Loading...
HomeMy WebLinkAboutTRUSS SPECS - 20-00190 - Shaw - 907 Pine Brook Ln - New SFR- F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; M6 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL N* 224 /- /- /64 /26 /18 Wind reactions based on MWFRS N Brg Width = 276 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 0 B - C 148 -247 C - D 174 -202 D - E 136 -139 E - F 134 -108 F - G 231 -98 G - H 348 -124 Chords Tens. Comp. H - I 348 -124 I - J 231 -98 J - K 140 -114 K - L 142 -146 L - M 180 -208 M - N 154 -253 N - O 156 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AA 307 -220 AA- Z 309 -221 Z - Y 314 -225 Y - X 318 -228 X - W 320 -230 W - V 322 -232 V - U 322 -232 Chords Tens. Comp. U - T 323 -238 T - S 321 -236 S - R 318 -233 R - Q 315 -231 Q - P 309 -226 P - N 307 -225 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C -AA 71 -147 D - Z 162 -387 E - Y 150 -372 F - X 153 -377 G - W 166 -448 H - V 0 -356 Gables Tens. Comp. T - I 166 -448 S - J 153 -377 R - K 150 -372 Q - L 162 -387 P - M 71 -147 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.003 G 999 240 VERT(CL): 0.005 G 999 180 HORZ(LL): -0.003 G - - HORZ(TL): 0.005 G - - Creep Factor: 2.0 Max TC CSI: 0.444 Max BC CSI: 0.094 Max Web CSI: 0.233 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A1 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 125968 / T12 / GABL FROM: BF DRW: ... / ... 03/17/2020 M6 23' 1'6" 2' (TYP) 11'6" 11'6" 23' 11'6" 23' 23'1'6"1'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F G H I J K L M N O PQRSTUVWXYZAA 8 12 2X4(A1T) 4X6 3X6 2X4(A1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; M6 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL N* 224 /- /- /64 /26 /18 Wind reactions based on MWFRS N Brg Width = 276 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 0 B - C 148 -247 C - D 174 -202 D - E 136 -139 E - F 134 -108 F - G 231 -98 G - H 348 -124 Chords Tens. Comp. H - I 348 -124 I - J 231 -98 J - K 140 -114 K - L 142 -146 L - M 180 -208 M - N 154 -253 N - O 156 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AA 307 -220 AA- Z 309 -221 Z - Y 314 -225 Y - X 318 -228 X - W 320 -230 W - V 322 -232 V - U 322 -232 Chords Tens. Comp. U - T 323 -238 T - S 321 -236 S - R 318 -233 R - Q 315 -231 Q - P 309 -226 P - N 307 -225 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C -AA 71 -147 D - Z 162 -387 E - Y 150 -372 F - X 153 -377 G - W 166 -448 H - V 0 -356 Gables Tens. Comp. T - I 166 -448 S - J 153 -377 R - K 150 -372 Q - L 162 -387 P - M 71 -147 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.003 G 999 240 VERT(CL): 0.005 G 999 180 HORZ(LL): -0.003 G - - HORZ(TL): 0.005 G - - Creep Factor: 2.0 Max TC CSI: 0.444 Max BC CSI: 0.094 Max Web CSI: 0.233 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A1 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 125968 / T12 / GABL FROM: BF DRW: ... / ... 03/17/2020 M6 23' 1'6" 2' (TYP) 11'6" 11'6" 23' 11'6" 23' 23'1'6"1'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F G H I J K L M N O PQRSTUVWXYZAA 8 12 2X4(A1T) 4X6 3X6 2X4(A1T) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1357 /- /- /532 /92 /212 F 1357 /- /- /532 /92 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = 3.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 236 -1745 C - D 296 -1530 Chords Tens. Comp. D - E 296 -1530 E - F 235 -1745 F - G 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1348 -68 J - I 900 0 Chords Tens. Comp. I - H 900 0 H - F 1348 -74 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 185 -445 J - D 586 -104 Webs Tens. Comp. D - H 587 -104 H - E 185 -445 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.051 H 999 240 VERT(CL): 0.075 H 999 180 HORZ(LL): 0.022 H - - HORZ(TL): 0.033 H - - Creep Factor: 2.0 Max TC CSI: 0.367 Max BC CSI: 0.354 Max Web CSI: 0.169 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A2 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 125969 / T10 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"101'6"1'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F GHIJ 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1357 /- /- /532 /92 /212 F 1357 /- /- /532 /92 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = 3.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 236 -1745 C - D 296 -1530 Chords Tens. Comp. D - E 296 -1530 E - F 235 -1745 F - G 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1348 -68 J - I 900 0 Chords Tens. Comp. I - H 900 0 H - F 1348 -74 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 185 -445 J - D 586 -104 Webs Tens. Comp. D - H 587 -104 H - E 185 -445 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.051 H 999 240 VERT(CL): 0.075 H 999 180 HORZ(LL): 0.022 H - - HORZ(TL): 0.033 H - - Creep Factor: 2.0 Max TC CSI: 0.367 Max BC CSI: 0.354 Max Web CSI: 0.169 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A2 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 125969 / T10 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"101'6"1'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F GHIJ 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1T) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1357 /- /- /532 /94 /195 F 1210 /- /- /453 /72 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = 3.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 241 -1745 C - D 302 -1530 Chords Tens. Comp. D - E 310 -1530 E - F 248 -1745 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 1348 -118 I - H 900 0 Chords Tens. Comp. H - G 900 0 G - F 1348 -127 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - I 185 -445 I - D 584 -102 Webs Tens. Comp. D - G 587 -115 G - E 193 -445 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.049 I 999 240 VERT(CL): 0.073 I 999 180 HORZ(LL): 0.022 G - - HORZ(TL): 0.033 G - - Creep Factor: 2.0 Max TC CSI: 0.367 Max BC CSI: 0.359 Max Web CSI: 0.169 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125970 / T13 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"101'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F GHI 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1357 /- /- /532 /94 /195 F 1210 /- /- /453 /72 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = 3.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 241 -1745 C - D 302 -1530 Chords Tens. Comp. D - E 310 -1530 E - F 248 -1745 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 1348 -118 I - H 900 0 Chords Tens. Comp. H - G 900 0 G - F 1348 -127 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - I 185 -445 I - D 584 -102 Webs Tens. Comp. D - G 587 -115 G - E 193 -445 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.049 I 999 240 VERT(CL): 0.073 I 999 180 HORZ(LL): 0.022 G - - HORZ(TL): 0.033 G - - Creep Factor: 2.0 Max TC CSI: 0.367 Max BC CSI: 0.359 Max Web CSI: 0.169 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125970 / T13 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"101'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F GHI 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1) A4T14 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 1211 /- /- /454 /73 /166 E 1209 /- /- /453 /73 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing A Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 252 -1747 B - C 314 -1532 Chords Tens. Comp. C - D 314 -1536 D - E 252 -1750 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - H 1349 -130 H - G 902 0 Chords Tens. Comp. G - F 902 0 F - E 1353 -130 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - H 193 -445 H - C 584 -114 Webs Tens. Comp. C - F 590 -115 F - D 193 -448 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.048 F 999 240 VERT(CL): 0.072 F 999 180 HORZ(LL): 0.022 F - - HORZ(TL): 0.033 F - - Creep Factor: 2.0 Max TC CSI: 0.372 Max BC CSI: 0.361 Max Web CSI: 0.170 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A4 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125973 / T14 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' (J)Supporting Member: (2) 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"10 4"7 8'0 " 7 A B C D E FGH 8 12 3X6(B1) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 1211 /- /- /454 /73 /166 E 1209 /- /- /453 /73 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing A Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 252 -1747 B - C 314 -1532 Chords Tens. Comp. C - D 314 -1536 D - E 252 -1750 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - H 1349 -130 H - G 902 0 Chords Tens. Comp. G - F 902 0 F - E 1353 -130 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - H 193 -445 H - C 584 -114 Webs Tens. Comp. C - F 590 -115 F - D 193 -448 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.048 F 999 240 VERT(CL): 0.072 F 999 180 HORZ(LL): 0.022 F - - HORZ(TL): 0.033 F - - Creep Factor: 2.0 Max TC CSI: 0.372 Max BC CSI: 0.361 Max Web CSI: 0.170 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A4 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125973 / T14 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' (J)Supporting Member: (2) 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"10 4"7 8'0 " 7 A B C D E FGH 8 12 3X6(B1) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1) A5T27 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W5 2x4 DF-L #1&Bet.; Lt Slider: 2x4 DF-L Stud; block length = 1.500' Rt Slider: 2x4 DF-L Stud; block length = 1.500' Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 3.25" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at 0.00 to 89 plf at 23.00 BC: From 8 plf at 0.00 to 8 plf at 23.00 BC: 685 lb Conc. Load at 0.94, 2.94, 4.94, 6.94 BC: 586 lb Conc. Load at 8.94 BC: 612 lb Conc. Load at 10.94 BC: 615 lb Conc. Load at 12.94 BC: 647 lb Conc. Load at 14.94 BC: 856 lb Conc. Load at 16.94 BC: 1024 lb Conc. Load at 17.94,19.94,21.94 Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL P 5196 /- /- /- /690 /- I 6165 /- /- /- /561 /- Wind reactions based on MWFRS P Brg Width = 3.5 Min Req = 2.8 I Brg Width = - Min Req = - Bearing P Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 483 -3678 B - C 475 -3637 C - D 392 -3049 D - E 286 -2388 Chords Tens. Comp. E - F 286 -2388 F - G 350 -3301 G - H 411 -4288 H - I 419 -4326 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - O 3007 -393 O - N 2984 -389 N - M 2462 -314 M - L 2656 -281 Chords Tens. Comp. L - K 2656 -281 K - J 3520 -337 J - I 3555 -339 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. O - C 610 -81 C - N 91 -631 N - D 964 -151 D - M 146 -906 E - M 2427 -279 Webs Tens. Comp. M - F 88 -1253 F - K 1392 -80 K - G 68 -1056 G - J 1095 -54 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.114 K 999 240 VERT(CL): 0.165 K 999 180 HORZ(LL): 0.036 D - - HORZ(TL): 0.052 D - - Creep Factor: 2.0 Max TC CSI: 0.424 Max BC CSI: 0.540 Max Web CSI: 0.529 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A5 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126053 / T27 / COMN FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required W5 23' (J)Supporting Member: (2) 4'3"4 4'3"4 7'10"10 3'7"6 11'6" 3'7"6 15'1"6 3'7"6 18'8"12 3'7"6 23' 4'3"4 4'3"4 4'3"4 7'10"10 3'7"6 11'6" 3'7"6 15'1"6 3'7"6 18'8"12 3'7"6 23' 4'3"4 4"7 8'0 " 7 A B C D E F G H I JKLMNOP 8 12 2X4(C5) 8X8(C5)3X6 3X6 3X6 3X6 4X6 4X6(R) 5X8 4X6 5X6 4X6 4X6 5X6 3X6 2X4(C5) 8X8(C5) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W5 2x4 DF-L #1&Bet.; Lt Slider: 2x4 DF-L Stud; block length = 1.500' Rt Slider: 2x4 DF-L Stud; block length = 1.500' Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 3.25" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at 0.00 to 89 plf at 23.00 BC: From 8 plf at 0.00 to 8 plf at 23.00 BC: 685 lb Conc. Load at 0.94, 2.94, 4.94, 6.94 BC: 586 lb Conc. Load at 8.94 BC: 612 lb Conc. Load at 10.94 BC: 615 lb Conc. Load at 12.94 BC: 647 lb Conc. Load at 14.94 BC: 856 lb Conc. Load at 16.94 BC: 1024 lb Conc. Load at 17.94,19.94,21.94 Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL P 5196 /- /- /- /690 /- I 6165 /- /- /- /561 /- Wind reactions based on MWFRS P Brg Width = 3.5 Min Req = 2.8 I Brg Width = - Min Req = - Bearing P Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 483 -3678 B - C 475 -3637 C - D 392 -3049 D - E 286 -2388 Chords Tens. Comp. E - F 286 -2388 F - G 350 -3301 G - H 411 -4288 H - I 419 -4326 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - O 3007 -393 O - N 2984 -389 N - M 2462 -314 M - L 2656 -281 Chords Tens. Comp. L - K 2656 -281 K - J 3520 -337 J - I 3555 -339 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. O - C 610 -81 C - N 91 -631 N - D 964 -151 D - M 146 -906 E - M 2427 -279 Webs Tens. Comp. M - F 88 -1253 F - K 1392 -80 K - G 68 -1056 G - J 1095 -54 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.114 K 999 240 VERT(CL): 0.165 K 999 180 HORZ(LL): 0.036 D - - HORZ(TL): 0.052 D - - Creep Factor: 2.0 Max TC CSI: 0.424 Max BC CSI: 0.540 Max Web CSI: 0.529 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A5 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126053 / T27 / COMN FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required W5 23' (J)Supporting Member: (2) 4'3"4 4'3"4 7'10"10 3'7"6 11'6" 3'7"6 15'1"6 3'7"6 18'8"12 3'7"6 23' 4'3"4 4'3"4 4'3"4 7'10"10 3'7"6 11'6" 3'7"6 15'1"6 3'7"6 18'8"12 3'7"6 23' 4'3"4 4"7 8'0 " 7 A B C D E F G H I JKLMNOP 8 12 2X4(C5) 8X8(C5)3X6 3X6 3X6 3X6 4X6 4X6(R) 5X8 4X6 5X6 4X6 4X6 5X6 3X6 2X4(C5) 8X8(C5) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1357 /- /- /532 /94 /195 F 1210 /- /- /453 /72 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 F Brg Width = 5.