HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00332 - Blue Water Days Bldg #2 - 21 PlexPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 04/13/2020 1:40 pm
Permit Details Permit Number: 11-00332
Blue Water Days Bldg #2 - 21 Plex
332 S 4th W
New Multi-Family Residence
Permit Issued Date: 03/05/2014
Permit Inspection Statistics
27Total Inspections Completed:
22Total Inspections Passed:
Inspection Pass Rate: 81.48%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
04/02/2012PassPLL ADMINFooting Inspection
Ok - as per Jon Berry.Inspector Comments:
04/05/2012PassQuinton OwensFoundation Inspection
4/5 QO:- done b/w other inspections, no time to verify with plans but clearances
were good.
5/14 JB: 5/17 Floor ok to pour- rebar and in floor heat.
Inspector Comments:
06/19/2012PassPLL ADMINSheeting
As per Jon Berry - exterior sheeting nailing ok to cover bldgs 2 & 3.Inspector Comments:
02/19/2013PassQuinton OwensInsulation Inspection
2/11: Mechanical Room mostly done (some drywall hung) finish insul after elect.
is done.
Inspector Comments:
10/31 Exterior walls ok to insulateInspector Comments:
03/04/2013PassQuinton OwensFraming/Structure Inspection
3/4/ QO: Fire caulking in non rated walls: 3rd floor (2nd apt from south end)
firecaulk bottom plate where water lines go to tub valve. Fix stud between kitch
& bath (3rd apt from north on top floor)
Inspector Comments:
3/26, QO: 3rd floor approved for taping (all 5/8" type x).Inspector Comments:
4/3, QO: 2nd floor approved for taping (all 5/8" type x).Inspector Comments:
4/12, QO: 1st floor missing screws in North end unit in bedrooms and 2nd unit
from south by electrical panel. (fixed 4/16, QO)
Inspector Comments:
04/12/2013PassQuinton OwensSheetrock/Drywall Inspection
4/29, QO: Mech rooms - drywall ok to tape.Inspector Comments:
08/29/2013FailQuinton OwensCommercial Building Final
Fire caulk under bthrm sinks on 2nd & 3rd levels and in accessible unit.Inspector Comments:
08/30/2013FailQuinton OwensCommercial Building Final
Follow up re-inspection: Units only completed.
Laundry & mechanical room not ready.
Inspector Comments:
11/19/2013FailQuinton OwensCommercial Building Final
Laundry & Mech. room fire caulking needed as indicated.Inspector Comments:
01/17/2014PassQuinton OwensCommercial Building Final
Page 1 of 3
(Continued)
Permit Details Permit Number: 11-00332
Blue Water Days Bldg #2 - 21 Plex
332 S 4th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 04/13/2020 1:40 pm
Permit
Inspection
Summary
Electrical
09/20/2012Pass Commercial Electrical Rough-in
Approved for cover in the exterior and interior walls except where the SER cable
is to be installed-do not cover these areas.
Inspector Comments:
04/02/2013Pass COM & MFR Electrical Service Inspection
Approved to be energized for permanent power-(2 services).Inspector Comments:
08/16/2013FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Unit #2301 bathroom GFCI has reverse polarity, all 3rd level has 50A breakers
installed-wire size only allows 40A maximum size, call for a re-inspect when
ready.
Inspector Comments:
08/19/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final-electrical only in all units-mechanical room for building not
done.
Inspector Comments:
08/30/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. entire building.Inspector Comments:
Fire
09/23/2012Pass Fire Sprinkler Final Inspection
03/26/2013PassDale PickeringFire Sprinkler Hydro
hydro in bldg #3
205# @ 1300
205# @ 1500
Inspector Comments:
08/30/2013Pass Fire Alarm Final Inspection
Witnessed 24 Hour/ 5 minute test from 2:00PM 8/29 to 2:00PM 8/30, witnessed
all signalling and initiating devices operating, flow switch test not done because
the orifice size is to large-not for one head operation.Approved for a final and
C.O.-fire alarm only.
Inspector Comments:
09/03/2013Pass Fire Alarm Final Inspection
Approved for a temporary C.O. only, flow switch-wrong orifice size for
one/smallest head in the system, tampers not installed for both buildings-# 1 and
2.
Inspector Comments:
11/19/2013Pass Fire Alarm Final Inspection
Approved for a final and C.O. building #2 only-one ticket was written for both
bldg. #1 and #2-building #1 is missing a breaker blank in mech. room panel and
sheeting needs to be installed to cover NM-B cabling, witnessed operation of
tamper switches for new loops installed.
Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 11-00332
Blue Water Days Bldg #2 - 21 Plex
332 S 4th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 04/13/2020 1:40 pm
Permit
Inspection
Summary
Mechanical
08/29/2013PassQuinton OwensHVAC Rough-in
8/29,QO: Units approved. Need final inspection on lndry/mech room when
finished.
Checked vents with drywall inspection.
Inspector Comments:
08/29/2013FailDon AllenHVAC Final Inspection
8/29,QO: Units approved. Need final inspection on lndry/mech room when
finished.
Inspector Comments:
11/19/2013PassDon AllenHVAC Final Inspection
Mech. good. Fire caulking to be completed for building finalInspector Comments:
Plumbing
09/10/2012Pass Plumbing Rough-in
all good to cover rough in.Inspector Comments:
09/03/2013Pass Plumbing Water
09/03/2013Pass Plumbing Sewer
09/03/2013Pass Plumbing Final Inspection
All good for the c/oInspector Comments:
Page 3 of 3