Permit Status of (Open) as of Report Date: 04/13/2020 1:37 pm
Permit Details Permit Number: 11-00329
Arpad Men's Student Housing
271 S 2nd W
New Multi-Family Residence
Permit Issued Date: 10/24/2014
Permit Inspection Statistics
20Total Inspections Completed:
16Total Inspections Passed:
Inspection Pass Rate: 80.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building
09/29/2011PassPLL ADMINSidewalk Inspection
As per Jon Berry
Curb has 3 rebar and gravel.
Inspector Comments:
10/04/2011PassPLL ADMINResidential Footing Inspection
As per Jon Berry
Footings look good.
Footings ok for addition 9/29 Drive curb ok to pour
Inspector Comments:
10/05/2011PassPLL ADMINFoundation Inspection
As per Jon Berry
Foundation and rebar look good.
Inspector Comments:
12/07/2011PassPLL ADMINResidential Framing/Structure Inspection
As per Jon Berry
10/27/11 - Addition framing looks good. Headers required in doors between
units.
11/14/11 - Upper floor (west wing) to #214 OK
12/2/11 - Framing and insulation looks good 1st floor east units.
12/7/11 - Framing and insulation looks good.
Inspector Comments:
12/07/2011PassPLL ADMINResidential Insulation Inspection
As per Jon Berry
10/31/11 - Headers and insulation in units OK to cover.
11/14/11 - Insulation OK
12/2/11 - Framing and insulation looks good 1st floor east units.
12/7/11 - Framing and insulation looks good.
Inspector Comments:
12/28/2011PassPLL ADMINResidential Building Final
As per Jon Berry
Final completed.
105 smoke CW
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 11-00329
Arpad Men's Student Housing
271 S 2nd W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 04/13/2020 1:37 pm
Permit
Inspection
Summary
10/24/2014PassPLL ADMINResidential Sheetrock/Drywall Inspection
1/3/12 - Approved by Jon Berry.Inspector Comments:
Electrical
12/01/2011FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Spark rings for P-Tac unit receptacles - all units.
Blank cover lights living rooms and bedrooms
receptacle - range moved all units
Open ground GFCI bathroom 103 no power in living rooms
Inspector Comments:
12/07/2011PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
10/28/11 - Approved for cover-electrical wiring only.
11/10/11 - Approved for cover-insulate all units except unit on end (east) 2nd
floor and far west unit(managers unit). Units on the far east are not completed
on either the first or second floors.
11/10/11 - Approved for cover-insulate all units except unit on the end (east) 2nd
floor and very far west unit (managers unit).
11/16/11 - Approved for cover in the far east unit on the second floor-none of the
units on the east side that run north and south have been inspected.
12/1/11 - Approved for cover in the east units on the main floor(2) and the
managers unit-west side, all units on the north side need spark rings for the
P-TAC units receptacles, blank covers in all units for old light boxes, receptacles
need to be moved for range being moved over all units, open ground in GFCI for
bathroom in unit 103, no power in the living room receptacles unit 103, call for a
re-inspect when ready.
12/7/11 - Approved for cover in the 2 east units second floor.
Inspector Comments:
12/20/2011FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
East units, managers, middle laundry (1st) east laundry.
Light 2nd floor managers, outside, sign, not complete, spark rings unit PTAC 101
moved.
Inspector Comments:
12/27/2011FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Breaker locks needed for heater circuits in laundry rooms, need two pole
breakers for multiwire branch circuits in laundry room-east, east units need
switches installed and lights hung, managers unit bathroom not done upper level,
call for a re-inspect when ready.
Inspector Comments:
12/28/2011PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final and C.O.Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 11-00329
Arpad Men's Student Housing
271 S 2nd W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 04/13/2020 1:37 pm
Permit
Inspection
Summary
Fire
10/25/2011PassBret StoddardFire Sprinkler Rough-in
Approved for the 200# 2 hour test on the first floor only-10:40AM 209
PSI-12:40PM 209 PSI.
Inspector Comments:
12/27/2011PassBret StoddardFire Alarm Final Inspection
24 hour tested. Fire alarm 24 hour test approved.Inspector Comments:
12/28/2011FailBret StoddardFire Department Final Inspection
Need to install knox box and water gong for fire riser and flow switch by the FDC,
call for a re-inspect when ready-no separate ticket was written for this
inspection-contacted Nephi's electric for water gong and talked with the owner
for the knox box installation.
Inspector Comments:
12/28/2011PassPLL ADMINFire Department Final Inspection
As per Jon Berry
2/21 gong installed and tested good. Knox box installed.
Inspector Comments:
Mechanical
12/28/2011PassPLL ADMINHVAC Final Inspection
As per Jon BerryInspector Comments:
01/03/2012PassPLL ADMINHVAC Rough-in
As per Jon Berry
Fireplace installation looks good gasline, vent and clearances.
Inspector Comments:
Plumbing
10/27/2011PassDon AllenPlumbing Rough-in
10/27/2011 roughin is all good need to inspect the 1/2 bath when rought inInspector Comments:
01/06/2012PassDon AllenPlumbing Final Inspection
All good for the C/OInspector Comments: