HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00333 - Blue Water Days Bldg #3 - 18 PlexPermit Inspection Summary Permit Status of (Open) as of Report Date: 04/13/2020 1:41 pm Permit Details Permit Number: 11-00333 Blue Water Days Bldg #3 - 18 Plex 332 S 4th W New Multi-Family Residence Permit Issued Date: 03/06/2014 Permit Issued Date: 11/11/2016 Permit Inspection Statistics 23Total Inspections Completed: 22Total Inspections Passed: Inspection Pass Rate: 95.65% Permit Inspection History *Refer to Individual Inspection Report for more Details Building 03/22/2012PassPLL ADMINFooting Inspection As per Jon Berry.Inspector Comments: 03/29/2012PassPLL ADMINFoundation Inspection Ok to pour still need some forms in place. As per Jon Berry. Inspector Comments: 09/28/2012PassPLL ADMINFraming/Structure Inspection 6/19 Exterior sheathing nailing ok to cover 9/19 anchor bolts missing CW shear wall bottom plate nailing CW Fire caulk bath fans etc CW ?? on where panels meet see detail sheet from ES2 1/28: West end of building drywalled with 5/8" (incl. attic and soffit) for fire separation. Approved as per Jon Berry Inspector Comments: 10/31/2012PassPLL ADMINInsulation Inspection Ok - approved as per Jon Berry.Inspector Comments: 1/18/13 QO: Sheetrock (west end- fire code) - 5/8" drywall covered west end including attic and soffit. Inspector Comments: 1/3/13 QO: Sheetrock (mech room, office) - ok to tape drywall all 5/8" type xInspector Comments: 11/28/2012PassQuinton OwensSheetrock/Drywall Inspection 4/29/13 QO: Sheetrock (mech rooms) - drywall ok to tape.Inspector Comments: 12/13/2012FailQuinton OwensInsulation Inspection insulate gaps in ext. walls.Inspector Comments: 01/03/2013PassQuinton OwensInsulation Inspection ok to tape drywall all 5/8"type xInspector Comments: 2/13/13: Apts Units only - bldg final approved for apt units only. -office area/boiler room not inspected. Inspector Comments: 02/24/2013PassQuinton OwensBuilding Final 11/19/13: Office & Boiler rooms completed (bldg & mech final)Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 11-00333 Blue Water Days Bldg #3 - 18 Plex 332 S 4th W New Multi-Family Residence Permit Status of (Open) as of Report Date: 04/13/2020 1:41 pm Permit Inspection Summary Electrical 08/23/2012Pass Commercial Electrical Rough-in Approved to insulate the exterior walls and party walls-no SE cable is installed. Must re-inspect before covering for SE cable and interior wiring. Notes were entered on the wrong permit-these notes are entered in on 11-331. Inspector Comments: 10/31/2012Pass Commercial Electrical Rough-in Approved for cover in the east portion mechanical room and office area.Inspector Comments: 11/20/2012Pass COM & MFR Electrical Service Inspection Approved to be energized for permanent power(2).Inspector Comments: 02/11/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O. in the units only-mechanical room and east end of building not done. All items were done before I left the site by electrical contractor. Inspector Comments: Fire 05/10/2012PassDale PickeringFire Sprinkler Hydro hydro checked good at 200# 2hrs. As per Jon Berry. Inspector Comments: 02/12/2013PassSAUREY AMANDAFire Sprinkler Rough-in 9/27 sprinkler test good to 200# ok to cover 10/22 DA Fire caulking failed- SE cable needs caulking, 2nd floor 3" piping ABS needs fire rings. Inspector Comments: 02/14/2013Pass Fire Alarm Final Inspection Witnessed 24 hour/5 minute test and report is attached to the inspection ticket. The last manual pull station was installed before I left the site. Approved for final and C.O. Inspector Comments: 11/04/2013Pass Fire Sprinkler Final Inspection Hydro on balcony sprinklers;Pass 10/29 also approved fire extinguishers. Inspector Comments: 11/19/2013Pass Fire Alarm Final Inspection Approved for a final and C.O. building #3-witnessed operation of tamper switches for new loops installed. Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 11-00333 Blue Water Days Bldg #3 - 18 Plex 332 S 4th W New Multi-Family Residence Permit Status of (Open) as of Report Date: 04/13/2020 1:41 pm Permit Inspection Summary Mechanical 10/22/2012PassPLL ADMINHVAC Rough-in 5/10 JB: in floor heat looked good, maintain pressure until after pour. 5/11 JB: In floor heating ok to cover, keep pressure on until after pour. 10/22 JB: In floor heat ok to cover Bath exhaust fans fire caulked -2nd floor west end unit need fire durig* on 3" pipe at ceiling next unit. All 2nd floor. -SE cables need fire caulking *DA* Inspector Comments: 02/13/2013PassQuinton OwensHVAC Final Inspection Build/ Mech finals OKInspector Comments: 02/14/2013PassQuinton OwensHVAC Final Inspection 11/19/13: Office & Boiler rooms completed (bldg & mech final)Inspector Comments: Plumbing 05/01/2012Pass Plumbing Sewer 05/18/2012Pass Plumbing Underground Inspection 4/17 DA: Ground work inspection - all good to cover.Inspector Comments: 02/11/2013Pass Plumbing Final Inspection all good for COInspector Comments: Page 3 of 3