Loading...
HomeMy WebLinkAboutTRUSS SPECS - 20-00089 - 1289 Stone Dr - New SFRJob B0404-20 Truss A1GD Truss Type Hip Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:17:52 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-oTmS3ug5V48Hm6M7zRQWB?yRCrIOUS6_MeF1cPzZJlz Scale = 1:65.9 T1 T2 T1 B1 W1 W2 W3 W4 W5 W4 W5 W4 W5 W4 W3 W2 W1 T3 B1B21 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 10 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 4x12 5x6 4x12 4x8 M18SHS 3x4 2x4 4x8 3x8 2x4 4x8 2x4 5x8 2x4 4x8 3x4 2x4 5x6 4x8 M18SHS 5-6-6 5-6-6 9-9-0 4-2-10 14-5-2 4-8-2 19-3-0 4-9-14 24-0-14 4-9-14 28-9-0 4-8-2 32-11-10 4-2-10 38-6-0 5-6-6 5-6-6 5-6-6 9-9-0 4-2-10 14-5-2 4-8-2 19-3-0 4-9-14 24-0-14 4-9-14 28-9-0 4-8-2 32-11-10 4-2-10 38-6-0 5-6-6 0- 3 - 1 5 3- 5 - 4 3- 6 - 1 5 0- 3 - 1 5 3- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [1:0-1-6,0-0-1], [6:0-4-0,0-3-0], [9:0-1-6,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.74 0.77 0.65 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.78 -1.11 0.21 0.27 (loc) 14 14 9 14 l/defl >588 >414 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 396 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 3-5-6 oc purlins, except 2-0-0 oc purlins (3-2-14 max.): 3-7. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 1=4234/Mechanical, 9=4362/Mechanical Max Horz1=-30(LC 23) Max Uplift1=-382(LC 8), 9=-395(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-11820/1077, 2-3=-10665/988, 3-19=-9984/940, 19-20=-9985/940, 4-20=-9987/940, 4-5=-13541/1262, 5-6=-13541/1262, 6-21=-10012/943, 21-22=-10010/943, 7-22=-10010/943, 7-8=-10692/991, 8-9=-11837/1079 BOT CHORD 1-23=-996/11161, 23-24=-996/11161, 18-24=-996/11161, 18-25=-996/11161, 17-25=-996/11161, 17-26=-1118/12711, 26-27=-1118/12711, 16-27=-1118/12711, 15-16=-1118/12711, 15-28=-1118/12711, 14-28=-1118/12711, 14-29=-1121/12734, 29-30=-1121/12734, 13-30=-1121/12734, 13-31=-1121/12734, 12-31=-1121/12734, 12-32=-1121/12734, 32-33=-1121/12734, 11-33=-1121/12734, 11-34=-998/11177, 34-35=-998/11177, 10-35=-998/11177, 10-36=-998/11177, 36-37=-998/11177, 37-38=-998/11177, 9-38=-998/11177 WEBS 2-18=-24/525, 2-17=-1152/125, 3-17=-247/2941, 4-17=-3392/294, 4-16=-29/660, 4-14=-99/1140, 5-14=-406/69, 6-14=-96/1113, 6-12=-31/672, 6-11=-3389/294, 7-11=-248/2950, 8-11=-1142/124, 8-10=-23/517 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-4-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=39ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) All plates are MT20 plates unless otherwise indicated. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Refer to girder(s) for truss to truss connections. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 382 lb uplift at joint 1 and 395 lb uplift at joint 9. Continued on page 2 Job B0404-20 Truss A1GD Truss Type Hip Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:17:53 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-GfKrGDhkGOG8OGxKX9xlkCUcyEedDvL7bI_a8szZJly NOTES- 11) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 12) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 13) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 246 lb down and 37 lb up at 1-9-4, 246 lb down and 37 lb up at 3-9-4, 246 lb down and 37 lb up at 5-9-4, 246 lb down and 37 lb up at 7-9-4, 246 lb down and 37 lb up at 9-9-4, 246 lb down and 37 lb up at 11-9-4, 246 lb down and 37 lb up at 13-9-4 , 246 lb down and 37 lb up at 15-9-4, 246 lb down and 37 lb up at 17-9-4, 246 lb down and 37 lb up at 19-9-4, 246 lb down and 37 lb up at 21-9-4, 246 lb down and 37 lb up at 23-9-4, 246 lb down and 37 lb up at 25-9-4, 246 lb down and 37 lb up at 27-9-4, 246 lb down and 37 lb up at 29-9-4, 246 lb down and 37 lb up at 31-9-4, 246 lb down and 37 lb up at 33-9-4, and 246 lb down and 37 lb up at 35-9-4, and 249 lb down and 34 lb up at 37-9-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-86, 3-7=-86, 7-9=-86, 1-9=-16 Concentrated Loads (lb) Vert: 15=-246(B) 18=-246(B) 17=-246(B) 23=-246(B) 24=-246(B) 25=-246(B) 26=-246(B) 27=-246(B) 28=-246(B) 29=-246(B) 30=-246(B) 31=-246(B) 32=-246(B) 33=-246(B) 34=-246(B) 35=-246(B) 36=-246(B) 37=-246(B) 38=-249(B) Job B0404-20 Truss A2 Truss Type Hip Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:17:54 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-ksuDUZhM1hO??QWW5sS_HQ1oGey_yNuGpyk8gIzZJlx Scale = 1:64.9 T1 T2 T1 B1 W1 W2 W3 W4 W5 W4 W3 W2 W1 B1B21 2 3 4 5 6 7 14 13 12 11 10 9 8 15 16 17 18 19 20 21 22 3x8 5x10 MT20HS 5x10 MT20HS 3x8 3x8 M18SHS 3x4 2x4 3x8 2x4 3x8 3x8 3x4 2x4 3x8 M18SHS 6-9-6 6-9-6 12-9-0 5-11-10 19-3-0 6-6-0 25-9-0 6-6-0 31-8-10 5-11-10 38-6-0 6-9-6 6-9-6 6-9-6 12-9-0 5-11-10 19-3-0 6-6-0 25-9-0 6-6-0 31-8-10 5-11-10 38-6-0 6-9-6 0- 3 - 1 5 4- 5 - 4 4- 6 - 1 5 0- 3 - 1 5 4- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [1:0-0-2,Edge], [7:0-0-2,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.70 0.89 0.63 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.56 -0.82 0.26 0.18 (loc) 11 11-13 7 11 l/defl >823 >562 n/a >999 L/d 360 240 n/a 240 PLATES MT20 MT20HS M18SHS Weight: 164 lb FT = 0% GRIP 220/195 165/146 220/195 LUMBER- TOP CHORD 2x4 DF 2400F 2.0E *Except* T2: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 2-6-14 oc purlins, except 2-0-0 oc purlins (2-10-11 max.): 3-5. BOT CHORD Rigid ceiling directly applied or 9-4-8 oc bracing. WEBS 1 Row at midpt 4-13, 4-9 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=1957/Mechanical, 7=1957/Mechanical Max Horz1=40(LC 11) Max Uplift1=-111(LC 12), 7=-111(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-15=-5223/562, 2-15=-5116/571, 2-16=-4318/491, 3-16=-4304/506, 3-17=-4006/505, 17-18=-4008/505, 4-18=-4011/504, 4-19=-4011/504, 19-20=-4008/505, 5-20=-4006/505, 5-21=-4304/506, 6-21=-4318/491, 6-22=-5116/571, 7-22=-5223/562 BOT CHORD 1-14=-511/4862, 13-14=-511/4862, 12-13=-442/4605, 11-12=-442/4605, 10-11=-442/4605, 9-10=-442/4605, 8-9=-506/4862, 7-8=-506/4862 WEBS 2-13=-909/126, 3-13=-34/803, 4-13=-993/89, 4-9=-993/89, 5-9=-34/803, 6-9=-909/126 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=39ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-0-12 to 3-10-15, Interior(1) 3-10-15 to 12-9-0, Exterior(2) 12-9-0 to 18-2-5, Interior(1) 18-2-5 to 25-9-0, Exterior(2) 25-9-0 to 31-2-5, Interior(1) 31-2-5 to 38-5-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Refer to girder(s) for truss to truss connections. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 111 lb uplift at joint 1 and 111 lb uplift at joint 7. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0404-20 Truss A3 Truss Type Hip Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:17:55 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-C2Sbhvi_o?WsdZ5ieazDpdayA2IDhriQ2cThCkzZJlw Scale = 1:66.1 T2 T3 T2 B1 W1 W2 W3 W4 W5 W4 W3 W2 W1T1 T1 B1B21 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 19 20 5x10 MT20HS 5x10 MT20HS 3x8 3x8 M18SHS3x4 5x6 3x4 3x8 3x4 3x4 3x4 5x6 3x8 3x8 M18SHS 8-3-6 8-3-6 15-9-0 7-5-10 22-9-0 7-0-0 30-2-10 7-5-10 38-6-0 8-3-6 5-9-8 5-9-8 10-9-4 4-11-12 15-9-0 4-11-12 22-9-0 7-0-0 27-8-12 4-11-12 32-8-8 4-11-12 38-6-0 5-9-8 0- 3 - 1 5 5- 5 - 4 5- 6 - 1 5 0- 3 - 1 5 5- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [1:0-0-2,Edge], [2:0-3-0,0-3-0], [5:0-5-0,0-1-12], [7:0-3-0,0-3-0], [8:0-0-2,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.75 0.89 0.53 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.52 -0.79 0.24 0.17 (loc) 11-12 11-12 8 11-12 l/defl >882 >585 n/a >999 L/d 360 240 n/a 240 PLATES MT20 MT20HS M18SHS Weight: 167 lb FT = 0% GRIP 220/195 165/146 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except 2-0-0 oc purlins (2-10-1 max.): 4-5. BOT CHORD Rigid ceiling directly applied or 9-5-14 oc bracing. WEBS 1 Row at midpt 5-12 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=1957/Mechanical, 8=1957/Mechanical Max Horz1=49(LC 11) Max Uplift1=-111(LC 12), 8=-111(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-15=-5275/549, 2-15=-5168/556, 2-16=-4829/512, 3-16=-4692/513, 3-4=-3798/462, 4-17=-3549/464, 17-18=-3549/464, 5-18=-3549/464, 5-6=-3797/463, 6-19=-4692/513, 7-19=-4829/512, 7-20=-5168/556, 8-20=-5275/549 BOT CHORD 1-14=-499/4923, 13-14=-423/4199, 12-13=-423/4199, 11-12=-323/3548, 10-11=-419/4199, 9-10=-419/4199, 8-9=-495/4923 WEBS 2-14=-530/125, 3-14=-15/564, 3-12=-802/120, 4-12=-11/590, 5-12=-398/399, 5-11=-12/595, 6-11=-802/120, 6-9=-15/565, 7-9=-530/125 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=39ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-0-12 to 3-10-15, Interior(1) 3-10-15 to 15-9-0, Exterior(2) 15-9-0 to 21-2-5, Interior(1) 21-2-5 to 22-9-0, Exterior(2) 22-9-0 to 28-2-5, Interior(1) 28-2-5 to 38-5-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Refer to girder(s) for truss to truss connections. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 111 lb uplift at joint 1 and 111 lb uplift at joint 8. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0404-20 Truss A4 Truss Type Hip Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:17:57 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-8QZL6bkEKcnastF5m??hu2fIqsy39nRjWwyoHdzZJlu Scale = 1:66.1 T2 T3 T2 B1 W1 W2 W3 W4 W5 W4 W3 W2 W1T1 T1 B1B2SB1 SB2 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 5x6 5x6 3x8 5x6 WB3x4 5x6 3x4 3x8 3x4 3x4 3x4 5x6 3x8 5x6 WB 9-9-6 9-9-6 18-9-0 8-11-10 19-9-0 1-0-0 28-8-10 8-11-10 38-6-0 9-9-6 6-9-8 6-9-8 12-9-4 5-11-12 18-9-0 5-11-12 19-9-0 1-0-0 25-8-12 5-11-12 31-8-8 5-11-12 38-6-0 6-9-8 0- 3 - 1 5 6- 5 - 4 6- 6 - 1 5 0- 3 - 1 5 6- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [1:0-0-2,Edge], [2:0-3-0,0-3-4], [5:0-3-0,0-1-12], [7:0-3-0,0-3-4], [8:0-0-2,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.74 0.93 0.33 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.49 -0.76 0.24 0.16 (loc) 11 9-11 8 11 l/defl >936 >606 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 176 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* T1: 2x4 DF 2400F 2.0E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 2-5-3 oc purlins, except 2-0-0 oc purlins (3-4-15 max.): 4-5. BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. WEBS 1 Row at midpt 3-12, 6-11 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=1957/Mechanical, 8=1957/Mechanical Max Horz1=59(LC 11) Max Uplift1=-111(LC 12), 8=-111(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-15=-5162/491, 2-15=-5074/501, 2-3=-4634/437, 3-16=-3321/358, 4-16=-3306/373, 4-5=-3070/379, 5-17=-3300/373, 6-17=-3314/357, 6-7=-4636/437, 7-18=-5074/501, 8-18=-5163/491 BOT CHORD 1-14=-428/4827, 13-14=-338/3929, 12-13=-338/3929, 11-12=-213/3061, 10-11=-333/3930, 9-10=-333/3930, 8-9=-429/4827 WEBS 2-14=-650/142, 3-14=-8/690, 3-12=-1070/147, 4-12=-84/706, 5-12=-440/502, 5-11=-47/685, 6-11=-1077/148, 6-9=-8/692, 7-9=-648/142 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=39ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-0-12 to 3-10-15, Interior(1) 3-10-15 to 18-9-0, Exterior(2) 18-9-0 to 25-2-5, Interior(1) 25-2-5 to 38-5-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 111 lb uplift at joint 1 and 111 lb uplift at joint 8. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0404-20 Truss A5 Truss Type Common Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:17:58 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-dd7kKxls5wvRU1qHKiXwRGCT1FLEuCsskaiLp3zZJlt Scale = 1:62.5 T2 T3 B1 W1 W2 W3 W4 W5 W6 W7 W8 W9T1 T4 B1B21 2 3 4 5 6 7 8 9 10 16 15 14 13 12 11 17 18 19 20 3x6 5x6 3x6 3x6 3x6 3x4 2x4 3x8 4x4 3x4 3x8 3x4 3x4 2x4 3x6 4x6 7-8-8 7-8-8 8-2-12 0-6-4 13-8-14 5-6-2 19-3-0 5-6-2 28-5-10 9-2-10 38-6-0 10-0-6 4-6-4 4-6-4 8-2-12 3-8-8 13-8-14 5-6-2 19-3-0 5-6-2 25-4-12 6-1-12 31-6-8 6-1-12 38-6-0 6-11-8 0- 3 - 1 5 6- 8 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [4:0-2-8,0-1-8], [10:0-1-6,Edge], [15:0-1-12,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.71 0.74 0.51 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.25 -0.47 0.06 0.08 (loc) 10-11 10-11 10 10-11 l/defl >999 >766 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 169 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 2-5-1 oc purlins. BOT CHORD Rigid ceiling directly applied or 5-8-9 oc bracing. WEBS 1 Row at midpt 7-13 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 8-0-0 except (jt=length) 10=Mechanical. (lb) - Max Horz1=61(LC 11) Max Uplift All uplift 100 lb or less at joint(s) 10 except 1=-215(LC 22), 16=-147(LC 12) Max Grav All reactions 250 lb or less at joint(s) 1 except 16=2563(LC 1), 16=2563(LC 1), 16=2563(LC 1), 10=1412(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-17=-53/879, 2-17=-43/898, 2-3=-117/1321, 3-4=-107/1417, 4-5=-980/129, 5-18=-1484/181, 6-18=-1349/195, 6-19=-1412/198, 7-19=-1496/187, 7-8=-2821/264, 8-9=-2910/249, 9-20=-3395/336, 10-20=-3483/327 BOT CHORD 1-16=-832/65, 15-16=-1291/165, 14-15=-28/860, 13-14=-28/860, 12-13=-151/2267, 11-12=-151/2267, 10-11=-273/3238 WEBS 2-16=-587/127, 4-16=-2211/239, 4-15=-205/2407, 5-15=-1029/128, 5-13=-34/693, 6-13=-1/384, 7-13=-1164/142, 7-11=-8/714, 9-11=-690/151 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=39ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-0-0 to 3-10-3, Interior(1) 3-10-3 to 19-3-0, Exterior(2) 19-3-0 to 23-1-3, Interior(1) 23-1-3 to 38-5-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10 except (jt=lb) 1=215, 16=147. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss A6 Truss Type Common Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:17:59 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-5ph6XHlUsE1I6BOUtP29zTkfzfhddef0zERvLVzZJls Scale = 1:64.7 T2 T3 B1 W1 W2 W3 W4 W5 W6 W7 W8 W9T1 T4 B1B212 3 4 5 6 7 8 9 10 11 17 16 15 14 13 12 18 19 20 21 3x6 5x6 3x6 3x6 3x6 3x4 2x4 4x6 4x4 3x4 3x8 3x4 3x4 2x4 3x6 3x6 8-0-0 8-0-0 8-2-12 0-2-12 13-8-14 5-6-2 19-3-0 5-6-2 28-5-10 9-2-10 38-6-0 10-0-6 -1-6-0 1-6-0 4-6-4 4-6-4 8-2-12 3-8-8 13-8-14 5-6-2 19-3-0 5-6-2 25-4-12 6-1-12 31-6-8 6-1-12 38-6-0 6-11-8 0- 3 - 1 5 6- 8 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [11:0-1-6,Edge], [16:0-1-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.70 0.73 0.53 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.25 -0.47 0.07 0.08 (loc) 11-12 11-12 11 11-12 l/defl >999 >775 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 172 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 2-6-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 5-2-7 oc bracing. WEBS 1 Row at midpt 8-14 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 17=2667/0-5-8 (min. 0-2-14), 11=1387/Mechanical Max Horz17=66(LC 11) Max Uplift17=-339(LC 12), 11=-51(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-18=-558/1100, 3-18=-553/1166, 3-4=-676/1615, 4-5=-666/1711, 5-6=-840/13, 6-19=-1406/79, 7-19=-1271/93, 7-20=-1334/99, 8-20=-1417/89, 8-9=-2743/166, 9-10=-2833/151, 10-21=-3318/238, 11-21=-3407/229 BOT CHORD 2-17=-1041/567, 16-17=-1570/700, 15-16=0/753, 14-15=0/753, 13-14=-51/2193, 12-13=-51/2193, 11-12=-180/3165 WEBS 3-17=-565/165, 5-17=-2333/433, 5-16=-473/2563, 6-16=-1097/279, 6-14=-205/702, 7-14=0/453, 8-14=-1163/143, 8-12=-8/715, 10-12=-691/153 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=39ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-9 to 2-3-10, Interior(1) 2-3-10 to 19-3-0, Exterior(2) 19-3-0 to 23-1-3, Interior(1) 23-1-3 to 38-5-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11 except (jt=lb) 17=339. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss A7 Truss Type Common Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:00 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-Z?FUldm7dX98jLzgR7ZOWhHrr32DM5y9CuBSuyzZJlr Scale = 1:65.4 T2 T3 B1 W1 W2 W3 W4 W5 W6 W7 W8 W9T1 T4 B1B212 3 4 5 6 7 8 9 10 11 12 18 17 16 15 14 13 19 20 21 22 3x6 5x6 3x6 3x6 3x6 3x4 2x4 4x6 4x4 3x4 3x8 3x4 3x4 2x4 3x6 3x6 8-0-0 8-0-0 8-2-12 0-2-12 13-8-14 5-6-2 19-3-0 5-6-2 28-5-10 9-2-10 38-6-0 10-0-6 -1-6-0 1-6-0 4-6-4 4-6-4 8-2-12 3-8-8 13-8-14 5-6-2 19-3-0 5-6-2 25-4-12 6-1-12 31-6-8 6-1-12 38-6-0 6-11-8 40-0-0 1-6-0 0- 3 - 1 5 6- 8 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [17:0-1-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.57 0.64 0.53 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.20 -0.39 0.07 0.06 (loc) 11-13 11-13 11 11-13 l/defl >999 >919 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 174 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 3-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 5-2-7 oc bracing. WEBS 1 Row at midpt 8-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 18=2655/0-5-8 (min. 0-2-13), 11=1535/0-5-8 (min. 0-1-10) Max Horz18=-66(LC 10) Max Uplift18=-337(LC 12), 11=-98(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-19=-558/1099, 3-19=-553/1165, 3-4=-676/1615, 4-5=-666/1711, 5-6=-825/12, 6-20=-1385/71, 7-20=-1250/84, 7-21=-1312/91, 8-21=-1397/76, 8-9=-2657/128, 9-10=-2744/113, 10-22=-3212/184, 11-22=-3297/168 BOT CHORD 2-18=-1041/567, 17-18=-1570/709, 16-17=0/739, 15-16=0/739, 14-15=-12/2145, 13-14=-12/2145, 11-13=-103/3032 WEBS 3-18=-565/165, 5-18=-2320/432, 5-17=-472/2547, 6-17=-1091/278, 6-15=-204/695, 7-15=0/442, 8-15=-1129/140, 8-13=0/655, 10-13=-628/126 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=39ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-9 to 2-3-10, Interior(1) 2-3-10 to 19-3-0, Exterior(2) 19-3-0 to 23-1-3, Interior(1) 23-1-3 to 40-0-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11 except (jt=lb) 18=337. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss B1 Truss Type Common Qty 4 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:00 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-Z?FUldm7dX98jLzgR7ZOWhHl?34NM5H9CuBSuyzZJlr Scale = 1:44.0 T1 T2 B1 W3 W4 W5 W6 W1 W2 T3 B2 1 2 3 4 5 6 7 11 10 9 8 1213 14 15 16 17 3x4 5x6 3x4 3x4 3x4 3x4 3x4 2x4 4x4 3x6 8-2-15 8-2-15 16-2-5 7-11-7 24-11-8 8-9-3 5-8-8 5-8-8 11-10-4 6-1-12 18-0-0 6-1-12 24-11-8 6-11-8 26-5-8 1-6-0 4- 1 0 - 2 6- 8 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-12], [11:0-1-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.94 0.57 0.57 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.16 -0.29 0.06 0.05 (loc) 6-8 6-8 6 8 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 117 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-7 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-11 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 11=1248/0-5-8 (min. 0-1-8), 6=1412/0-5-8 (min. 0-1-8) Max Horz11=-146(LC 10) Max Uplift11=-71(LC 12), 6=-116(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-14=-1260/168, 3-14=-1346/153, 3-4=-2474/205, 4-5=-2561/190, 5-15=-2854/226, 6-15=-2942/209, 1-11=-258/77 BOT CHORD 11-16=0/869, 16-17=0/869, 10-17=0/869, 9-10=-69/1784, 8-9=-69/1784, 6-8=-145/2695 WEBS 2-10=-29/926, 3-10=-948/131, 3-8=-27/802, 5-8=-546/112, 2-11=-1256/168 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=25ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-8-8, Exterior(2) 5-8-8 to 8-8-8, Interior(1) 8-8-8 to 26-6-1 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11 except (jt=lb) 6=116. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss B2 Truss Type Common Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:02 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-VONE9IoN99Psze72ZYbsb6M5Vtlnq_gSfCgZyqzZJlp Scale = 1:43.2 T1 T2 B1 W3 W4 W5 W6 W1 W2 T3 B2 1 2 3 4 5 6 10 9 8 7 11 12 13 14 15 16 3x4 5x6 3x4 3x4 3x4 3x4 3x4 2x4 4x4 3x6 8-2-15 8-2-15 16-2-5 7-11-7 24-11-8 8-9-3 5-8-8 5-8-8 11-10-4 6-1-12 18-0-0 6-1-12 24-11-8 6-11-8 4- 1 0 - 2 6- 8 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-12], [10:0-1-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.94 0.64 0.58 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.18 -0.32 0.06 0.06 (loc) 6-7 6-7 6 6-7 l/defl >999 >909 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 115 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 3-0-1 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-10 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 10=1254/0-5-8 (min. 0-1-8), 6=1254/0-5-8 (min. 0-1-8) Max Horz10=-141(LC 10) Max Uplift10=-73(LC 12), 6=-69(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-13=-1267/174, 3-13=-1353/166, 3-4=-2516/241, 4-5=-2604/226, 5-14=-2906/269, 6-14=-2991/258, 1-10=-258/76 BOT CHORD 10-15=-7/873, 15-16=-7/873, 9-16=-7/873, 8-9=-101/1798, 7-8=-101/1798, 6-7=-210/2745 WEBS 2-9=-34/932, 3-9=-960/132, 3-7=-42/837, 5-7=-564/124, 2-10=-1262/169 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=25ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-8-8, Exterior(2) 5-8-8 to 8-8-8, Interior(1) 8-8-8 to 24-8-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 6. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss B3 Truss Type Hip Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:03 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-zaxdNeo?wSXjaoiF6F658JvHyG4RZQ_busP6UHzZJlo Scale = 1:42.8 T1 T2 T3 B1 W3 W4 W3 W5 W6 W7 W1 W2 T4 B2 1 2 3 4 5 6 11 10 9 8 7 12 13 14 15 4x6 5x6 2x4 3x4 3x8 3x4 3x4 3x4 5x6 4x4 3x6 5-2-8 5-2-8 6-2-8 1-0-0 15-2-2 8-11-10 24-11-8 9-9-6 5-2-8 5-2-8 6-2-8 1-0-0 12-2-4 5-11-12 18-2-0 5-11-12 24-11-8 6-9-8 4- 1 0 - 2 6- 5 - 4 6- 6 - 1 5 0- 3 - 1 5 6- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [1:0-1-8,0-2-0], [3:0-3-0,0-1-12], [5:0-3-0,0-3-0], [6:0-1-6,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.90 0.67 0.64 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.21 -0.40 0.06 0.07 (loc) 6-7 6-7 6 6-7 l/defl >999 >738 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 130 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 2-9-7 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-9 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 11=1262/0-5-8 (min. 0-1-8), 6=1262/Mechanical Max Horz11=-139(LC 10) Max Uplift11=-73(LC 12), 6=-69(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-12=-939/143, 12-13=-877/149, 2-13=-860/155, 2-3=-835/168, 3-14=-1037/163, 4-14=-1118/149, 4-5=-2487/226, 5-15=-2965/288, 6-15=-3048/278, 1-11=-1218/176 BOT CHORD 9-10=-13/970, 8-9=-114/1873, 7-8=-114/1873, 6-7=-228/2808 WEBS 2-10=-270/300, 3-10=-909/92, 3-9=-26/735, 4-9=-1101/140, 4-7=-6/711, 5-7=-664/138, 1-10=-136/1094 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=25ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-2-8, Exterior(2) 5-2-8 to 10-5-7, Interior(1) 10-5-7 to 24-10-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 6. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0404-20 Truss B4 Truss Type Hip Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:04 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-RnU?a_pdgmfaCyHRgzdKgXSRYgODIval7W9g1jzZJln Scale = 1:42.0 T1 T2 T3 B1 W3 W4 W3 W5 W6 W1 W2 T4 B2 1 2 3 4 5 6 11 10 9 8 7 12 13 14 15 5x10 MT20HS 4x8 M18SHS 3x4 2x4 4x4 3x4 3x8 3x4 2x4 3x4 3x6 2-2-8 2-2-8 9-2-8 7-0-0 16-8-2 7-5-10 24-11-8 8-3-6 2-2-8 2-2-8 9-2-8 7-0-0 16-8-2 7-5-10 24-11-8 8-3-6 4- 1 0 - 2 5- 5 - 4 5- 6 - 1 5 0- 3 - 1 5 5- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [2:0-5-0,0-1-12], [6:0-1-6,Edge], [9:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.90 0.76 0.56 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.24 -0.39 0.07 0.08 (loc) 6-7 6-7 6 6-7 l/defl >999 >752 n/a >999 L/d 360 240 n/a 240 PLATES MT20 MT20HS M18SHS Weight: 120 lb FT = 0% GRIP 220/195 165/146 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals, and 2-0-0 oc purlins (4-11-5 max.): 2-3. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 10-11. WEBS 1 Row at midpt 5-9 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 11=1262/0-5-8 (min. 0-1-8), 6=1262/Mechanical Max Horz11=-131(LC 10) Max Uplift11=-81(LC 8), 6=-69(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-493/114, 2-12=-1489/207, 12-13=-1489/207, 3-13=-1489/207, 3-14=-1560/195, 4-14=-1579/185, 4-5=-1668/178, 5-15=-2852/264, 6-15=-2955/250, 1-11=-1266/152 BOT CHORD 9-10=0/518, 8-9=-198/2701, 7-8=-198/2701, 6-7=-198/2701 WEBS 2-10=-1067/222, 2-9=-167/1214, 5-9=-1301/142, 5-7=0/304, 1-10=-166/1257 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=25ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-1-12 to 6-5-7, Interior(1) 6-5-7 to 9-2-8, Exterior(2) 9-2-8 to 13-5-7, Interior(1) 13-5-7 to 24-10-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Refer to girder(s) for truss to truss connections. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 6. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0404-20 Truss B5 Truss Type Half Hip Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:05 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-vz2NoKqFR4nRq6sdEg9ZDk_bn4lM1KhuLAuDZ9zZJlm Scale = 1:41.9 W1 T1 T2 B1 W2 W1 W2 W3 W4 W5 B2 1 2 3 4 5 10 9 8 7 6 11 12 13 14 3x4 3x4 4x6 3x6 3x4 3x8 2x4 3x8 3x4 2x4 6-3-0 6-3-0 12-2-8 5-11-8 18-2-2 5-11-10 24-11-8 6-9-6 6-3-0 6-3-0 12-2-8 5-11-8 18-2-2 5-11-10 24-11-8 6-9-6 4- 5 - 4 4- 6 - 1 5 0- 3 - 1 5 4- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [5:0-1-6,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 1.00 0.64 0.69 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.17 -0.27 0.08 0.06 (loc) 5-6 5-6 5 5-6 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 114 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 2-11-1 oc purlins, except end verticals, and 2-0-0 oc purlins (4-6-9 max.): 1-3. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-10 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 10=1262/0-5-8 (min. 0-1-8), 5=1262/Mechanical Max Horz10=-114(LC 10) Max Uplift10=-122(LC 8), 5=-70(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-12=-1928/236, 3-12=-1925/237, 3-13=-2028/233, 4-13=-2111/219, 4-14=-3018/287, 5-14=-3103/277 BOT CHORD 9-10=-90/1475, 8-9=-90/1475, 7-8=-90/1475, 6-7=-228/2856, 5-6=-228/2856 WEBS 2-10=-1710/202, 2-7=-98/545, 4-7=-995/121 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=25ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 12-2-8, Exterior(2) 12-2-8 to 16-5-7, Interior(1) 16-5-7 to 24-10-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5 except (jt=lb) 10=122. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0404-20 Truss B6GD Truss Type Half Hip Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:07 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-sMA7D0sWzh193P00L5B1I942EuTnVEfBpUNKd2zZJlk Scale = 1:41.9 W1 T1 T2 B1 W2 W1 W2 W1 W2 W3 W4 W5 B2 1 2 3 4 5 6 12 11 10 9 8 7 13 14 15 16 17 18 19 20 21 22 23 24 25 4x4 2x4 4x4 3x8 4x6 3x8 2x4 3x4 3x4 3x8 3x4 2x4 5-2-9 5-2-9 10-3-7 5-0-13 15-2-8 4-11-1 19-5-2 4-2-10 24-11-8 5-6-6 5-2-9 5-2-9 10-3-7 5-0-13 15-2-8 4-11-1 19-5-2 4-2-10 24-11-8 5-6-6 3- 5 - 4 3- 6 - 1 5 0- 3 - 1 5 3- 5 - 4 4.00 12 Plate Offsets (X,Y)-- [1:0-2-0,0-0-8], [6:0-9-6,0-0-12] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.56 0.52 0.66 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.19 -0.27 0.06 0.07 (loc) 8-9 8-9 6 8-9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 264 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 5-0-2 oc purlins, except end verticals, and 2-0-0 oc purlins (5-11-14 max.): 1-4. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 12=2911/0-5-8 (min. 0-1-9), 6=2785/Mechanical Max Horz12=-84(LC 6) Max Uplift12=-344(LC 4), 6=-252(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-12=-437/100, 2-3=-5547/544, 3-13=-5344/517, 4-13=-5341/517, 4-5=-5723/538, 5-6=-7100/647 BOT CHORD 12-14=-339/3793, 14-15=-339/3793, 11-15=-339/3793, 11-16=-339/3793, 16-17=-339/3793, 10-17=-339/3793, 10-18=-339/3793, 9-18=-339/3793, 9-19=-496/5547, 19-20=-496/5547, 8-20=-496/5547, 8-21=-588/6678, 21-22=-588/6678, 7-22=-588/6678, 7-23=-588/6678, 23-24=-588/6678, 24-25=-588/6678, 6-25=-588/6678 WEBS 2-12=-4286/450, 2-11=-36/720, 2-9=-187/2050, 3-9=-372/86, 3-8=-501/80, 4-8=-113/1386, 5-8=-1391/148, 5-7=-29/622 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-8-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=25ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Refer to girder(s) for truss to truss connections. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 12=344, 6=252. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 11) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. Continued on page 2 Job B0404-20 Truss B6GD Truss Type Half Hip Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:07 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-sMA7D0sWzh193P00L5B1I942EuTnVEfBpUNKd2zZJlk NOTES- 12) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 216 lb down and 69 lb up at 0-1-12 on top chord, and 246 lb down and 37 lb up at 1-10-12, 246 lb down and 37 lb up at 3-10-12, 246 lb down and 37 lb up at 5-10-12, 246 lb down and 37 lb up at 7-10-12, 246 lb down and 37 lb up at 9-10-12, 246 lb down and 37 lb up at 11-10-12, 246 lb down and 37 lb up at 13-10-12, 246 lb down and 37 lb up at 15-10-12, 246 lb down and 37 lb up at 17-10-12, 246 lb down and 37 lb up at 19-10-12, and 246 lb down and 37 lb up at 21-10-12, and 246 lb down and 37 lb up at 23-10-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-86, 4-6=-86, 6-12=-16 Concentrated Loads (lb) Vert: 1=-216(F) 14=-246(F) 15=-246(F) 16=-246(F) 17=-246(F) 18=-246(F) 19=-246(F) 20=-246(F) 21=-246(F) 22=-246(F) 23=-246(F) 24=-246(F) 25=-246(F) Job B0404-20 Truss C1GD Truss Type Hip Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:08 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-KYkWQMs8k?90hZaCvoiGrNcI8HswEnpK187tAUzZJlj Scale = 1:41.8 T1 T2 T1 B1 W1 W2 W3 W4 W3 W2 W1 B21 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 4x8 4x4 3x6 4x6 3x4 2x4 3x4 3x8 3x4 2x4 3x6 5-6-6 5-6-6 9-9-0 4-2-10 13-3-0 3-6-0 17-5-10 4-2-10 23-0-0 5-6-6 -1-6-0 1-6-0 5-6-6 5-6-6 9-9-0 4-2-10 13-3-0 3-6-0 17-5-10 4-2-10 23-0-0 5-6-6 24-6-0 1-6-0 0- 3 - 1 5 3- 6 - 1 5 0- 3 - 1 5 3- 6 - 1 5 4.00 12 Plate Offsets (X,Y)-- [4:0-5-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.23 0.33 0.28 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.16 -0.23 0.05 0.05 (loc) 10-11 10-11 7 11 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 230 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 5-10-4 oc purlins, except 2-0-0 oc purlins (6-0-0 max.): 4-5. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 2=2265/0-5-8 (min. 0-1-8), 7=2265/0-5-8 (min. 0-1-8) Max Horz2=31(LC 24) Max Uplift2=-218(LC 8), 7=-218(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-5657/459, 3-4=-5146/470, 4-14=-4889/460, 14-15=-4889/460, 5-15=-4889/460, 5-6=-5151/470, 6-7=-5655/459 BOT CHORD 2-13=-387/5286, 12-13=-387/5286, 11-12=-387/5286, 11-16=-369/4883, 10-16=-369/4883, 9-10=-387/5284, 7-9=-387/5284 WEBS 3-11=-546/96, 4-11=-95/1280, 5-10=-95/1284, 6-10=-547/100 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 2=218, 7=218. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 593 lb down and 77 lb up at 9-9-0, 246 lb down and 37 lb up at 10-0-12, 246 lb down and 37 lb up at 11-6-0, and 246 lb down and 37 lb up at 12-11-4, and 593 lb down and 77 lb up at 13-3-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard Continued on page 2 Job B0404-20 Truss C1GD Truss Type Hip Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:08 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-KYkWQMs8k?90hZaCvoiGrNcI8HswEnpK187tAUzZJlj LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-86, 4-5=-86, 5-8=-86, 2-7=-16 Concentrated Loads (lb) Vert: 11=-840(F) 10=-840(F) 16=-246(F) Job B0404-20 Truss C2 Truss Type Common Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:09 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-okIuditmVIHtJj9PTWDVNa9RehApzEmUGosQiwzZJli Scale = 1:41.1 T1 T1 B1 W2 W1 W2 W1 B21 2 3 4 5 6 7 9 8 10 11 12 13 4x6 3x4 5x6 3x4 2x4 2x4 3x4 7-11-4 7-11-4 15-0-12 7-1-8 23-0-0 7-11-4 -1-6-0 1-6-0 6-1-14 6-1-14 11-6-0 5-4-2 16-10-2 5-4-2 23-0-0 6-1-14 24-6-0 1-6-0 0- 3 - 1 5 4- 1 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [2:0-1-14,Edge], [6:0-1-14,Edge], [9:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.37 0.48 0.30 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.16 -0.25 0.07 0.05 (loc) 8-9 8-9 6 8-9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 89 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-9 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=1302/0-5-8 (min. 0-1-8), 6=1302/0-5-8 (min. 0-1-8) Max Horz2=36(LC 11) Max Uplift2=-111(LC 12), 6=-111(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-10=-2672/226, 3-10=-2593/241, 3-11=-2315/204, 4-11=-2241/212, 4-12=-2241/212, 5-12=-2315/204, 5-13=-2593/241, 6-13=-2672/226 BOT CHORD 2-9=-174/2447, 8-9=-96/1688, 6-8=-185/2447 WEBS 4-8=-24/684, 5-8=-511/108, 4-9=-24/684, 3-9=-511/108 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-9 to 1-5-7, Interior(1) 1-5-7 to 11-6-0, Exterior(2) 11-6-0 to 14-6-0, Interior(1) 14-6-0 to 24-6-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 2=111, 6=111. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss C2GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:11 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-k7Qe2Nv01wXbY1JnaxFzT?EfGVkmR25nk5LXnpzZJlg Scale = 1:38.6 T1 T1 B1 W5 W4 W3 W2 W1 W4W3 W2W1 B2 1 2 3 4 5 6 7 13 12 11 10 9 8 14 15 16 17 18 19 20 21 22 5x8 M18SHS 5x6 5x8 M18SHS5x10 M18SHS 7x8 4x4 6x8 3x4 3x6 4x4 6x8 3x4 3x6 4-8-8 4-8-8 8-1-4 3-4-12 11-6-0 3-4-12 14-10-12 3-4-12 18-3-8 3-4-12 23-0-0 4-8-8 4-8-8 4-8-8 8-1-4 3-4-12 11-6-0 3-4-12 14-10-12 3-4-12 18-3-8 3-4-12 23-0-0 4-8-8 0- 3 - 1 5 4- 1 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [1:0-4-0,0-2-10], [3:0-1-4,0-2-0], [5:0-1-4,0-2-0], [7:0-4-0,0-2-10], [8:0-4-8,0-1-8], [9:0-3-8,0-4-8], [10:0-4-0,0-4-4], [11:0-3-8,0-4-8], [13:0-4-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.87 0.90 0.70 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.37 -0.54 0.13 0.12 (loc) 9-10 9-10 7 9-10 l/defl >723 >502 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 231 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 2400F 2.0E BOT CHORD 2x6 DF 2400F 2.0E WEBS 2x4 DF Stud/Std *Except* W5: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 2-8-6 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 1=6791/0-5-8 (min. 0-3-6), 7=7453/0-5-8 (min. 0-3-11) Max Horz1=31(LC 24) Max Uplift1=-427(LC 8), 7=-473(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-17805/1129, 2-3=-14880/962, 3-4=-11647/772, 4-5=-11647/772, 5-6=-14890/966, 6-7=-17997/1149 BOT CHORD 1-14=-1046/16817, 14-15=-1046/16817, 13-15=-1046/16817, 13-16=-1046/16817, 12-16=-1046/16817, 11-12=-1046/16817, 11-17=-861/14090, 10-17=-861/14090, 10-18=-865/14099, 18-19=-865/14099, 9-19=-865/14099, 9-20=-1066/17003, 8-20=-1066/17003, 8-21=-1066/17003, 21-22=-1066/17003, 7-22=-1066/17003 WEBS 4-10=-430/6946, 5-10=-3914/264, 5-9=-179/3156, 6-9=-3207/219, 6-8=-99/2048, 3-10=-3903/259, 3-11=-175/3143, 2-11=-3013/203, 2-13=-88/1925 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-4-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-2-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) All plates are MT20 plates unless otherwise indicated. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=427, 7=473. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. Continued on page 2 Job B0404-20 Truss C2GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:11 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-k7Qe2Nv01wXbY1JnaxFzT?EfGVkmR25nk5LXnpzZJlg NOTES- 10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1076 lb down and 76 lb up at 2-0-12, 1076 lb down and 76 lb up at 4-0-12 , 1076 lb down and 76 lb up at 6-0-12, 1076 lb down and 76 lb up at 8-0-12, 1091 lb down and 79 lb up at 10-0-12, 1091 lb down and 79 lb up at 12-0-12, 1091 lb down and 79 lb up at 14-0-12, 1091 lb down and 79 lb up at 16-0-12, 1091 lb down and 79 lb up at 18-0-12, and 1091 lb down and 79 lb up at 20-0-12, and 1093 lb down and 76 lb up at 22-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-86, 4-7=-86, 1-7=-16 Concentrated Loads (lb) Vert: 8=-1091(B) 11=-1076(B) 14=-1076(B) 15=-1076(B) 16=-1076(B) 17=-1091(B) 18=-1091(B) 19=-1091(B) 20=-1091(B) 21=-1091(B) 22=-1093(B) Job B0404-20 Truss CJ-01 Truss Type Diagonal Hip Girder Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:12 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-CJz0GjveoDgRABuz8enC?DnttvAlAY5wyl55JFzZJlf Scale = 1:22.9 T1 W3 B1 W1 W2 HW1 1 2 3 4 6 5 7 8 9 10 11 12 13 14 15 16 17 18 5x6 4x4 4x6 3x8 3x4 2x4 0-0-9 0-0-9 5-2-6 5-1-13 10-7-9 5-5-3 -2-8-7 2-8-7 5-2-6 5-2-6 10-7-9 5-5-3 0- 6 - 1 5 3- 6 - 5 3.33 12 Plate Offsets (X,Y)-- [2:0-3-1,0-7-10], [2:0-0-0,0-1-14], [4:0-3-3,Edge], [5:0-1-12,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.69 0.53 0.46 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.03 -0.06 0.01 -0.02 (loc) 5-6 5-6 5 2-6 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 48 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEDGE Left: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 5=622/Mechanical, 2=843/0-8-13 (min. 0-1-8) Max Horz2=93(LC 23) Max Uplift5=-48(LC 5), 2=-149(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-7=-1006/33, 7-8=-988/26, 8-9=-919/33, 3-9=-894/36, 4-5=-279/57 BOT CHORD 2-13=-85/891, 13-14=-85/891, 14-15=-85/891, 6-15=-85/891, 6-16=-85/891, 16-17=-85/891, 17-18=-85/891, 5-18=-85/891 WEBS 3-5=-819/60 NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5 except (jt=lb) 2=149. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 55 lb down and 222 lb up at 1-5-5, 21 lb down and 28 lb up at 3-6-6, 44 lb down and 12 lb up at 3-10-2, 46 lb down and 32 lb up at 6-3-0, and 101 lb down and 74 lb up at 7-1-10, and 64 lb down and 56 lb up at 8-7-13 on top chord, and at 1-5-5, 12 lb down at 3-6-6, 5 lb down at 3-10-2, 15 lb down at 6-3-0, and 51 lb down at 7-1-10, and 38 lb down at 8-7-13 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-86, 2-5=-16 Continued on page 2 Job B0404-20 Truss CJ-01 Truss Type Diagonal Hip Girder Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:12 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-CJz0GjveoDgRABuz8enC?DnttvAlAY5wyl55JFzZJlf LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 7=41(F) 11=-101(B) 12=-60(F) 16=-6(F) 17=-23(B) 18=-17(F) Job B0404-20 Truss D1G Truss Type Common Supported Gable Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:13 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-gVXOT3wHZXoInKTAiMIRYQKAAId1v503BPqerhzZJle Scale = 1:41.3 T1 T1 B1 ST6 ST5 ST4 ST3 ST2ST1 ST5 ST4 ST3 ST2 ST1 HW1 HW1B21 2 3 4 5 6 7 8 9 10 11 12 13 14 15 27 26 25 24 23 22 21 20 19 18 17 16 28 29 30 31 4x4 4x4 3x8 3x4 4x4 3x8 22-0-0 22-0-0 -1-6-0 1-6-0 11-0-0 11-0-0 22-0-0 11-0-0 23-6-0 1-6-0 0- 6 - 1 5 6- 0 - 1 5 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-12], [2:0-3-0,Edge], [14:0-0-0,0-1-12], [14:0-3-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.14 0.08 0.09 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.02 0.00 (loc) 15 15 14 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 111 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 22-0-0. (lb) - Max Horz2=-81(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 2, 22, 23, 25, 26, 27, 20, 19, 18, 17, 16, 14 Max Grav All reactions 250 lb or less at joint(s) 21, 22, 23, 25, 26, 27, 20, 19, 18, 17, 16 except 2=299(LC 1), 14=299(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=2ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Corner(3) -1-6-13 to 1-5-3, Exterior(2) 1-5-3 to 11-0-0, Corner(3) 11-0-0 to 14-0-0, Exterior(2) 14-0-0 to 23-6-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 22, 23, 25, 26, 27, 20, 19, 18, 17, 16, 14. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss D2 Truss Type Common Qty 5 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:14 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-9i5nhPxvKrw9PU2MG3pg4esHQivqeWvDQ3aBN8zZJld Scale = 1:39.2 T1 T2 B1 W2 W1 W2 W1 HW1 HW1B21 2 3 4 5 6 8 7 9 10 11 12 13 14 4x6 4x6 5x6 3x4 2x4 2x4 4x6 7-4-5 7-4-5 14-7-11 7-3-6 22-0-0 7-4-5 -1-6-0 1-6-0 5-6-8 5-6-8 11-0-0 5-5-8 16-5-8 5-5-8 22-0-0 5-6-8 0- 6 - 1 5 6- 0 - 1 5 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-0-4,0-0-8], [2:0-0-8,0-5-10], [2:0-3-0,0-0-7], [6:0-3-0,0-0-7], [6:0-0-8,0-5-10], [6:0-0-4,0-0-8], [8:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.43 0.36 0.24 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.11 -0.15 0.04 0.03 (loc) 7-8 7-8 6 6-7 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 94 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 4-7-3 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=1259/0-5-8 (min. 0-1-8), 6=1092/0-5-8 (min. 0-1-8) Max Horz2=81(LC 11) Max Uplift2=-110(LC 12), 6=-60(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-9=-1805/155, 3-9=-1701/174, 3-10=-1557/176, 4-10=-1452/187, 4-11=-1474/203, 5-11=-1581/184, 5-12=-1701/189, 6-12=-1830/178 BOT CHORD 2-8=-105/1475, 8-13=-32/1047, 13-14=-32/1047, 7-14=-32/1047, 6-7=-108/1504 WEBS 4-7=-38/554, 5-7=-393/107, 4-8=-31/519, 3-8=-376/105 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-13 to 1-5-3, Interior(1) 1-5-3 to 11-0-0, Exterior(2) 11-0-0 to 14-0-0, Interior(1) 14-0-0 to 21-9-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6 except (jt=lb) 2=110. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss D3 Truss Type Common Qty 7 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:15 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-duf9ulyX58201edYpmKvdrPTS6EkNxzMejJlwazZJlc Scale = 1:36.3 T1 T1 B1 W2 W1 W2 W1 HW1 HW1B2 1 2 3 4 5 7 6 8 9 10 11 12 13 4x6 5x6 3x4 2x4 2x4 4x6 4x6 7-4-5 7-4-5 14-7-11 7-3-6 22-0-0 7-4-5 5-6-8 5-6-8 11-0-0 5-5-8 16-5-8 5-5-8 22-0-0 5-6-8 0- 6 - 1 5 6- 0 - 1 5 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [1:0-0-4,0-0-8], [1:0-0-8,0-5-10], [1:0-3-0,0-0-7], [5:0-3-0,0-0-7], [5:0-0-8,0-5-10], [5:0-0-4,0-0-8], [7:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.35 0.38 0.26 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.10 -0.15 0.04 0.03 (loc) 6-7 6-7 5 5-6 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 92 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 4-5-14 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=1107/0-5-8 (min. 0-1-8), 5=1107/Mechanical Max Horz1=-75(LC 10) Max Uplift1=-63(LC 12), 5=-63(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-8=-1859/181, 2-8=-1730/193, 2-9=-1610/188, 3-9=-1502/206, 3-10=-1523/208, 4-10=-1631/189, 4-11=-1761/195, 5-11=-1886/183 BOT CHORD 1-7=-113/1530, 7-12=-37/1075, 12-13=-37/1075, 6-13=-37/1075, 5-6=-117/1564 WEBS 3-6=-39/581, 4-6=-418/111, 3-7=-37/552, 2-7=-393/108 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-2-12 to 3-2-12, Interior(1) 3-2-12 to 11-0-0, Exterior(2) 11-0-0 to 14-0-0, Interior(1) 14-0-0 to 21-11-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss E1G Truss Type Common Supported Gable Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:16 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-54DX55y9sSAteoClNUr8A3xgQWfH6SGWtN3IS0zZJlb Scale = 1:33.3 T1 T1 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 HW1 HW1B21 2 3 4 5 6 7 8 9 10 11 19 18 17 16 15 14 13 12 20 21 22 23 4x4 3x4 3x8 3x4 3x4 3x8 17-3-0 17-3-0 -1-6-0 1-6-0 8-7-8 8-7-8 17-3-0 8-7-8 18-9-0 1-6-0 0- 6 - 1 5 4- 1 0 - 1 1 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-4], [2:0-3-0,Edge], [10:Edge,0-1-4], [10:0-3-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.14 0.04 0.06 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 0.00 (loc) 11 11 10 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 81 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 17-3-0. (lb) - Max Horz2=-66(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 2, 16, 17, 19, 14, 13, 12, 10 Max Grav All reactions 250 lb or less at joint(s) 15, 16, 17, 19, 14, 13, 12 except 2=307(LC 1), 10=307(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=2ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Corner(3) -1-6-13 to 1-5-3, Exterior(2) 1-5-3 to 8-7-8, Corner(3) 8-7-8 to 11-7-8, Exterior(2) 11-7-8 to 18-9-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 16, 17, 19, 14, 13, 12, 10. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss E2 Truss Type Common Qty 3 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:17 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-ZHnvJRzndmIkGymxxBMNiGUp4wwVrtef61os_TzZJla Scale = 1:33.1 T1 T1 B1 W2 W1W1 HW1 HW1B11 2 3 4 5 6 7 8 9 10 11 12 4x4 4x4 3x8 5x8 2x4 2x4 4x4 3x8 8-7-8 8-7-8 17-3-0 8-7-8 -1-6-0 1-6-0 4-4-4 4-4-4 8-7-8 4-3-4 12-10-12 4-3-4 17-3-0 4-4-4 18-9-0 1-6-0 0- 6 - 1 5 4- 1 0 - 1 1 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-3-0,Edge], [2:0-0-0,0-1-8], [4:0-2-0,0-2-4], [6:0-3-0,Edge], [6:Edge,0-1-8], [8:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.28 0.37 0.18 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.08 -0.15 0.03 0.01 (loc) 2-8 2-8 6 8 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 75 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-3 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=1011/0-5-8 (min. 0-1-8), 6=1011/0-5-8 (min. 0-1-8) Max Horz2=-66(LC 10) Max Uplift2=-94(LC 12), 6=-94(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-9=-1318/123, 3-9=-1236/139, 3-10=-986/102, 4-10=-905/113, 4-11=-905/113, 5-11=-986/102, 5-12=-1236/138, 6-12=-1318/123 BOT CHORD 2-8=-62/1061, 6-8=-71/1061 WEBS 4-8=0/411, 5-8=-337/92, 3-8=-337/92 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-13 to 1-5-3, Interior(1) 1-5-3 to 8-7-8, Exterior(2) 8-7-8 to 11-7-8, Interior(1) 11-7-8 to 18-9-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 6. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss E3GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:19 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-1TLHWn_PN3Qbu6L7VvucFU1veJ9na9TpLhYPWuzZJlZ Scale: 3/8"=1' T1 T2 B1 W5 W4 W3 W2 W1 W4W3 W2W1 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 16 17 4x6 4x8 M18SHS4x8 M18SHS 8x10 4x4 7x8 3x4 3x6 4x4 7x8 3x4 7x8 3-1-13 3-1-13 5-10-10 2-8-14 8-7-8 2-8-14 11-4-6 2-8-14 14-1-3 2-8-14 17-3-0 3-1-13 -1-6-0 1-6-0 3-1-13 3-1-13 5-10-10 2-8-14 8-7-8 2-8-14 11-4-6 2-8-14 14-1-3 2-8-14 17-3-0 3-1-13 0- 6 - 1 5 4- 1 0 - 1 1 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-1-0,0-1-12], [4:0-0-8,0-1-8], [6:0-0-8,0-1-8], [8:0-1-0,0-1-12], [9:0-4-8,0-1-8], [10:0-3-8,0-4-12], [11:0-5-0,0-4-8], [12:0-3-8,0-4-12], [13:0-4-0,0-5-4] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.61 0.81 0.85 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.18 -0.26 0.08 0.06 (loc) 11-12 11-12 8 11-12 l/defl >999 >790 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 201 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W5: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 8=8169/0-5-8 (min. 0-4-6), 2=6634/0-5-8 (min. 0-3-9) Max Horz2=65(LC 7) Max Uplift8=-519(LC 8), 2=-532(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-11834/870, 3-4=-12355/946, 4-5=-9625/719, 5-6=-9625/719, 6-7=-11938/836, 7-8=-13505/900 BOT CHORD 2-13=-717/10064, 12-13=-717/10064, 12-14=-786/11008, 11-14=-786/11008, 11-15=-688/10637, 10-15=-688/10637, 10-16=-745/11530, 9-16=-745/11530, 9-17=-745/11530, 8-17=-745/11530 WEBS 5-11=-587/8161, 6-11=-3107/201, 6-10=-173/3221, 7-10=-1093/68, 7-9=-86/1946, 4-11=-3673/351, 4-12=-334/3843, 3-12=-151/1211, 3-13=-265/56 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-5-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc, Except member 6-10 2x4 - 2 rows staggered at 0-3-0 oc, member 7-9 2x4 - 1 row at 0-4-0 oc, member 4-12 2x4 - 2 rows staggered at 0-3-0 oc, member 3-13 2x4 - 1 row at 0-4-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) All plates are MT20 plates unless otherwise indicated. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 8=519, 2=532. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 4346 lb down and 411 lb up at 6-1-8, 1941 lb down and 127 lb up at 8-0-12, 1941 lb down and 127 lb up at 10-0-12, 1941 lb down and 127 lb up at 12-0-12, and 1396 lb down and 95 lb up at 14-0-12, and 1371 lb down and 67 lb up at 16-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. Continued on page 2 Job B0404-20 Truss E3GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:19 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-Vfugk6?18NYSVFwK2cPrnhZ4OjV0JciyZLHy3LzZJlY LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-5=-86, 5-8=-86, 2-8=-16 Concentrated Loads (lb) Vert: 9=-1396(F) 12=-4346(F) 14=-1941(F) 15=-1941(F) 16=-1941(F) 17=-1371(F) Job B0404-20 Truss F1G Truss Type Common Supported Gable Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:20 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-zsS2xS0gvhgJ7PVWcKw4Kv6MP70k2GS5o?1WbnzZJlX Scale = 1:29.2 T1 T1 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 HW1 1 2 3 4 5 6 7 8 9 10 11 18 17 16 15 14 13 12 19 20 4x4 4x4 3x8 4x4 3x8 14-6-0 14-6-0 -1-6-0 1-6-0 7-3-0 7-3-0 14-6-0 7-3-0 16-0-0 1-6-0 0- 6 - 1 5 4- 2 - 7 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-12], [2:0-3-0,Edge], [10:0-0-0,0-1-12], [10:0-3-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.14 0.08 0.05 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.02 0.00 (loc) 11 11 10 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 66 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 14-6-0. (lb) - Max Horz2=-57(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 2, 10, 16, 17, 18, 14, 13, 12 Max Grav All reactions 250 lb or less at joint(s) 15, 16, 17, 18, 14, 13, 12 except 2=292(LC 1), 10=292(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=2ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Corner(3) -1-6-13 to 1-3-0, Exterior(2) 1-3-0 to 7-3-0, Corner(3) 7-3-0 to 10-3-0, Exterior(2) 10-3-0 to 16-0-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 10, 16, 17, 18, 14, 13, 12. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss F2GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:21 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-R20Q9o0Ig_oAlZ4iA1RJt6fRAX9wnVvF1fm37EzZJlW Scale = 1:27.4 T1 T2 B1 W3 W2 W1 W3 W2W1 HW1HW1 1 2 3 4 5 6 10 9 8 711 12 13 5x8 4x12 4x12 10x10 3x4 3x6 10x10 3x4 3x6 3-10-0 3-10-0 6-1-8 2-3-8 8-4-8 2-3-0 10-8-0 2-3-8 14-6-0 3-10-0 -1-6-0 1-6-0 3-10-0 3-10-0 7-3-0 3-5-0 10-8-0 3-5-0 14-6-0 3-10-0 0- 6 - 1 5 4- 2 - 7 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-0-4,0-0-0], [3:0-1-8,0-1-8], [5:0-1-8,0-1-8], [6:0-0-4,0-0-0], [7:0-4-8,0-1-8], [10:0-4-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.53 0.91 0.93 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.12 -0.17 0.05 0.04 (loc) 8-9 8-9 6 9 l/defl >999 >972 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 158 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 3-9-1 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 6=6556/0-5-8 (min. 0-3-8), 2=5072/0-5-8 (min. 0-2-11) Max Horz2=56(LC 7) Max Uplift6=-451(LC 8), 2=-423(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-9156/693, 3-4=-9292/744, 4-5=-9229/704, 5-6=-11358/802 BOT CHORD 2-10=-566/7825, 9-10=-566/7825, 9-11=-489/7095, 8-11=-489/7095, 8-12=-663/9766, 7-12=-663/9766, 7-13=-663/9766, 6-13=-663/9766 WEBS 4-8=-244/4014, 5-8=-2126/142, 5-7=-136/2726, 4-9=-370/4220, 3-9=-206/803 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-2-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 6=451, 2=423. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 4218 lb down and 398 lb up at 6-1-8 , 1941 lb down and 127 lb up at 8-0-12, and 1941 lb down and 127 lb up at 10-0-12, and 1941 lb down and 127 lb up at 12-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard Continued on page 2 Job B0404-20 Truss F2GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:21 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-R20Q9o0Ig_oAlZ4iA1RJt6fRAX9wnVvF1fm37EzZJlW LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-86, 4-6=-86, 2-6=-16 Concentrated Loads (lb) Vert: 9=-4218(B) 11=-1941(B) 12=-1941(B) 13=-1941(B) Job B0404-20 Truss G1G Truss Type Common Supported Gable Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:22 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-wEaoM81wRIw1MjfuklyYPKBivxjeWA2OFJWdfgzZJlV Scale = 1:26.8 T1 T1 B1 ST3 ST2 ST1 ST2 ST1 HW1 HW1 1 2 3 4 5 6 7 8 9 14 13 12 11 10 15 16 17 18 4x4 3x4 3x8 3x4 3x8 13-0-0 13-0-0 -1-6-0 1-6-0 6-6-0 6-6-0 13-0-0 6-6-0 14-6-0 1-6-0 0- 6 - 1 5 3- 9 - 1 5 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-4], [2:0-3-0,Edge], [8:0-0-0,0-1-4], [8:0-3-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.14 0.05 0.04 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.02 0.00 (loc) 9 9 8 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 58 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 13-0-0. (lb) - Max Horz2=-52(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 2, 8, 13, 14, 11, 10 Max Grav All reactions 250 lb or less at joint(s) 12, 13, 14, 11, 10 except 2=304(LC 1), 8=304(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=2ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Corner(3) -1-6-13 to 1-5-3, Exterior(2) 1-5-3 to 6-6-0, Corner(3) 6-6-0 to 9-6-0, Exterior(2) 9-6-0 to 14-6-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 8, 13, 14, 11, 10. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss G2 Truss Type Common Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:23 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-OR8AZU2YCc2u_tE5HSTnyXkpVK_PFcJYUzFAC6zZJlU Scale = 1:26.8 T1 T1 B1 W1 HW1 HW1 1 2 3 4 5 6 7 8 9 10 4x6 4x4 3x8 4x4 3x8 2x4 6-6-0 6-6-0 13-0-0 6-6-0 -1-6-0 1-6-0 6-6-0 6-6-0 13-0-0 6-6-0 14-6-0 1-6-0 0- 6 - 1 5 3- 9 - 1 5 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-3-0,Edge], [2:0-0-0,0-1-12], [3:0-3-0,0-2-4], [4:Edge,0-1-12], [4:0-3-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.41 0.27 0.11 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.05 -0.07 0.01 0.02 (loc) 4-6 2-6 4 4-6 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 48 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std , Right: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=794/0-5-8 (min. 0-1-8), 4=794/0-5-8 (min. 0-1-8) Max Horz2=52(LC 11) Max Uplift2=-82(LC 12), 4=-82(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-7=-865/82, 7-8=-743/92, 3-8=-727/106, 3-9=-727/106, 9-10=-743/92, 4-10=-865/82 BOT CHORD 2-6=-9/648, 4-6=-9/648 WEBS 3-6=0/260 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-13 to 1-5-3, Interior(1) 1-5-3 to 6-6-0, Exterior(2) 6-6-0 to 9-6-0, Interior(1) 9-6-0 to 14-6-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 4. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss G3GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:24 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-sdiZnq3AzvAkc1pHr9_0UlH0RkGh_sXhjd?jkZzZJlT Scale = 1:25.0 T1 T2 B1 W3 W4 W1W2W11 2 3 4 5 6 9 8 710 11 12 3x6 4x4 3x4 7x8 3x4 2x4 3x4 3x6 3-5-8 3-5-8 6-10-8 3-5-0 9-6-8 2-8-0 13-0-0 3-5-8 3-5-8 3-5-8 6-6-0 3-0-8 9-6-8 3-0-8 13-0-0 3-5-8 14-6-0 1-6-0 0- 6 - 1 5 3- 9 - 1 5 0- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-1-12,0-1-8], [8:0-4-0,0-4-12], [9:0-4-4,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.27 0.52 0.94 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.08 -0.11 0.03 0.02 (loc) 8-9 8-9 5 8-9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 134 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 5-1-12 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 1=4858/0-5-8 (min. 0-2-9), 5=3086/0-5-8 (min. 0-1-10) Max Horz1=-51(LC 6) Max Uplift1=-336(LC 8), 5=-275(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-7143/520, 2-3=-4865/406, 3-4=-5419/448, 4-5=-5222/396 BOT CHORD 1-10=-399/6102, 10-11=-399/6102, 9-11=-399/6102, 9-12=-399/6102, 8-12=-399/6102, 7-8=-290/4417, 5-7=-290/4417 WEBS 3-8=-331/4253, 4-8=-177/654, 4-7=-280/57, 2-8=-2070/139, 2-9=-107/2205 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-5-0 oc. Webs connected as follows: 2x4 - 1 row at 0-3-0 oc, Except member 8-4 2x4 - 1 row at 0-9-0 oc, member 4-7 2x4 - 1 row at 0-9-0 oc, member 8-2 2x4 - 1 row at 0-9-0 oc, member 2-9 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=336, 5=275. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1249 lb down and 83 lb up at 0-11-4 , 1246 lb down and 85 lb up at 2-11-4, and 1246 lb down and 86 lb up at 4-11-4, and 2769 lb down and 268 lb up at 6-10-8 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-86, 3-6=-86, 1-5=-16 Continued on page 2 Job B0404-20 Truss G3GD Truss Type Common Girder Qty 1 Ply 2 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:24 2020 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-sdiZnq3AzvAkc1pHr9_0UlH0RkGh_sXhjd?jkZzZJlT LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 8=-2769(F) 10=-1249(F) 11=-1246(F) 12=-1246(F) Job B0404-20 Truss J01 Truss Type Jack-Closed Qty 34 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:25 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-KpGx_A3okDIbDAOTPtWF1yp8I8hEjXRqyHkHG?zZJlS Scale = 1:22.9 T1 W1 B1 HW1 1 2 3 4 5 2x4 2x4 3x4 3x6 6-0-0 6-0-0 -1-6-0 1-6-0 6-0-0 6-0-0 0- 6 - 1 5 3- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-4], [2:0-1-8,0-4-2] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.45 0.25 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.05 -0.09 0.00 0.00 (loc) 2-4 2-4 4 2 l/defl >999 >714 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 24 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std WEDGE Left: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 4=262/Mechanical, 2=466/0-5-8 (min. 0-1-8) Max Horz2=93(LC 9) Max Uplift4=-21(LC 9), 2=-66(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-13 to 1-5-3, Interior(1) 1-5-3 to 5-10-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss J02 Truss Type Jack-Open Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:26 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-o0qJCW4QVXQSrKzgza1UaAMONY37S_h_AxUqoRzZJlR Scale = 1:10.4 T1 B1 1 2 5 6 3 4 2x4 3-8-12 3-8-12 -1-6-0 1-6-0 3-8-12 3-8-12 0- 3 - 1 5 1- 6 - 1 4 1- 2 - 1 1 1- 6 - 1 4 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.18 0.08 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.01 -0.01 -0.00 0.00 (loc) 2-4 2-4 3 2 l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 13 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-12 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=108/Mechanical, 2=367/0-5-8 (min. 0-1-8), 4=28/Mechanical Max Horz2=45(LC 12) Max Uplift3=-17(LC 12), 2=-63(LC 12) Max Grav3=108(LC 1), 2=367(LC 1), 4=62(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-9 to 1-5-7, Interior(1) 1-5-7 to 3-8-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss J03 Truss Type Jack-Open Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:27 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-GCNhPs53GqYJTUXsWIYj6NvSzyMwBRx7PbDNLtzZJlQ Scale = 1:15.7 T1 B1 1 2 5 6 3 4 2x4 6-8-12 6-8-12 -1-6-0 1-6-0 6-8-12 6-8-12 0- 3 - 1 5 2- 6 - 1 4 2- 2 - 1 1 2- 6 - 1 4 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.63 0.30 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.09 -0.16 -0.00 0.00 (loc) 2-4 2-4 3 2 l/defl >856 >476 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 21 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=256/Mechanical, 2=502/0-5-8 (min. 0-1-8), 4=52/Mechanical Max Horz2=67(LC 12) Max Uplift3=-48(LC 12), 2=-62(LC 12) Max Grav3=256(LC 1), 2=502(LC 1), 4=116(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-9 to 1-5-7, Interior(1) 1-5-7 to 6-8-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss J04 Truss Type Jack-Open Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:27 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-GCNhPs53GqYJTUXsWIYj6NvZVyQVBRx7PbDNLtzZJlQ Scale = 1:7.6 T1 B1 HW1 1 2 3 4 3x4 3x6 0-9-10 0-9-10 -1-6-0 1-6-0 0-9-10 0-9-10 0- 6 - 1 5 0- 1 1 - 1 2 0- 7 - 1 0- 1 1 - 1 2 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-4], [2:0-1-8,0-4-2] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.15 0.00 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.00 -0.00 -0.00 0.00 (loc) 2 2 3 2 l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 6 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEDGE Left: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 0-9-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=-119/Mechanical, 2=327/0-5-8 (min. 0-1-8), 4=6/Mechanical Max Horz2=32(LC 12) Max Uplift3=-119(LC 1), 2=-88(LC 12) Max Grav3=39(LC 12), 2=327(LC 1), 4=13(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2 except (jt=lb) 3=119. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss J05 Truss Type Jack-Open Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:28 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-kOx3dB6h18hA4e624?3yfbRkeLmUwuBHeFzxtKzZJlP Scale = 1:10.9 T1 B1 HW1 1 2 5 3 4 3x4 3x6 2-1-10 2-1-10 -1-6-0 1-6-0 2-1-10 2-1-10 0- 6 - 1 5 1- 7 - 1 2 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-4], [2:0-1-8,0-4-2] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.19 0.02 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.00 -0.00 -0.00 0.00 (loc) 2 2-4 3 2 l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 9 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEDGE Left: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 2-1-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=4/Mechanical, 2=323/0-5-8 (min. 0-1-8), 4=15/Mechanical Max Horz2=47(LC 12) Max Uplift3=-10(LC 9), 2=-66(LC 12) Max Grav3=8(LC 17), 2=323(LC 1), 4=33(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-13 to 1-5-3, Interior(1) 1-5-3 to 2-0-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss J06 Truss Type Jack-Open Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:29 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-CaVSqX7JoSp1iohFejaBBo_vZl40fLRQsviUPmzZJlO Scale = 1:14.2 T1 B1 HW1 1 2 5 6 3 4 3x4 3x6 3-5-10 3-5-10 -1-6-0 1-6-0 3-5-10 3-5-10 0- 6 - 1 5 2- 3 - 1 2 1- 1 1 - 1 2- 3 - 1 2 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-4], [2:0-1-8,0-4-2] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.18 0.06 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.01 -0.01 -0.00 0.00 (loc) 2-4 2-4 3 2 l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 13 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEDGE Left: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 3-5-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=93/Mechanical, 2=360/0-5-8 (min. 0-1-8), 4=25/Mechanical Max Horz2=62(LC 12) Max Uplift3=-22(LC 12), 2=-56(LC 12) Max Grav3=93(LC 1), 2=360(LC 1), 4=57(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-13 to 1-5-3, Interior(1) 1-5-3 to 3-4-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss J07 Truss Type Jack-Open Qty 2 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:29 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-CaVSqX7JoSp1iohFejaBBo_uXl3ufLRQsviUPmzZJlO Scale = 1:17.4 T1 B1 HW1 1 2 5 3 4 3x4 3x6 4-9-10 4-9-10 -1-6-0 1-6-0 4-9-10 4-9-10 0- 6 - 1 5 2- 1 1 - 1 2 2- 7 - 1 2- 1 1 - 1 2 6.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-1-4], [2:0-1-8,0-4-2] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.25 0.14 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.02 -0.04 -0.00 0.00 (loc) 2-4 2-4 3 2 l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 17 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEDGE Left: 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=163/Mechanical, 2=415/0-5-8 (min. 0-1-8), 4=36/Mechanical Max Horz2=77(LC 12) Max Uplift3=-39(LC 12), 2=-52(LC 12) Max Grav3=163(LC 1), 2=415(LC 1), 4=81(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) -1-6-13 to 1-5-3, Interior(1) 1-5-3 to 4-8-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss J08 Truss Type Jack-Open Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:30 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-hn3q1t7xZlxuKyGRCQ5Qk0XzH9OHOoha5ZS2yCzZJlN Scale = 1:20.2 T1 B1 HW1 1 2 5 3 4 3x4 3x4 3x4 6-0-0 6-0-0 0- 6 - 1 5 3- 6 - 1 5 3- 2 - 4 3- 6 - 1 5 6.00 12 Plate Offsets (X,Y)-- [1:0-0-7,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.63 0.25 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.07 -0.12 0.02 0.00 (loc) 1-4 1-4 3 1 l/defl >999 >582 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 22 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x4 DF Stud/Std - 3-3-12 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 6-0-0 except (jt=length) 3=Mechanical, 3=Mechanical. (lb) - Max Horz1=73(LC 12) Max Uplift All uplift 100 lb or less at joint(s) 3 Max Grav All reactions 250 lb or less at joint(s) 4 except 1=303(LC 1), 3=255(LC 1), 3=255(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-0-0 to 3-0-0, Interior(1) 3-0-0 to 5-11-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss LAY01 Truss Type Lay-In Gable Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:31 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-9zdCFD8ZK33lx5rdl8cfGD3GjZnd7EJjKDBbUfzZJlM Scale = 1:43.5 T1 T1 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 B2 1 2 3 4 5 6 7 8 9 17 16 15 14 13 12 11 10 18 19 3x4 4x4 3x4 3x4 18-9-5 18-9-5 9-4-10 9-4-10 18-9-5 9-4-10 0- 0 - 4 6- 1 1 - 1 5 0- 0 - 4 8.94 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.07 0.06 0.10 DEFL. Vert(LL) Vert(CT) Horz(CT) in n/a n/a 0.00 (loc) - - 9 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 92 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 18-9-5. (lb) - Max Horz1=106(LC 11) Max Uplift All uplift 100 lb or less at joint(s) 14, 15, 17, 12, 11, 10 Max Grav All reactions 250 lb or less at joint(s) 1, 9, 13, 14, 15, 12, 11 except 17=310(LC 21), 10=310(LC 22) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-5-4 to 3-4-10, Interior(1) 3-4-10 to 9-4-10, Exterior(2) 9-4-10 to 12-4-10, Interior(1) 12-4-10 to 18-4-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are 2x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 15, 17, 12, 11, 10. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0404-20 Truss LAY02 Truss Type Lay-In Gable Qty 1 Ply 1 New Peak Const./Rockchuck 3 car(RP3/18) Job Reference (optional) Run: 8.320 s Nov 19 2019 Print: 8.320 s Nov 19 2019 MiTek Industries, Inc. Thu Mar 19 15:18:32 2020 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:nTNz?9eOn5YF6AgegTb5WbzZdrc-d9BaSZ9B4NBcZFQpJr8upRcQJz7ushCsZtx805zZJlL Scale = 1:40.1 W1 T1 T2 B1 ST3 ST2 ST1 ST2 ST1 ST4 1 2 3 4 5 6 7 8 15 14 13 12 11 10 9 16 17 18 4x4 3x4 15-0-6 15-0-6 5-7-12 5-7-12 15-0-6 9-4-10 2- 9 - 7 6- 1 1 - 1 5 0- 0 - 4 8.94 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.08 0.05 0.13 DEFL. Vert(LL) Vert(CT) Horz(CT) in n/a n/a 0.00 (loc) - - 8 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 83 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 15-0-6. (lb) - Max Horz15=-136(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 15, 8, 12, 13, 14, 11, 10, 9 Max Grav All reactions 250 lb or less at joint(s) 15, 8, 12, 13, 14, 11, 10 except 9=310(LC 22) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-7-12, Exterior(2) 5-7-12 to 8-7-12, Interior(1) 8-7-12 to 14-7-2 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are 2x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 8, 12, 13, 14, 11, 10, 9. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard