Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00352 - All Studio Apartments - RemodelPermit Inspection Summary Permit Status of (Open) as of Report Date: 04/13/2020 2:07 pm Permit Details Permit Number: 11-00352 All Studio Apartments - Remodel 450 W 4th S Multi-Family - Remodel Permit Issued Date: 04/29/2014 Permit Inspection Statistics 17Total Inspections Completed: 14Total Inspections Passed: Inspection Pass Rate: 82.35% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 11/02/2011PassSAUREY AMANDAInsulation Inspection 12/23/2011PassPLL ADMINFraming/Structure Inspection In accessible units only. As per Jon Berry. Inspector Comments: 12/30/2011PassPLL ADMINSheetrock/Drywall Inspection As per Jon Berry.Inspector Comments: 12/30/2011N/APLL ADMINSidewalk Inspection as per Jon Berry.Inspector Comments: 02/21/2012PassQuinton OwensCommercial Building Final 12/30/2011: West half okay to occupy 02/21/2012: East half completed building final As per Jon Berry Inspector Comments: Electrical 12/26/2011PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover in the ceilings-1st and 2nd floor.Inspector Comments: 12/27/2011PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Approved for a final and C.O. in units#101-125 and #201-226 electrical only-inspected the kitchen areas for cover on the first and second floor. Inspector Comments: 02/06/2012FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Need to install breaker blanks in the panel in the managers unit, 134 locked, GFPE protection required on the roof for the heat tape circuits, cabinets are over the top of the receptacles in the areas by the bathrooms in several units, call for a re-inspect when ready. Inspector Comments: 02/08/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Approved for a final and C.O.-all deficiencies done-east units, smoke detectors were moved out of the bathrooms in the ADA units(2). Inspector Comments: 12/27/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover in the kitchen areas on the first and second floors-separate ticket not written for the rough-in- inspected this on one of the final inspections. Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 11-00352 All Studio Apartments - Remodel 450 W 4th S Multi-Family - Remodel Permit Status of (Open) as of Report Date: 04/13/2020 2:07 pm Permit Inspection Summary Fire 12/28/2011FailBret StoddardFire Alarm Final Inspection Tamper switch required for the main valve by foundation-basement, sprinkler heads need to have covers removed in the entire building where a portion of the building is going to be occupied, fire extinguishers are installed, pull stations, smoke detectors, beam smoke det., tampers and flow switches, horn strobes, and water gong are all operational, 4:20PM AC power loss 12/27, 4:25PM AC power back on and 5 minute test is complete/Approved, call for a re-inspect when ready. Inspector Comments: 12/30/2011PassPLL ADMINFire Department Final Inspection Sprinkler hydro tested good @200psi 12/28 tested ok tamper put on building shut off valve. As per Jon Berry. Inspector Comments: 12/30/2011PassPLL ADMINFire Alarm Final Inspection All covers removed and room smokes tested good As per Jon Berry. Inspector Comments: Mechanical 02/22/2012PassPLL ADMINHVAC Rough-in West half OK 12/30/11 As per Jon Berry. Inspector Comments: 02/22/2012PassPLL ADMINHVAC Final Inspection West half ok 12/30 As per Jon Berry. Inspector Comments: Plumbing 10/25/2011PassDon AllenPlumbing Rough-in All rooms good.Inspector Comments: 12/27/2011PassDon AllenPlumbing Final Inspection 2/9/12 - Water all good for C/O.Inspector Comments: Page 2 of 2