HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00338 - 2470 W 960 S - New SFRPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 04/13/2020 1:51 pm
Permit Details Permit Number: 11-00338
2470 W 960 S - New SFR
2470 W 960 S
New Single Family Residence
Permit Issued Date: 10/27/2014
Permit Inspection Statistics
18Total Inspections Completed:
16Total Inspections Passed:
Inspection Pass Rate: 88.89%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
04/11/2012PassQuinton OwensResidential Footing Inspection
Rebar clean and supported with proper clearances. Dowels ready with bends.Inspector Comments:
04/13/2012PassQuinton OwensFoundation Inspection
06/13/2012FailQuinton OwensResidential Framing/Structure Inspection
5-30, QO: Sheathing needs fasteners in various locations - will reinspect with
framing insp. Patch gaps & holes in firewall. Roof vent in overburn protection.
Finish firewall at floor/ceiling.
Inspector Comments:
06/18/2012FailQuinton OwensResidential Insulation Inspection
#5 sliding door not sealed at perimeter.
Need to add more venting in upper portion of attic or more baffles for soffit
venting.
Inspector Comments:
06/18/2012PassQuinton OwensResidential Insulation Inspection
#4 approved
#5 sliding door not sealed
#6 approved
Inspector Comments:
06/25/2012PassQuinton OwensResidential Sheetrock/Drywall Inspection
firewall at floor ceiling approved by John?Inspector Comments:
08/02/2012PassQuinton OwensResidential Building Final
Building final OKInspector Comments:
08/15/2012PassQuinton OwensResidential Framing/Structure Inspection
Tyson verified approval with Jon at building on fire separation at floor joist level
between 2-3 and 4-5. He said Jon was there briefly, but no ticket found in file for
inspection.
Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 11-00338
2470 W 960 S - New SFR
2470 W 960 S
New Single Family Residence
Permit Status of (Open) as of Report Date: 04/13/2020 1:51 pm
Permit
Inspection
Summary
Electrical
06/12/2012PassBret StoddardResidential Electrical Service Inspection
Approved to be energized for permanent power for all units in this building-only
one ticket was written for the rough-in of unit # 2476, 2470, and 2464. Only one
ticket was written for the service for all units also.
Inspector Comments:
06/12/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover-only one ticket was written for the rough-in of unit # 2476,
2470, and 2464. Only one (same) ticket was written for the service for all units
also.
Inspector Comments:
08/02/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final and C.O. (2470 only).Inspector Comments:
Mechanical
06/13/2012PassQuinton OwensHVAC Rough-in
Pull return air vent away from B-vent and up off comb. air vent.Inspector Comments:
08/02/2012PassQuinton OwensHVAC Final Inspection
Mech final OKInspector Comments:
Plumbing
05/01/2012PassDon AllenPlumbing Sewer
05/01/2012PassDon AllenPlumbing Water
05/01/2012PassDon AllenPlumbing Underground Inspection
08/06/2012PassDon AllenPlumbing Rough-in
08/06/2012PassDon AllenPlumbing Final Inspection
all good for C/OInspector Comments:
Page 2 of 2