Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00390 - 37 S 2nd E - New Building - BeaumontPermit Inspection Summary Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm Permit Details Permit Number: 11-00390 37 S 2nd E - New Building - Beaumont 37 S 2nd E New Commercial Building Permit Issued Date: 03/20/2014 Permit Inspection Statistics 38Total Inspections Completed: 29Total Inspections Passed: Inspection Pass Rate: 76.32% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 11/28/11 JB: East footings and rebar look good.Inspector Comments: 12/06/2011PassPLL ADMINFooting Inspection 12/6/11 JB: West footing ok to pour. Approved as per Jon Berry. Inspector Comments: 12/20/11 JB: Foundation and footings look good East and south sides Int. Footings east. Inspector Comments: 01/09/2012PassPLL ADMINFoundation Inspection 1/9/12 JB: Foundation and rebar look good. Approved per Jon Berry. Inspector Comments: 06/26/2012FailQuinton OwensSheeting -Several missed locations (marked in red) -Some blocking missed on 2nd floor near stairs on east wall. Inspector Comments: 06/29/2012PassQuinton OwensSheeting Sheathing approved.Inspector Comments: 01/22/2013FailTed DyeFraming/Structure Inspection 3rd floor - header of wall under duct across form elevator. Ok? on separation of rooms and corridors. OK. Inspector Comments: 01/23/2013PassTed DyeFraming/Structure Inspection 3rd floor complete.Inspector Comments: 01/23/2013PassTed DyeInsulation Inspection 3rd floor wall are complete.Inspector Comments: Page 1 of 6 (Continued) Permit Details Permit Number: 11-00390 37 S 2nd E - New Building - Beaumont 37 S 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm Permit Inspection Summary 1/31/13 QO: Framing and Insulation (lvl 2) - Finish insulation in exterior duct shafts (for re-inspection) -Shafts not rated? Penetrations? -Blocking removed from behind W.C. (grab bar) -Stud & blocking removed by roof drain shaft. (2ea) Vertical grab bar backing missing (west) -Some walls missing fire blocking -Top plate needed above door NW area. -Notches in top chords of joists (East side lobby) -Stud cut on exterior wall at mech. duct penetrations. Inspector Comments: 01/31/2013FailQuinton OwensFraming/Structure Inspection 2/13/13 QO: Lvl 2 - Insulation and Framing reinspect: Mostly drywalled Visible items (not covered) are not done. **DID NOT INSPECT** Inspector Comments: 02/25/2013FailQuinton OwensFraming/Structure Inspection Framing (lvl 1) -Several corners missing backing for nailing drywall. -Some bottom plates not nailed down. -Some anchor bolts missing washers/nuts (stairs) Some restrooms need backing for vertical grab bar. Action required: see above. Also fix cut ext. stud with header at mech. duct (2nd floor). Inspector Comments: 03/01/2013PassQuinton OwensFraming/Structure Inspection Framing (1st floor) reinspect and insulation - ok to drywall.Inspector Comments: 03/13/2013PassQuinton OwensFraming/Structure Inspection Framing (lvl 1) & Insulation - framing items fixed. -Missing insulation installed. -Windows and doors finished sealing around perimeters. Ok to drywall. Action required: elect. and plumb. rough must be ok for cover. Inspector Comments: 2/19/13 QO: Sheetrock, screw - lvl 2 - partially finished. Add screws at missed locations (marked with pencil) Approved partial. Inspector Comments: 2/19/13 QO: Sheetrock, screw - lvl 3 - 3rd floor drywall. - A few studs and spots missing screws. Indicated to drywallers the locations. (fix before taping). Action required: reinspect unfinished rooms. Inspector Comments: Page 2 of 6 (Continued) Permit Details Permit Number: 11-00390 37 S 2nd E - New Building - Beaumont 37 S 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm Permit Inspection Summary 03/28/2013PassQuinton OwensSheetrock/Drywall Inspection 3/28/13 QO: Sheetrock screw - lvl 1 - OK to tape. (5/8" type x at required locations). Inspector Comments: 07/08/2013FailQuinton OwensBuilding Final -Address #'s (min 4" high and contrasting color) -Washer/dryer added under stairs insufficient headroom, dryer vent annular space not fire caulked, washer box: not rated. Penetration. -Holes in rated wall under stairs (same areas as above) -Fire caulk around window under stairs. -Fire caulk stair wall penetration (221) strap W.H. -Move fire rated bathroom door on 2nd up to 3rd. -Fire rated doors needed in first floor, lobby, and 3rd floor. Inspector Comments: 