Loading...
HomeMy WebLinkAboutPA SUMMARY - 20-00206 - Rexburg Ball Fields ConcessionsApplication Summary Application Number: 20-00206 BLD-COM - New Commercial Building Received Date: 04/07/2020 Rexburg Ball Park Concession Building Address: Property Information People Information Applicant - Merrill Construction LLC 1322 N. 16th. E. merrillconstructionllc@gmail.com Sugar City, ID 83448 Mobile: 2083511801 Owner - City of Rexburg 35 N. 1st. E. Rexburg, ID 83440 Contractor Information Mechanical Contractor - Alpine Heating & Air HVC-C-3258 (01/31/2022) paula@alpineheatingair.com 170 N Eastern Ave Idaho Falls, ID 83401Work: 208-523-5542 Plumbing Contractor - LIBERTY PLUMBING PLB-C-12663 (12/31/2019) 431 W 300 N Blackfoot, ID 83221Work: (208)782-0640 Mobile: (208)604-5441 Electrical Contractor - LEISHMAN ELECTRIC ELE-C-1934 (04/30/2020) leishmanelectric@yahoo.com 442 S 4TH E Rexburg, ID 83440Work: (208)356-3770 Mobile: (208)390-5066 General Contractor - MERRILL CONSTRUCTION LLC RCE-2532 (12/20/2019) merrillconstructionllc@gmail.com 1322 N 16TH E Sugar City, ID 83448Work: (208)356-4276 Mobile: (208)351-1801 General Contractor - Straight Arrow Construction, Inc. RCE-21622 (05/15/2020) straightarrowconstruction@msn.com 649 N 3900 E Rigby, ID 83442Home: 208-313-1278Work: 208-313-1278 Mobile: 208-313-1278 General Contractor - JW Masonry RCE 13350 (03/28/2018) jwmasonry@msn.com 2714 W 3000 N Rexburg, ID 83440Work: 208-351-6053 Page 1 of 4Print Date: 04/08/2020 Application Summary Application Number: 20-00206 BLD-COM - New Commercial Building Received Date: 04/07/2020 Rexburg Ball Park Concession Building Address: Application Information Detail Description Quantity Value YI understand building without the Building Permit signed by the Building Administrator will result in double fees and the project will be red tagged causing all construction to stop. Other - explain belowZoning designation 1,839.00Total Square Feet of Construction 1,839.00 NoWill the project include demolition of any existing structure(s)? Number of 3-yard Dumpsters requested Design Occupant Load 35,937.00Total Electrical Contracted Amount 35,937.00 NAre water meters needed as part of this project? Other - Please Explain BelowWater meter size needed? Larger sizes (1.5" or more) may require additional lead time for delivery. 17,130.00Total Mechanical Contracted Amount 17,130.00 Sprinkler System Required? Requested number of weekly dumpster pickups NoIs this business moving from another location? Public FacilitiesZoning explanation (if any) YI understand the building cannot be occupied without receiving a signed Certificate of Occupancy which may result in citations and eviction. YI understand if an inspection is not done, the inspector may require any measures to allow him to correctly perform the inspection. Call hotline at (208) 372-2344 not the inspector. Concession BuildingDescription of work being done NoIs this an additional new location for this business? Estimated dumpster delivery date Sprinkler System Provided? 30,716.00Total Plumbing Contracted Amount 30,716.00 0.00Number of water meters needed? (Large quantities may require additional lead time for delivery) N/AWater meter explanation (if any) Total Fire Alarm Contracted Amount 0.00 Applicable edition of code Page 2 of 4Print Date: 04/08/2020 Application Summary Application Number: 20-00206 BLD-COM - New Commercial Building Received Date: 04/07/2020 Rexburg Ball Park Concession Building Address: What are the locations of any related existing business in the city? YI understand approval from 1 inspector does not constitute full City approval. Ultimately I must have a complete, signed Building Permit or a Certificate of Occupancy. YI understand it is my responsibility to inform anyone on my project about building policies. These policies will be enforced regardless of if this information is passed on or not. YElectrical work included What was the previous use of structure? Construction Type Total Fire Sprinkler Contracted Amount 0.00 367,055.00Construction Valuation (Building ONLY - Materials & Labor) 367,055.00 Use and Occupancy YI understand that when the water meter and associated equipment are delivered, the contractor shall be responsible for this equipment until inspected for Certificate of Occupancy. Industrial Use: If Applicable YMechanical work included Office Use: If Applicable Retail Use: If Applicable Restaurant Use: if Applicable YPlumbing work included Service Use: if Applicable NFire Alarm work included NFire Sprinkler work included Other comments Page 3 of 4Print Date: 04/08/2020 Application Summary Application Number: 20-00206 BLD-COM - New Commercial Building Received Date: 04/07/2020 Rexburg Ball Park Concession Building Address: Fee Information Fee Code & Description Amount $2,018.002" Water Meter Inside Radio Read (WM-2") $2,542.00Building - Building Permit (BLDBLP@@) $519.00Electrical - Non-Res or General by Cost (BLDELNR@) $254.00Building - Plan Review (BLDBLPCK) $52.00Electrical - Plan Review (BLDELPCK) $331.00Mechanical - Non-Res or General by Cost (BLDMENR@) $467.00Plumbing - Non-Res or General by Cost (BLDPLNR@) $33.00Mechanical - Plan Review (BLDMEPCK) $0.00Impact - Fire - Non-Residential (FIRICNON) $0.00Impact - Police - Non-Residential (POLICNON) $0.00Impact - Streets - Non-Residential (STRICNON) $1,745.00Water Connection - Non-Residential (WTRICNON) $1,700.00Sewer Connection - Non-Residential (WWRICNON) $47.00Plumbing - Plan Review (BLDPLPCK) $9,708.00 Payment Information Payment AmountTender Type Reference InfoPayment Date Page 4 of 4Print Date: 04/08/2020