit Number: 11-00390
37 S 2nd E - New Building - Beaumont
37 S 2nd E
New Commercial Building
Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm
Permit
Inspection
Summary
1/31/13 QO: Framing and Insulation (lvl 2) -
Finish insulation in exterior duct shafts (for re-inspection)
-Shafts not rated? Penetrations?
-Blocking removed from behind W.C. (grab bar)
-Stud & blocking removed by roof drain shaft.
(2ea) Vertical grab bar backing missing (west)
-Some walls missing fire blocking
-Top plate needed above door NW area.
-Notches in top chords of joists (East side lobby)
-Stud cut on exterior wall at mech. duct penetrations.
Inspector Comments:
01/31/2013FailQuinton OwensFraming/Structure Inspection
2/13/13 QO: Lvl 2 - Insulation and Framing reinspect:
Mostly drywalled
Visible items (not covered) are not done.
**DID NOT INSPECT**
Inspector Comments:
02/25/2013FailQuinton OwensFraming/Structure Inspection
Framing (lvl 1)
-Several corners missing backing for nailing drywall.
-Some bottom plates not nailed down.
-Some anchor bolts missing washers/nuts (stairs)
Some restrooms need backing for vertical grab bar.
Action required: see above. Also fix cut ext. stud with header at mech. duct (2nd
floor).
Inspector Comments:
03/01/2013PassQuinton OwensFraming/Structure Inspection
Framing (1st floor) reinspect and insulation - ok to drywall.Inspector Comments:
03/13/2013PassQuinton OwensFraming/Structure Inspection
Framing (lvl 1) & Insulation - framing items fixed.
-Missing insulation installed.
-Windows and doors finished sealing around perimeters.
Ok to drywall.
Action required: elect. and plumb. rough must be ok for cover.
Inspector Comments:
2/19/13 QO: Sheetrock, screw - lvl 2 - partially finished.
Add screws at missed locations (marked with pencil)
Approved partial.
Inspector Comments:
2/19/13 QO: Sheetrock, screw - lvl 3 - 3rd floor drywall.
- A few studs and spots missing screws. Indicated to drywallers the locations. (fix
before taping).
Action required: reinspect unfinished rooms.
Inspector Comments:
Page 2 of 6
(Continued)
Permit Details Permit Number: 11-00390
37 S 2nd E - New Building - Beaumont
37 S 2nd E
New Commercial Building
Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm
Permit
Inspection
Summary
03/28/2013PassQuinton OwensSheetrock/Drywall Inspection
3/28/13 QO: Sheetrock screw - lvl 1 - OK to tape.
(5/8" type x at required locations).
Inspector Comments:
07/08/2013FailQuinton OwensBuilding Final
-Address #'s (min 4" high and contrasting color)
-Washer/dryer added under stairs insufficient headroom, dryer vent annular
space not fire caulked, washer box: not rated. Penetration.
-Holes in rated wall under stairs (same areas as above)
-Fire caulk around window under stairs.
-Fire caulk stair wall penetration (221) strap W.H.
-Move fire rated bathroom door on 2nd up to 3rd.
-Fire rated doors needed in first floor, lobby, and 3rd floor.
Inspector Comments:
07/12/2013PassQuinton OwensBuilding Final
-Tags for rated doors and rated glass doors being shipped.
-Escutcheon needed for sprinkler under east stair (above door)
Mag locks?
***Approval temp- for only 30 days max
Inspector Comments:
08/15/2013PassQuinton OwensBuilding Final
Items inside (firedoors, glazing and under est stair) done.
*H.C. parking signs not hung yet. - done 8/15
Inspector Comments:
Page 3 of 6
(Continued)
Permit Details Permit Number: 11-00390
37 S 2nd E - New Building - Beaumont
37 S 2nd E
New Commercial Building
Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm
Permit
Inspection
Summary
Electrical
01/18/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover third level only.Inspector Comments:
01/30/2013PassBret StoddardCommercial Electrical Rough-in
2nd Floor approved per Jane Shaw.Inspector Comments:
02/12/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in bathrooms with hard ceilings on 2nd and 3rd floor, and
workroom on 3rd, reception on 3rd.