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 241 -1745 C - D 302 -1530 Chords Tens. Comp. D - E 310 -1530 E - F 248 -1745 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 1348 -118 I - H 900 0 Chords Tens. Comp. H - G 900 0 G - F 1348 -127 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - I 185 -445 I - D 584 -102 Webs Tens. Comp. D - G 587 -115 G - E 193 -445 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.049 I 999 240 VERT(CL): 0.073 I 999 180 HORZ(LL): 0.022 G - - HORZ(TL): 0.033 G - - Creep Factor: 2.0 Max TC CSI: 0.367 Max BC CSI: 0.359 Max Web CSI: 0.169 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A6 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125999 / T18 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"101'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F GHI 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1357 /- /- /532 /94 /195 F 1210 /- /- /453 /72 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 F Brg Width = 5.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 241 -1745 C - D 302 -1530 Chords Tens. Comp. D - E 310 -1530 E - F 248 -1745 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 1348 -118 I - H 900 0 Chords Tens. Comp. H - G 900 0 G - F 1348 -127 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - I 185 -445 I - D 584 -102 Webs Tens. Comp. D - G 587 -115 G - E 193 -445 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.049 I 999 240 VERT(CL): 0.073 I 999 180 HORZ(LL): 0.022 G - - HORZ(TL): 0.033 G - - Creep Factor: 2.0 Max TC CSI: 0.367 Max BC CSI: 0.359 Max Web CSI: 0.169 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A6 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125999 / T18 / COMN FROM: BF DRW: ... / ... 03/17/2020 W2 W2 23' 5'11"7 5'11"7 11'6" 5'6"9 17'0"9 5'6"9 23' 5'11"7 7'9"10 7'9"10 15'2"6 7'4"12 23' 7'9"101'6" 4"7 8'0 " 7 9'0 " 3 A B C D E F GHI 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 3X6 2X4 3X6(B1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3 2x4 DF-L #1&Bet.; Rt Slider: 2x4 DF-L Stud; block length = 2.072' Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1344 /- /- /529 /91 /192 H 1185 /- /- /445 /66 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 H Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 223 -1734 C - D 239 -1212 D - E 284 -1114 Chords Tens. Comp. E - F 234 -1551 F - G 326 -2604 G - H 206 -1664 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - M 1334 -112 M - L 1333 -113 L - K 1416 -36 Chords Tens. Comp. K - J 2118 -227 J - I 1379 -146 I - H 1264 -140 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - C 212 0 C - L 154 -556 D - L 907 -215 L - E 172 -1304 K - E 1114 -36 Webs Tens. Comp. K - F 207 -992 F - J 514 0 J - G 1084 -106 I - G 93 -820 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.093 K 999 240 VERT(CL): 0.139 K 999 180 HORZ(LL): 0.059 I - - HORZ(TL): 0.089 I - - Creep Factor: 2.0 Max TC CSI: 0.403 Max BC CSI: 0.388 Max Web CSI: 0.643 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A7 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 125996 / T39 / SPEC FROM: BF DRW: ... / ... 03/17/2020 W3 22'6"8 (J)Supporting Member: (2) 5'11"7 5'11"7 11'6" 5'6"9 13' 1'6" 19'0"8 6'0"8 20'6"8 1'6" 22'6"8 2' 5'11"7 5'11"7 11'6" 5'6"9 13' 1'6" 19'0"8 6'0"8 20'6"8 1'6" 22'6"8 2' 1'6" 4"7 8"21' 8'0 " 7 9'0 " 3 (a) A B C D E F G H I JK LM 8 12 8 12 3X6(B1T) 2X4 3X6 4X6(R) 6X6 6X10(SRS) 4X6 3X6 5X6 4X6 4X8 4X6(E5) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3 2x4 DF-L #1&Bet.; Rt Slider: 2x4 DF-L Stud; block length = 2.072' Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1344 /- /- /529 /91 /192 H 1185 /- /- /445 /66 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 H Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 223 -1734 C - D 239 -1212 D - E 284 -1114 Chords Tens. Comp. E - F 234 -1551 F - G 326 -2604 G - H 206 -1664 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - M 1334 -112 M - L 1333 -113 L - K 1416 -36 Chords Tens. Comp. K - J 2118 -227 J - I 1379 -146 I - H 1264 -140 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - C 212 0 C - L 154 -556 D - L 907 -215 L - E 172 -1304 K - E 1114 -36 Webs Tens. Comp. K - F 207 -992 F - J 514 0 J - G 1084 -106 I - G 93 -820 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.093 K 999 240 VERT(CL): 0.139 K 999 180 HORZ(LL): 0.059 I - - HORZ(TL): 0.089 I - - Creep Factor: 2.0 Max TC CSI: 0.403 Max BC CSI: 0.388 Max Web CSI: 0.643 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A7 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 125996 / T39 / SPEC FROM: BF DRW: ... / ... 03/17/2020 W3 22'6"8 (J)Supporting Member: (2) 5'11"7 5'11"7 11'6" 5'6"9 13' 1'6" 19'0"8 6'0"8 20'6"8 1'6" 22'6"8 2' 5'11"7 5'11"7 11'6" 5'6"9 13' 1'6" 19'0"8 6'0"8 20'6"8 1'6" 22'6"8 2' 1'6" 4"7 8"21' 8'0 " 7 9'0 " 3 (a) A B C D E F G H I JK LM 8 12 8 12 3X6(B1T) 2X4 3X6 4X6(R) 6X6 6X10(SRS) 4X6 3X6 5X6 4X6 4X8 4X6(E5) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3 2x4 DF-L #1&Bet.; Rt Slider: 2x4 DF-L Stud; block length = 2.000' Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1341 /- /- /527 /92 /192 G 1178 /- /- /438 /70 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 G Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 226 -1728 C - D 240 -1204 Chords Tens. Comp. D - E 241 -1204 E - F 227 -1613 F - G 293 -1697 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1329 -114 K - J 1328 -115 J - I 1286 -118 Chords Tens. Comp. I - H 1286 -118 H - G 1288 -118 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - C 207 0 C - J 152 -554 D - J 716 -131 Webs Tens. Comp. J - E 157 -503 E - H 199 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.071 F 999 240 VERT(CL): 0.106 F 999 180 HORZ(LL): -0.026 F - - HORZ(TL): 0.038 F - - Creep Factor: 2.0 Max TC CSI: 0.487 Max BC CSI: 0.290 Max Web CSI: 0.458 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A8 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 125994 / T51 / COMN FROM: BF DRW: ... / ... 03/17/2020 W3 22'6"8 (J)Supporting Member: (2) 5'11"7 5'11"7 11'6" 5'6"9 17'0"4 5'6"4 22'6"8 5'6"4 5'11"7 5'11"7 11'6" 5'6"9 17'0"4 5'6"4 22'6"8 5'6"41'6" 4"7 8"2 8'0 " 7 9'0 " 3 A B C D E F G HIJK 8 12 3X6(B1T) 2X4 3X6 4X6 4X8 3X6 3X6 2X4 3X6 4X6(E5) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3 2x4 DF-L #1&Bet.; Rt Slider: 2x4 DF-L Stud; block length = 2.000' Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1341 /- /- /527 /92 /192 G 1178 /- /- /438 /70 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 G Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 226 -1728 C - D 240 -1204 Chords Tens. Comp. D - E 241 -1204 E - F 227 -1613 F - G 293 -1697 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1329 -114 K - J 1328 -115 J - I 1286 -118 Chords Tens. Comp. I - H 1286 -118 H - G 1288 -118 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - C 207 0 C - J 152 -554 D - J 716 -131 Webs Tens. Comp. J - E 157 -503 E - H 199 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.071 F 999 240 VERT(CL): 0.106 F 999 180 HORZ(LL): -0.026 F - - HORZ(TL): 0.038 F - - Creep Factor: 2.0 Max TC CSI: 0.487 Max BC CSI: 0.290 Max Web CSI: 0.458 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:A8 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 125994 / T51 / COMN FROM: BF DRW: ... / ... 