HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00333 - Blue Water Days Bldg #3 - 18 PlexPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 04/13/2020 1:41 pm
Permit Details Permit Number: 11-00333
Blue Water Days Bldg #3 - 18 Plex
332 S 4th W
New Multi-Family Residence
Permit Issued Date: 03/06/2014
Permit Issued Date: 11/11/2016
Permit Inspection Statistics
23Total Inspections Completed:
22Total Inspections Passed:
Inspection Pass Rate: 95.65%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
03/22/2012PassPLL ADMINFooting Inspection
As per Jon Berry.Inspector Comments:
03/29/2012PassPLL ADMINFoundation Inspection
Ok to pour still need some forms in place.
As per Jon Berry.
Inspector Comments:
09/28/2012PassPLL ADMINFraming/Structure Inspection
6/19 Exterior sheathing nailing ok to cover
9/19 anchor bolts missing CW
shear wall bottom plate nailing CW
Fire caulk bath fans etc CW
?? on where panels meet see detail sheet from ES2
1/28: West end of building drywalled with 5/8" (incl. attic and soffit) for fire
separation.
Approved as per Jon Berry
Inspector Comments:
10/31/2012PassPLL ADMINInsulation Inspection
Ok - approved as per Jon Berry.Inspector Comments:
1/18/13 QO: Sheetrock (west end- fire code) - 5/8" drywall covered west end
including attic and soffit.
Inspector Comments:
1/3/13 QO: Sheetrock (mech room, office) - ok to tape drywall all 5/8" type xInspector Comments:
11/28/2012PassQuinton OwensSheetrock/Drywall Inspection
4/29/13 QO: Sheetrock (mech rooms) - drywall ok to tape.Inspector Comments:
12/13/2012FailQuinton OwensInsulation Inspection
insulate gaps in ext. walls.Inspector Comments:
01/03/2013PassQuinton OwensInsulation Inspection
ok to tape drywall all 5/8"type xInspector Comments:
2/13/13: Apts Units only - bldg final approved for apt units only.
-office area/boiler room not inspected.
Inspector Comments:
02/24/2013PassQuinton OwensBuilding Final
11/19/13: Office & Boiler rooms completed (bldg & mech final)Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 11-00333
Blue Water Days Bldg #3 - 18 Plex
332 S 4th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 04/13/2020 1:41 pm
Permit
Inspection
Summary
Electrical
08/23/2012Pass Commercial Electrical Rough-in
Approved to insulate the exterior walls and party walls-no SE cable is installed.
Must re-inspect before covering for SE cable and interior wiring. Notes were
entered on the wrong permit-these notes are entered in on 11-331.
Inspector Comments:
10/31/2012Pass Commercial Electrical Rough-in
Approved for cover in the east portion mechanical room and office area.Inspector Comments:
11/20/2012Pass COM & MFR Electrical Service Inspection
Approved to be energized for permanent power(2).Inspector Comments:
02/11/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. in the units only-mechanical room and east end of
building not done. All items were done before I left the site by electrical
contractor.
Inspector Comments:
Fire
05/10/2012PassDale PickeringFire Sprinkler Hydro
hydro checked good at 200# 2hrs.
As per Jon Berry.
Inspector Comments:
02/12/2013PassSAUREY AMANDAFire Sprinkler Rough-in
9/27 sprinkler test good to 200# ok to cover
10/22 DA Fire caulking failed- SE cable needs caulking, 2nd floor 3" piping ABS
needs fire rings.
Inspector Comments:
02/14/2013Pass Fire Alarm Final Inspection
Witnessed 24 hour/5 minute test and report is attached to the inspection ticket.
The last manual pull station was installed before I left the site. Approved for final
and C.O.
Inspector Comments:
11/04/2013Pass Fire Sprinkler Final Inspection
Hydro on balcony sprinklers;Pass 10/29
also approved fire extinguishers.
Inspector Comments:
11/19/2013Pass Fire Alarm Final Inspection
Approved for a final and C.O. building #3-witnessed operation of tamper switches
for new loops installed.
Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 11-00333
Blue Water Days Bldg #3 - 18 Plex
332 S 4th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 04/13/2020 1:41 pm
Permit
Inspection
Summary
Mechanical
10/22/2012PassPLL ADMINHVAC Rough-in
5/10 JB: in floor heat looked good, maintain pressure until after pour.
5/11 JB: In floor heating ok to cover, keep pressure on until after pour.
10/22 JB: In floor heat ok to cover
Bath exhaust fans fire caulked
-2nd floor west end unit need fire durig* on 3" pipe at ceiling next unit. All 2nd
floor.
-SE cables need fire caulking *DA*
Inspector Comments:
02/13/2013PassQuinton OwensHVAC Final Inspection
Build/ Mech finals OKInspector Comments:
02/14/2013PassQuinton OwensHVAC Final Inspection
11/19/13: Office & Boiler rooms completed (bldg & mech final)Inspector Comments:
Plumbing
05/01/2012Pass Plumbing Sewer
05/18/2012Pass Plumbing Underground Inspection
4/17 DA: Ground work inspection - all good to cover.Inspector Comments:
02/11/2013Pass Plumbing Final Inspection
all good for COInspector Comments:
Page 3 of 3