07/12/2013PassQuinton OwensBuilding Final -Tags for rated doors and rated glass doors being shipped. -Escutcheon needed for sprinkler under east stair (above door) Mag locks? ***Approval temp- for only 30 days max Inspector Comments: 08/15/2013PassQuinton OwensBuilding Final Items inside (firedoors, glazing and under est stair) done. *H.C. parking signs not hung yet. - done 8/15 Inspector Comments: Page 3 of 6 (Continued) Permit Details Permit Number: 11-00390 37 S 2nd E - New Building - Beaumont 37 S 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm Permit Inspection Summary Electrical 01/18/2013PassBret StoddardCommercial Electrical Rough-in Approved for cover third level only.Inspector Comments: 01/30/2013PassBret StoddardCommercial Electrical Rough-in 2nd Floor approved per Jane Shaw.Inspector Comments: 02/12/2013PassBret StoddardCommercial Electrical Rough-in Approved for cover in bathrooms with hard ceilings on 2nd and 3rd floor, and workroom on 3rd, reception on 3rd. Inspector Comments: 03/01/2013PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power. Went over exit light with Kevin. Inspector Comments: 03/14/2013PassBret StoddardCommercial Electrical Rough-in Approved for cover in lease D room 303 Exit sign required for other exit in space 303 next to door. Inspector Comments: 05/17/2013PassBret StoddardCommercial Electrical Rough-in Ceiling Inspection 2 + 3 floor - Approved for cover with ceiling tiler on 2nd and third floor. Inspector Comments: 05/19/2013FailBret StoddardCommercial Electrical Rough-in Electrical Trim- seismic wire missing 2 & 3 floors.Inspector Comments: 06/11/2013PassBret StoddardCommercial Electrical Rough-in -3rd level - ceilings on north area (lease space) -Approved to lay on tiles on 1st level on ceilings. Inspector Comments: 07/03/2013FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection -Water heater 324 breaker lock. 322 procedure switch for light - no light. also 315.315 - open neutral 2 receps. 327 - GFCI no mounted moved. 303A no power receps. GFCI for disposal and dishwasher (303) 245 mech room W.H. breaker lock. 216 open neutral. GFCI protection - by sin nurses station (N). Inspector Comments: 07/08/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O. entire building. Label panels. Inspector Comments: Page 4 of 6 (Continued) Permit Details Permit Number: 11-00390 37 S 2nd E - New Building - Beaumont 37 S 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm Permit Inspection Summary Fire 08/22/2012PassPLL ADMINFire Underground Inspection Thrust block - underground - thrust block for sprinkler riser (fire) installed and looks adequate. Interior. Approved per Jon Berry. Inspector Comments: 11/13/2012PassPLL ADMINFire Underground Inspection Flush test - fire sprinkler mainline - underground flushed for 20 mins.Inspector Comments: 01/17/2013PassDale PickeringFire Sprinkler Rough-in Approved for 3rd floor only. 2nd floor needs bracing and additional heads. Inspector Comments: 06/27/2013PassBret StoddardFire Alarm Final Inspection -Witnessed flow switch operation (45 second) -Witnessed 24 hr 5 minute test 11:49pm 6/26 - 1:10pm 6/27/13 -Witnessed tamper switch operation. (Door holders - eggress) Inspector Comments: 06/28/2013FailDale PickeringFire Sprinkler Hydro -210 # PSI 10:25 6/28/13- -Leak found. Inspector Comments: Mechanical 06/27/2013FailQuinton OwensHVAC Final Inspection Fire caulk around dryer vent under stairs. #323 exhaust fan? bathroom. Inspector Comments: 03/20/2014PassPLL ADMINHVAC Final Inspection No record found. C of O was issued. Assuming pass for HVAC final reinspect. Inspector Comments: Page 5 of 6 (Continued) Permit Details Permit Number: 11-00390 37 S 2nd E - New Building - Beaumont 37 S 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 04/13/2020 2:38 pm Permit Inspection Summary Plumbing 08/14/2012PassPLL ADMINPlumbing Rough-in South half of building. Approved per Nathan Wood. Inspector Comments: 11/26/2012PassDon AllenPlumbing Underground Inspection Underground - partial - approved.Inspector Comments: 12/17/2012PassDon AllenPlumbing Underground Inspection Good to coverInspector Comments: 01/22/2013PassDon AllenPlumbing Water all good to cover.Inspector Comments: 01/31/2013PassDon AllenPlumbing Rough-in The 2nd floor is good to cover.Inspector Comments: 06/27/2013PassDon AllenPlumbing Final Inspection T & P drops needed to be put in.Inspector Comments: Page 6 of 6