03/17/2020 W3 22'6"8 (J)Supporting Member: (2) 5'11"7 5'11"7 11'6" 5'6"9 17'0"4 5'6"4 22'6"8 5'6"4 5'11"7 5'11"7 11'6" 5'6"9 17'0"4 5'6"4 22'6"8 5'6"41'6" 4"7 8"2 8'0 " 7 9'0 " 3 A B C D E F G HIJK 8 12 3X6(B1T) 2X4 3X6 4X6 4X8 3X6 3X6 2X4 3X6 4X6(E5) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; Lt Wedge: 2x4 DF-L Stud;Rt Wedge: 2x4 DF-L Stud; Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at -1.66 to 89 plf at 8.00 TC: From 45 plf at 8.00 to 45 plf at 16.50 TC: From 89 plf at 16.50 to 89 plf at 26.16 BC: From 16 plf at 0.00 to 16 plf at 8.01 BC: From 8 plf at 8.01 to 8 plf at 16.49 BC: From 16 plf at 16.49 to 16 plf at 24.50 BC: 1162 lb Conc. Load at 8.01,16.49 BC: 418 lb Conc. Load at 10.06,12.06,12.44,14.44 Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 3209 /- /- /- /415 /- H 3209 /- /- /- /415 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 3.4 H Brg Width = 3.5 Min Req = 3.4 Bearings B & H Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 -14 B - C 697 -5106 C - D 653 -4855 D - E 650 -4635 Chords Tens. Comp. E - F 650 -4635 F - G 653 -4855 G - H 697 -5107 H - I 78 -14 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - M 4166 -562 M - L 3903 -525 L - K 3904 -525 Chords Tens. Comp. K - J 3904 -525 J - H 4166 -562 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 36 -228 M - D 1455 -146 D - L 1177 -198 E - L 39 -233 Webs Tens. Comp. L - F 1177 -198 F - J 1456 -147 J - G 36 -228 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.164 E 999 240 VERT(CL): 0.240 E 999 180 HORZ(LL): 0.051 J - - HORZ(TL): 0.075 J - - Creep Factor: 2.0 Max TC CSI: 0.741 Max BC CSI: 0.652 Max Web CSI: 0.487 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126072 / T6 / HIPS FROM: BF DRW: ... / ... 03/17/2020 24'6" 4'2"7 4'2"7 8' 3'9"9 12'3" 4'3" 16'6" 4'3" 20'3"9 3'9"9 24'6" 4'2"7 8' 8' 12'3" 4'3" 16'6" 4'3" 24'6" 8'1'6"1'6" 4"7 5'8 " 7 6'8 " 3 DT -1"4 A B C D E F G H IJKLM 8 12 4X12(B8RT) 2X4 4X8(R) 5X6 2X4 6X10 H0514 5X6 4X8(R) 2X4 4X12(B8RT) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; Lt Wedge: 2x4 DF-L Stud;Rt Wedge: 2x4 DF-L Stud; Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at -1.66 to 89 plf at 8.00 TC: From 45 plf at 8.00 to 45 plf at 16.50 TC: From 89 plf at 16.50 to 89 plf at 26.16 BC: From 16 plf at 0.00 to 16 plf at 8.01 BC: From 8 plf at 8.01 to 8 plf at 16.49 BC: From 16 plf at 16.49 to 16 plf at 24.50 BC: 1162 lb Conc. Load at 8.01,16.49 BC: 418 lb Conc. Load at 10.06,12.06,12.44,14.44 Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 3209 /- /- /- /415 /- H 3209 /- /- /- /415 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 3.4 H Brg Width = 3.5 Min Req = 3.4 Bearings B & H Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 -14 B - C 697 -5106 C - D 653 -4855 D - E 650 -4635 Chords Tens. Comp. E - F 650 -4635 F - G 653 -4855 G - H 697 -5107 H - I 78 -14 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - M 4166 -562 M - L 3903 -525 L - K 3904 -525 Chords Tens. Comp. K - J 3904 -525 J - H 4166 -562 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 36 -228 M - D 1455 -146 D - L 1177 -198 E - L 39 -233 Webs Tens. Comp. L - F 1177 -198 F - J 1456 -147 J - G 36 -228 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.164 E 999 240 VERT(CL): 0.240 E 999 180 HORZ(LL): 0.051 J - - HORZ(TL): 0.075 J - - Creep Factor: 2.0 Max TC CSI: 0.741 Max BC CSI: 0.652 Max Web CSI: 0.487 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126072 / T6 / HIPS FROM: BF DRW: ... / ... 03/17/2020 24'6" 4'2"7 4'2"7 8' 3'9"9 12'3" 4'3" 16'6" 4'3" 20'3"9 3'9"9 24'6" 4'2"7 8' 8' 12'3" 4'3" 16'6" 4'3" 24'6" 8'1'6"1'6" 4"7 5'8 " 7 6'8 " 3 DT -1"4 A B C D E F G H IJKLM 8 12 4X12(B8RT) 2X4 4X8(R) 5X6 2X4 6X10 H0514 5X6 4X8(R) 2X4 4X12(B8RT) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1436 /- /- /561 /101 /190 G 1436 /- /- /561 /101 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 G Brg Width = 3.5 Min Req = 1.5 Bearings B & G Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 289 -1886 C - D 269 -1516 D - E 264 -1151 Chords Tens. Comp. E - F 267 -1509 F - G 289 -1885 G - H 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1480 -117 K - J 1149 0 Chords Tens. Comp. J - I 1149 0 I - G 1480 -125 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 157 -397 K - D 356 -26 D - I 84 -79 Webs Tens. Comp. E - I 350 -21 I - F 157 -399 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.056 K 999 240 VERT(CL): 0.082 K 999 180 HORZ(LL): 0.028 I - - HORZ(TL): 0.042 I - - Creep Factor: 2.0 Max TC CSI: 0.293 Max BC CSI: 0.413 Max Web CSI: 0.246 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126075 / T2 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W3 24'6" 5'2"7 5'2"7 10' 4'9"9 14'6" 4'6" 19'3"9 4'9"9 24'6" 5'2"7 10' 10' 14'6" 4'6" 24'6" 10'1'6"1'6" 4"7 7'0 " 7 8'0 " 3 DT -1"13 A B C D E F G HIJK 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 4X6 4X8 2X4 3X6(B1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1436 /- /- /561 /101 /190 G 1436 /- /- /561 /101 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 G Brg Width = 3.5 Min Req = 1.5 Bearings B & G Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 289 -1886 C - D 269 -1516 D - E 264 -1151 Chords Tens. Comp. E - F 267 -1509 F - G 289 -1885 G - H 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1480 -117 K - J 1149 0 Chords Tens. Comp. J - I 1149 0 I - G 1480 -125 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 157 -397 K - D 356 -26 D - I 84 -79 Webs Tens. Comp. E - I 350 -21 I - F 157 -399 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.056 K 999 240 VERT(CL): 0.082 K 999 180 HORZ(LL): 0.028 I - - HORZ(TL): 0.042 I - - Creep Factor: 2.0 Max TC CSI: 0.293 Max BC CSI: 0.413 Max Web CSI: 0.246 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126075 / T2 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W3 24'6" 5'2"7 5'2"7 10' 4'9"9 14'6" 4'6" 19'3"9 4'9"9 24'6" 5'2"7 10' 10' 14'6" 4'6" 24'6" 10'1'6"1'6" 4"7 7'0 " 7 8'0 " 3 DT -1"13 A B C D E F G HIJK 8 12 3X6(B1T) 2X4 3X6 4X6 3X6 4X6 4X8 2X4 3X6(B1T) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1436 /- /- /561 /93 /220 F 1436 /- /- /561 /93 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = 3.