Inspector Comments:
03/01/2013PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent power.
Went over exit light with Kevin.
Inspector Comments:
03/14/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in lease D room 303
Exit sign required for other exit in space 303 next to door.
Inspector Comments:
05/17/2013PassBret StoddardCommercial Electrical Rough-in
Ceiling Inspection 2 + 3 floor - Approved for cover with ceiling tiler on 2nd and
third floor.
Inspector Comments:
05/19/2013FailBret StoddardCommercial Electrical Rough-in
Electrical Trim- seismic wire missing 2 & 3 floors.Inspector Comments:
06/11/2013PassBret StoddardCommercial Electrical Rough-in
-3rd level - ceilings on north area (lease space)
-Approved to lay on tiles on 1st level on ceilings.
Inspector Comments:
07/03/2013FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
-Water heater 324 breaker lock. 322 procedure switch for light - no light. also
315.315 - open neutral 2 receps. 327 - GFCI no mounted moved. 303A no power
receps. GFCI for disposal and dishwasher (303) 245 mech room W.H. breaker
lock. 216 open neutral. GFCI protection - by sin nurses station (N).
Inspector Comments:
07/08/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. entire building.
Label panels.
Inspector Comments:
Page 4 of 6
(Continued)
Permit Details Permit Number: 11-00390
37 S 2nd E - New Building - Beaumont
37 S 2nd E
New Commercial Building
Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm
Permit
Inspection
Summary
Fire
08/22/2012PassPLL ADMINFire Underground Inspection
Thrust block - underground - thrust block for sprinkler riser (fire) installed and
looks adequate. Interior.
Approved per Jon Berry.
Inspector Comments:
11/13/2012PassPLL ADMINFire Underground Inspection
Flush test - fire sprinkler mainline - underground flushed for 20 mins.Inspector Comments:
01/17/2013PassDale PickeringFire Sprinkler Rough-in
Approved for 3rd floor only.
2nd floor needs bracing and additional heads.
Inspector Comments:
06/27/2013PassBret StoddardFire Alarm Final Inspection
-Witnessed flow switch operation (45 second)
-Witnessed 24 hr 5 minute test 11:49pm 6/26 - 1:10pm 6/27/13
-Witnessed tamper switch operation.
(Door holders - eggress)
Inspector Comments:
06/28/2013FailDale PickeringFire Sprinkler Hydro
-210 # PSI 10:25 6/28/13-
-Leak found.
Inspector Comments:
Mechanical
06/27/2013FailQuinton OwensHVAC Final Inspection
Fire caulk around dryer vent under stairs.
#323 exhaust fan? bathroom.
Inspector Comments:
03/20/2014PassPLL ADMINHVAC Final Inspection
No record found.
C of O was issued. Assuming pass for HVAC final reinspect.
Inspector Comments:
Page 5 of 6
(Continued)
Permit Details Permit Number: 11-00390
37 S 2nd E - New Building - Beaumont
37 S 2nd E
New Commercial Building
Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm
Permit
Inspection
Summary
Plumbing
08/14/2012PassPLL ADMINPlumbing Rough-in
South half of building.
Approved per Nathan Wood.
Inspector Comments:
11/26/2012PassDon AllenPlumbing Underground Inspection
Underground - partial - approved.Inspector Comments:
12/17/2012PassDon AllenPlumbing Underground Inspection
Good to coverInspector Comments:
01/22/2013PassDon AllenPlumbing Water
all good to cover.Inspector Comments:
01/31/2013PassDon AllenPlumbing Rough-in
The 2nd floor is good to cover.Inspector Comments:
06/27/2013PassDon AllenPlumbing Final Inspection
T & P drops needed to be put in.Inspector Comments: