Loading...
HomeMy WebLinkAboutDog Park Final Estimates 04092020Dog Park at Eagle Park Item No.Item Description Unit Bid Quantity Unit Bid Price Estimated Cost Estimated Total Cost Parking Lot Construction 202.4.1.A.1 Excavation/Asphalt Removal CY 275 10 2,750$ 202.4.6.A.1 12" Granular Borrow CY 190 25 4,750$ 802.4.1.A.1 3.5" of 3/4" Minus Crushed Aggr. Base CY 60 65 3,900$ 11,400$ 2040.4.1.A.1 6' Foot Chain Link Fence LF 1050 20 21,000$ 2040.4.1.A.1 5' Wide Entry Gate EA 3 1000 3,000$ 2040.4.1.A.1 12' Wide Service Gate EA 3 2400 7,200$ Tree Removal LS 1 500 500$ 31,700$ 202.4.1.A.1 Excavation/Asphalt Removal CY 55 10 550$ 202.4.6.A.1 12" Granular Borrow CY 35 25 875$ 802.4.1.A.1 3.5" of 3/4" Minus Crushed Aggr. Base CY 12 65 780$ 810.4.1.A.1 2.5" Asphalt Surface Course Plant Mix (145 pcf)TON 15 100 1,500$ 3,705$ Water Line to Spigot LF 222.25 45 10,001$ Water Spigot EA 1 300 300$ 10,301$ Benches EA 4 500 2,000$ Signs EA 3 500 1,500$ Trash Cans EA 3 400 1,200$ Pet Waste Stations EA 3 200 600$ Pet Waste Signs EA 3 20 60$ 5,360$ 62,466$ 10%Contingency 6,247$ Subtotal 68,713$ 10%Engineering 6,871$ Account 38438729 Grand Total 75,584$ $196,800 projected carryover in parks impact FY20 yearend 155' Asphalt Path Construction Fencing and Trees Other Park Ammenities Total Before Contingency/Engineering