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 244 -1865 C - D 309 -1636 Chords Tens. Comp. D - E 309 -1636 E - F 244 -1865 F - G 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1441 -71 J - I 961 0 Chords Tens. Comp. I - H 961 0 H - F 1441 -77 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 198 -477 J - D 628 -112 Webs Tens. Comp. D - H 628 -112 H - E 198 -477 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.057 J 999 240 VERT(CL): 0.084 J 999 180 HORZ(LL): 0.025 H - - HORZ(TL): 0.038 H - - Creep Factor: 2.0 Max TC CSI: 0.423 Max BC CSI: 0.399 Max Web CSI: 0.200 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126061 / T1 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W2 W2 24'6" 6'3"15 6'3"15 12' 5'8"1 18'2"1 6'2"1 24'6" 6'3"15 8'3"10 8'3"10 16'2"6 7'10"12 24'6" 8'3"101'6"1'6" 4"7 8'4 " 7 9'4 " 3 A B C D E F GHIJ 8 12 3X6(B1T) 2X4 3X6 3X6 5X6(R) 3X6 2X4 3X6(B1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W2 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1436 /- /- /561 /93 /220 F 1436 /- /- /561 /93 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = 3.5 Min Req = 1.5 Bearings B & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 244 -1865 C - D 309 -1636 Chords Tens. Comp. D - E 309 -1636 E - F 244 -1865 F - G 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1441 -71 J - I 961 0 Chords Tens. Comp. I - H 961 0 H - F 1441 -77 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 198 -477 J - D 628 -112 Webs Tens. Comp. D - H 628 -112 H - E 198 -477 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.057 J 999 240 VERT(CL): 0.084 J 999 180 HORZ(LL): 0.025 H - - HORZ(TL): 0.038 H - - Creep Factor: 2.0 Max TC CSI: 0.423 Max BC CSI: 0.399 Max Web CSI: 0.200 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126061 / T1 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W2 W2 24'6" 6'3"15 6'3"15 12' 5'8"1 18'2"1 6'2"1 24'6" 6'3"15 8'3"10 8'3"10 16'2"6 7'10"12 24'6" 8'3"101'6"1'6" 4"7 8'4 " 7 9'4 " 3 A B C D E F GHIJ 8 12 3X6(B1T) 2X4 3X6 3X6 5X6(R) 3X6 2X4 3X6(B1T) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; B2 2x8 DF-L SS; Webs: 2x4 DF-L Stud; W7 2x4 DF-L #1&Bet.; Rt Wedge: 2x10 DF-L SS; Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 4.25" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at 0.00 to 89 plf at 24.50 BC: From 16 plf at 0.00 to 16 plf at 21.63 BC: From 8 plf at 21.63 to 8 plf at 24.50 BC: 6165 lb Conc. Load at 21.63 BC: 1209 lb Conc. Load at 22.44 Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Bearing Block(s) Brg blocks:0.131"x3", min. nails brg x-loc #blocks length/blk #nails/blk wall plate 2 24.208' 1 12" 5 DF-L Standard Brg block to be same size and species as chord. Refer to drawing CNNAILSP1014 for more information. Additional Notes The maximum concentrated load is 6166# Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 2079 /- /- /- /150 /- T 7851 /- /- /- /659 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req = 1.5 T Brg Width = 3.5 Min Req = - Bearings A & T Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 125 -1661 B - C 121 -1577 C - D 113 -1449 D - E 105 -1322 E - F 105 -1323 Chords Tens. Comp. F - G 155 -1930 G - H 242 -2954 H - I 435 -5225 I - J 488 -5802 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - S 1350 -99 S - R 1350 -99 R - Q 1280 -95 Q - P 1167 -88 P - O 1533 -121 Chords Tens. Comp. O - N 1534 -120 N - M 2341 -189 M - L 4225 -353 L - K 4764 -399 K - J 4827 -405 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. S - B 18 -24 B - R 6 -88 R - C 106 0 C - Q 14 -202 Q - D 155 0 D - P 14 -218 E - P 1284 -86 P - F 92 -1107 Webs Tens. Comp. F - N 1224 -89 N - G 123 -1429 G - M 1655 -129 M - H 208 -2374 H - L 2571 -214 L - I 126 -1454 I - K 1854 -161 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.106 M 999 240 VERT(CL): 0.155 M 999 180 HORZ(LL): 0.030 D - - HORZ(TL): 0.045 D - - Creep Factor: 2.0 Max TC CSI: 0.841 Max BC CSI: 0.833 Max Web CSI: 0.860 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B4 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126093 / T21 / COMN FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required B2 W7 BL1 24'6" 3'6"10 3'6"10 6'5"7 2'10"12 9'4"3 2'10"12 12'3" 2'10"12 15'1"12 2'10"12 18'0"9 2'10"12 20'11"5 2'10"12 21'6"12 7"7 24'6" 2'11"4 3'6"10 3'6"10 6'5"7 2'10"12 9'4"3 2'10"12 12'3" 2'10"12 15'1"12 2'10"12 18'0"9 2'10"12 20'11"5 2'10"12 21'6"12 7"7 24'6" 2'11"4 4"7 8'6 " 7 A B C D E F G H I J KLMNOPQRS T 8 12 3X6(A1) 2X4 3X6 3X6 3X6 3X6 3X6 4X6 4X8 6X6 4X6 4X6 5X6 5X6 6X10 6X10(R) 6X6 3X12 7X14(B7R) 2X4(BP) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; B2 2x8 DF-L SS; Webs: 2x4 DF-L Stud; W7 2x4 DF-L #1&Bet.; Rt Wedge: 2x10 DF-L SS; Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 4.25" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at 0.00 to 89 plf at 24.50 BC: From 16 plf at 0.00 to 16 plf at 21.63 BC: From 8 plf at 21.63 to 8 plf at 24.50 BC: 6165 lb Conc. Load at 21.63 BC: 1209 lb Conc. Load at 22.44 Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Bearing Block(s) Brg blocks:0.131"x3", min. nails brg x-loc #blocks length/blk #nails/blk wall plate 2 24.208' 1 12" 5 DF-L Standard Brg block to be same size and species as chord. Refer to drawing CNNAILSP1014 for more information. Additional Notes The maximum concentrated load is 6166# Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 2079 /- /- /- /150 /- T 7851 /- /- /- /659 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req = 1.5 T Brg Width = 3.5 Min Req = - Bearings A & T Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 125 -1661 B - C 121 -1577 C - D 113 -1449 D - E 105 -1322 E - F 105 -1323 Chords Tens. Comp. F - G 155 -1930 G - H 242 -2954 H - I 435 -5225 I - J 488 -5802 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - S 1350 -99 S - R 1350 -99 R - Q 1280 -95 Q - P 1167 -88 P - O 1533 -121 Chords Tens. Comp. O - N 1534 -120 N - M 2341 -189 M - L 4225 -353 L - K 4764 -399 K - J 4827 -405 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. S - B 18 -24 B - R 6 -88 R - C 106 0 C - Q 14 -202 Q - D 155 0 D - P 14 -218 E - P 1284 -86 P - F 92 -1107 Webs Tens. Comp. F - N 1224 -89 N - G 123 -1429 G - M 1655 -129 M - H 208 -2374 H - L 2571 -214 L - I 126 -1454 I - K 1854 -161 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.106 M 999 240 VERT(CL): 0.155 M 999 180 HORZ(LL): 0.030 D - - HORZ(TL): 0.045 D - - Creep Factor: 2.0 Max TC CSI: 0.841 Max BC CSI: 0.833 Max Web CSI: 0.860 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B4 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126093 / T21 / COMN FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required B2 W7 BL1 24'6" 3'6"10 3'6"10 6'5"7 2'10"12 9'4"3 2'10"12 12'3" 2'10"12 15'1"12 2'10"12 18'0"9 2'10"12 20'11"5 2'10"12 21'6"12 7"7 24'6" 2'11"4 3'6"10 3'6"10 6'5"7 2'10"12 9'4"3 2'10"12 12'3" 2'10"12 15'1"12 2'10"12 18'0"9 2'10"12 20'11"5 2'10"12 21'6"12 7"7 24'6" 2'11"4 4"7 8'6 " 7 A B C D E F G H I J KLMNOPQRS T 8 12 3X6(A1) 2X4 3X6 3X6 3X6 3X6 3X6 4X6 4X8 6X6 4X6 4X6 5X6 5X6 6X10 6X10(R) 6X6 3X12 7X14(B7R) 2X4(BP) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W4 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H 1024 /- /- /376 /60 /146 F 1024 /- /- /365 /63 /- Wind reactions based on MWFRS H Brg Width = 5.5 Min Req = 1.5 F Brg Width = - Min Req = - Bearing H Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 94 -155 B - C 198 -911 Chords Tens. Comp. C - D 201 -894 D - E 107 -118 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. H - G 828 -118 Chords Tens. Comp. G - F 723 -86 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - H 71 -213 H - B 138 -1080 B - G 167 -251 C - G 441 -98 Webs Tens. Comp. G - D 134 -117 D - F 131 -1053 E - F 66 -181 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025 G 999 240 VERT(CL): 0.037 G 999 180 HORZ(LL): 0.015 E - - HORZ(TL): 0.022 E - - Creep Factor: 2.0 Max TC CSI: 0.316 Max BC CSI: 0.651 Max Web CSI: 0.923 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B5 Ply: 1 Qty: 3 Wgt: 0.0 lbs SEQN: 126041 / T17 / COMN FROM: BF DRW: ... / ... 03/17/2020 W4 19'5"8 (J)Supporting Member: (2) 5'1"4 5'1"4 10'2"8 5'1"4 14'10" 4'7"8 19'5"8 4'7"8 10'2"8 10'2"8 19'5"8 9'3" 1'8 " 1 3 2'4 " 7 8'6 " 7 A B C D E FGH 8 12 2X4 3X6(R) 3X6 4X6 4X8 3X6 2X4 3X6(R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W4 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H 1024 /- /- /376 /60 /146 F 1024 /- /- /365 /63 /- Wind reactions based on MWFRS H Brg Width = 5.5 Min Req = 1.5 F Brg Width = - Min Req = - Bearing H Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 94 -155 B - C 198 -911 Chords Tens. Comp. C - D 201 -894 D - E 107 -118 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. H - G 828 -118 Chords Tens. Comp. G - F 723 -86 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - H 71 -213 H - B 138 -1080 B - G 167 -251 C - G 441 -98 Webs Tens. Comp. G - D 134 -117 D - F 131 -1053 E - F 66 -181 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025 G 999 240 VERT(CL): 0.037 G 999 180 HORZ(LL): 0.015 E - - HORZ(TL): 0.022 E - - Creep Factor: 2.0 Max TC CSI: 0.316 Max BC CSI: 0.651 Max Web CSI: 0.923 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:B5 Ply: 1 Qty: 3 Wgt: 0.0 lbs SEQN: 126041 / T17 / COMN FROM: BF DRW: ... / ... 03/17/2020 W4 19'5"8 (J)Supporting Member: (2) 5'1"4 5'1"4 10'2"8 5'1"4 14'10" 4'7"8 19'5"8 4'7"8 10'2"8 10'2"8 19'5"8 9'3" 1'8 " 1 3 2'4 " 7 8'6 " 7 A B C D E FGH 8 12 2X4 3X6(R) 3X6 4X6 4X8 3X6 2X4 3X6(R) -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A* 2 /- /- /- /- /- A Brg Width = 99.9 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 1 -1 B - C 1 -1 Chords Tens. Comp. C - D 1 -1 D - E 1 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - H 0 0 H - G 0 0 Chords Tens. Comp. G - F 0 0 F - E 0 0 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B - H 0 -2 C - G 0 -1 Gables Tens. Comp. F - D 0 -2 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: NA Speed: NA mph Enclosure: NA Category: NA EXP: NAKzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 - - 240 VERT(CL): 0.000 F 999 180 HORZ(LL): 0.000 - - - HORZ(TL): 0.000 F - - Creep Factor: 2.0 Max TC CSI: 0.001 Max BC CSI: 0.001 Max Web CSI: 0.001 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:BFL1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126077 / T3 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 8'3"15 2'1"15 2' (TYP) 3'10"15 3'10"15 8'3"15 4'4"15 8'3"15 8'3"15 0"4 4'8 " 1 1 A B C D E FGH 14.42 12 2X4(D8R) 4X6 2X4(D8R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A* 2 /- /- /- /- /- A Brg Width = 99.9 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 1 -1 B - C 1 -1 Chords Tens. Comp. C - D 1 -1 D - E 1 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - H 0 0 H - G 0 0 Chords Tens. Comp. G - F 0 0 F - E 0 0 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B - H 0 -2 C - G 0 -1 Gables Tens. Comp. F - D 0 -2 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: NA Speed: NA mph Enclosure: NA Category: NA EXP: NAKzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 - - 240 VERT(CL): 0.000 F 999 180 HORZ(LL): 0.000 - - - HORZ(TL): 0.000 F - - Creep Factor: 2.0 Max TC CSI: 0.001 Max BC CSI: 0.001 Max Web CSI: 0.001 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:BFL1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126077 / T3 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 8'3"15 2'1"15 2' (TYP) 3'10"15 3'10"15 8'3"15 4'4"15 8'3"15 8'3"15 0"4 4'8 " 1 1 A B C D E FGH 14.42 12 2X4(D8R) 4X6 2X4(D8R) -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H* 244 /- /- /71 /66 /23 Wind reactions based on MWFRS H Brg Width = 132 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 0 B - C 36 -109 C - D 147 -78 D - E 149 -86 Chords Tens. Comp. E - F 149 -86 F - G 147 -104 G - H 95 -135 H - I 156 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 224 -111 N - M 226 -112 M - L 233 -118 Chords Tens. Comp. L - K 233 -118 K - J 226 -117 J - H 221 -116 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - N 67 -142 D - M 206 -441 E - L 0 -364 Gables Tens. Comp. K - F 206 -441 J - G 67 -142 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.002 E 999 240 VERT(CL): 0.002 E 999 180 HORZ(LL): -0.002 N - - HORZ(TL): 0.002 N - - Creep Factor: 2.0 Max TC CSI: 0.409 Max BC CSI: 0.066 Max Web CSI: 0.050 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:C1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125966 / T36 / GABL FROM: BF DRW: ... / ... 03/17/2020 11' 1'6"2' (TYP) 5'6" 5'6" 11' 5'6" 11' 11'1'6"1'6" 4"7 4'0 " 7 5'0 " 3 A B C D E F G H I JKLMN 8 12 2X4(A1T) 4X6 2X4(A1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H* 244 /- /- /71 /66 /23 Wind reactions based on MWFRS H Brg Width = 132 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 0 B - C 36 -109 C - D 147 -78 D - E 149 -86 Chords Tens. Comp. E - F 149 -86 F - G 147 -104 G - H 95 -135 H - I 156 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 224 -111 N - M 226 -112 M - L 233 -118 Chords Tens. Comp. L - K 233 -118 K - J 226 -117 J - H 221 -116 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - N 67 -142 D - M 206 -441 E - L 0 -364 Gables Tens. Comp. K - F 206 -441 J - G 67 -142 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.002 E 999 240 VERT(CL): 0.002 E 999 180 HORZ(LL): -0.002 N - - HORZ(TL): 0.002 N - - Creep Factor: 2.0 Max TC CSI: 0.409 Max BC CSI: 0.066 Max Web CSI: 0.050 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:C1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125966 / T36 / GABL FROM: BF DRW: ... / ... 03/17/2020 11' 1'6"2' (TYP) 5'6" 5'6" 11' 5'6" 11' 11'1'6"1'6" 4"7 4'0 " 7 5'0 " 3 A B C D E F G H I JKLMN 8 12 2X4(A1T) 4X6 2X4(A1T) -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 732 /- /- /299 /56 /108 D 579 /- /- /217 /31 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 D Brg Width = 5.5 Min Req = 1.5 Bearings B & D Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 111 -697 Chords Tens. Comp. C - D 108 -697 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - E 485 -11 Chords Tens. Comp. E - D 485 -11 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - E 219 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.006 E 999 240 VERT(CL): 0.009 E 999 180 HORZ(LL): 0.005 E - - HORZ(TL): 0.007 E - - Creep Factor: 2.0 Max TC CSI: 0.291 Max BC CSI: 0.193 Max Web CSI: 0.067 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:C2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125967 / T31 / SPEC FROM: BF DRW: ... / ... 03/17/2020 11' 5'6" 5'6" 11' 5'6" 5'6" 5'6" 11' 5'6"1'6" 4"7 4'0 " 7 5' 0 " 3 A B C D E 8 12 2X4(A1T) 4X6(R) 2X4 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 732 /- /- /299 /56 /108 D 579 /- /- /217 /31 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 D Brg Width = 5.5 Min Req = 1.5 Bearings B & D Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 111 -697 Chords Tens. Comp. C - D 108 -697 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - E 485 -11 Chords Tens. Comp. E - D 485 -11 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - E 219 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.006 E 999 240 VERT(CL): 0.009 E 999 180 HORZ(LL): 0.005 E - - HORZ(TL): 0.007 E - - Creep Factor: 2.0 Max TC CSI: 0.291 Max BC CSI: 0.193 Max Web CSI: 0.067 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:C2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125967 / T31 / SPEC FROM: BF DRW: ... / ... 03/17/2020 11' 5'6" 5'6" 11' 5'6" 5'6" 5'6" 11' 5'6"1'6" 4"7 4'0 " 7 5' 0 " 3 A B C D E 8 12 2X4(A1T) 4X6(R) 2X4 2X4(A1) -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-12 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 994 /- /- /326 /303 /152 D 994 /- /- /326 /303 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 D Brg Width = 3.5 Min Req = 1.5 Bearings B & D Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 0 B - C 58 -1232 Chords Tens. Comp. C - D 90 -1232 D - E 156 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 939 -133 Chords Tens. Comp. F - D 939 -134 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - F 672 -70 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2012 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.038 F 999 240 VERT(CL): 0.051 F 999 180 HORZ(LL): 0.038 F - - HORZ(TL): 0.051 F - - Creep Factor: 2.0 Max TC CSI: 0.416 Max BC CSI: 0.242 Max Web CSI: 0.145 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:D1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126007 / T19 / GABL FROM: BF DRW: ... / ... 03/17/2020 7'6" 3'9" 3'9" 7'6" 3'9" 3"8 3"8 3'9" 3'5"8 7'2"8 3'5"8 7'6" 3"8 1'6"1'6" 4"7 1'5 " 5 2'1 0 " 7 3' 1 0 " 3 A B C D E F 8 12 5 12 4X6 4X6(R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-12 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 994 /- /- /326 /303 /152 D 994 /- /- /326 /303 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 D Brg Width = 3.5 Min Req = 1.5 Bearings B & D Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 0 B - C 58 -1232 Chords Tens. Comp. C - D 90 -1232 D - E 156 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 939 -133 Chords Tens. Comp. F - D 939 -134 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - F 672 -70 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2012 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.038 F 999 240 VERT(CL): 0.051 F 999 180 HORZ(LL): 0.038 F - - HORZ(TL): 0.051 F - - Creep Factor: 2.0 Max TC CSI: 0.416 Max BC CSI: 0.242 Max Web CSI: 0.145 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:D1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126007 / T19 / GABL FROM: BF DRW: ... / ... 03/17/2020 7'6" 3'9" 3'9" 7'6" 3'9" 3"8 3"8 3'9" 3'5"8 7'2"8 3'5"8 7'6" 3"8 1'6"1'6" 4"7 1'5 " 5 2'1 0 " 7 3' 1 0 " 3 A B C D E F 8 12 5 12 4X6 4X6(R) D2T4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-12 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 559 /- /- /234 /41 /99 D 559 /- /- /234 /41 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 D Brg Width = 3.5 Min Req = 1.5 Bearings B & D Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 11 -871 Chords Tens. Comp. C - D 32 -871 D - E 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 725 -65 Chords Tens. Comp. F - D 725 -65 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 597 -16 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2012 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.020 F 999 240 VERT(CL): 0.030 F 999 180 HORZ(LL): 0.020 F - - HORZ(TL): 0.031 F - - Creep Factor: 2.0 Max TC CSI: 0.194 Max BC CSI: 0.149 Max Web CSI: 0.200 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:D2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125965 / T4 / COMN FROM: BF DRW: ... / ... 03/17/2020 7'6" 3'9" 3'9" 7'6" 3'9" 3"8 3"8 3'9" 3'5"8 7'2"8 3'5"8 7'6" 3"8 1'6"1'6" 4"7 1'5 " 5 2'1 0 " 7 3' 1 0 " 3 A B C D E F 8 12 5 12 2X4(A1T) 4X6 4X6(R) 2X4(A1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-12 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 559 /- /- /234 /41 /99 D 559 /- /- /234 /41 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 D Brg Width = 3.5 Min Req = 1.5 Bearings B & D Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 11 -871 Chords Tens. Comp. C - D 32 -871 D - E 78 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 725 -65 Chords Tens. Comp. F - D 725 -65 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 597 -16 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2012 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.020 F 999 240 VERT(CL): 0.030 F 999 180 HORZ(LL): 0.020 F - - HORZ(TL): 0.031 F - - Creep Factor: 2.0 Max TC CSI: 0.194 Max BC CSI: 0.149 Max Web CSI: 0.200 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:D2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 125965 / T4 / COMN FROM: BF DRW: ... / ... 03/17/2020 7'6" 3'9" 3'9" 7'6" 3'9" 3"8 3"8 3'9" 3'5"8 7'2"8 3'5"8 7'6" 3"8 1'6"1'6" 4"7 1'5 " 5 2'1 0 " 7 3' 1 0 " 3 A B C D E F 8 12 5 12 2X4(A1T) 4X6 4X6(R) 2X4(A1T) -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-12 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 400 /- /- /149 /24 /56 C 400 /- /- /149 /24 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req = 1.5 C Brg Width = 3.5 Min Req = 1.5 Bearings A & C Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 105 -871 Chords Tens. Comp. B - C 105 -871 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - D 725 -38 Chords Tens. Comp. D - C 725 -38 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - D 597 -7 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2012 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 D 999 240 VERT(CL): 0.030 D 999 180 HORZ(LL): 0.021 D - - HORZ(TL): 0.031 D - - Creep Factor: 2.0 Max TC CSI: 0.114 Max BC CSI: 0.139 Max Web CSI: 0.200 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:D3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126005 / T25 / COMN FROM: BF DRW: ... / ... 03/17/2020 7'6" 3'9" 3'9" 7'6" 3'9" 3"8 3"8 3'9" 3'5"8 7'2"8 3'5"8 7'6" 3"8 4"7 1'5 " 5 2'1 0 " 7 A B C D 8 12 5 12 2X4(A1) 4X6 4X6(R) 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-12 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 400 /- /- /149 /24 /56 C 400 /- /- /149 /24 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req = 1.5 C Brg Width = 3.5 Min Req = 1.5 Bearings A & C Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 105 -871 Chords Tens. Comp. B - C 105 -871 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - D 725 -38 Chords Tens. Comp. D - C 725 -38 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - D 597 -7 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2012 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 D 999 240 VERT(CL): 0.030 D 999 180 HORZ(LL): 0.021 D - - HORZ(TL): 0.031 D - - Creep Factor: 2.0 Max TC CSI: 0.114 Max BC CSI: 0.139 Max Web CSI: 0.200 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:D3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126005 / T25 / COMN FROM: BF DRW: ... / ... 03/17/2020 7'6" 3'9" 3'9" 7'6" 3'9" 3"8 3"8 3'9" 3'5"8 7'2"8 3'5"8 7'6" 3"8 4"7 1'5 " 5 2'1 0 " 7 A B C D 8 12 5 12 2X4(A1) 4X6 4X6(R) 2X4(A1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W3,W7 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at -1.66 to 89 plf at 6.00 TC: From 45 plf at 6.00 to 45 plf at 16.00 TC: From 89 plf at 16.00 to 89 plf at 34.00 BC: From 16 plf at 0.00 to 16 plf at 6.01 BC: From 8 plf at 6.01 to 8 plf at 14.06 BC: From 16 plf at 14.06 to 16 plf at 34.00 BC: 678 lb Conc. Load at 6.01 BC: 312 lb Conc. Load at 8.06,10.06,12.06,14.06 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1359 /- /- /- /155 /- N 3016 /- /- /- /323 /- J 856 /- /- /- /45 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 N Brg Width = 5.5 Min Req = 2.8 J Brg Width = - Min Req = - Bearings B & N Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 -14 B - C 255 -2053 C - D 228 -1894 D - E 181 -1520 E - F 637 -61 Chords Tens. Comp. F - G 637 -61 G - H 74 -575 H - I 53 -1102 I - J 82 -1265 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - O 1634 -196 O - N 22 -245 N - M 568 -79 Chords Tens. Comp. M - L 568 -79 L - K 880 -43 K - J 999 -58 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - O 28 -124 O - D 684 -61 O - E 1796 -204 E - N 175 -1301 N - G 82 -1382 Webs Tens. Comp. G - L 275 0 L - H 47 -391 H - K 278 0 K - I 23 -124 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.039 O 999 240 VERT(CL): 0.060 O 999 180 HORZ(LL): 0.012 C - - HORZ(TL): 0.018 C - - Creep Factor: 2.0 Max TC CSI: 0.905 Max BC CSI: 0.667 Max Web CSI: 0.436 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126048 / T20 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W3 W7 14'9"4 19'2"12 (J)Supporting Member: (2) 3'0"2 3'0"2 6' 2'11"14 13'4" 7'4" 20'8" 7'4" 28' 7'4" 30'11"14 2'11"14 34' 3'0"2 6' 6' 14'9"4 8'9"4 20'8" 5'10"12 28' 7'4" 34' 6'1'6" 4"7 4'4 " 7 5'4 " 3 (a)(a) DT -1"4 A B C D E F G H I J KLMNO 8 12 3X6(A1T) 2X4 6X10 4X6(R) 4X6 3X6 3X6 4X6 3X6 3X6 5X6(R) 3X6 2X4 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W3,W7 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at -1.66 to 89 plf at 6.00 TC: From 45 plf at 6.00 to 45 plf at 16.00 TC: From 89 plf at 16.00 to 89 plf at 34.00 BC: From 16 plf at 0.00 to 16 plf at 6.01 BC: From 8 plf at 6.01 to 8 plf at 14.06 BC: From 16 plf at 14.06 to 16 plf at 34.00 BC: 678 lb Conc. Load at 6.01 BC: 312 lb Conc. Load at 8.06,10.06,12.06,14.06 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1359 /- /- /- /155 /- N 3016 /- /- /- /323 /- J 856 /- /- /- /45 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 N Brg Width = 5.5 Min Req = 2.8 J Brg Width = - Min Req = - Bearings B & N Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 -14 B - C 255 -2053 C - D 228 -1894 D - E 181 -1520 E - F 637 -61 Chords Tens. Comp. F - G 637 -61 G - H 74 -575 H - I 53 -1102 I - J 82 -1265 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - O 1634 -196 O - N 22 -245 N - M 568 -79 Chords Tens. Comp. M - L 568 -79 L - K 880 -43 K - J 999 -58 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - O 28 -124 O - D 684 -61 O - E 1796 -204 E - N 175 -1301 N - G 82 -1382 Webs Tens. Comp. G - L 275 0 L - H 47 -391 H - K 278 0 K - I 23 -124 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.039 O 999 240 VERT(CL): 0.060 O 999 180 HORZ(LL): 0.012 C - - HORZ(TL): 0.018 C - - Creep Factor: 2.0 Max TC CSI: 0.905 Max BC CSI: 0.667 Max Web CSI: 0.436 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126048 / T20 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W3 W7 14'9"4 19'2"12 (J)Supporting Member: (2) 3'0"2 3'0"2 6' 2'11"14 13'4" 7'4" 20'8" 7'4" 28' 7'4" 30'11"14 2'11"14 34' 3'0"2 6' 6' 14'9"4 8'9"4 20'8" 5'10"12 28' 7'4" 34' 6'1'6" 4"7 4'4 " 7 5'4 " 3 (a)(a) DT -1"4 A B C D E F G H I J KLMNO 8 12 3X6(A1T) 2X4 6X10 4X6(R) 4X6 3X6 3X6 4X6 3X6 3X6 5X6(R) 3X6 2X4 3X6(A1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3,W7 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 943 /- /- /380 /85 /148 K 2365 /- /- /805 /137 /- I 647 /-46 /- /246 /46 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 K Brg Width = 5.5 Min Req = 2.1 I Brg Width = - Min Req = - Bearings B & K Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 215 -1686 C - D 344 -1547 D - E 221 -1151 Chords Tens. Comp. E - F 910 0 F - G 251 -385 G - H 322 -537 H - I 247 -829 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - M 1354 -91 M - L 153 -68 L - K 125 -51 Chords Tens. Comp. K - J 132 -723 J - I 622 -176 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 250 -427 M - D 615 -171 M - E 1117 -72 L - E 194 0 E - K 210 -1418 Webs Tens. Comp. K - F 234 -1226 F - J 1032 -105 G - J 67 -363 J - H 130 -327 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.056 C 999 240 VERT(CL): 0.089 C 999 180 HORZ(LL): 0.034 K - - HORZ(TL): 0.056 K - - Creep Factor: 2.0 Max TC CSI: 0.630 Max BC CSI: 0.320 Max Web CSI: 0.650 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126025 / T15 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W3 W7 19'3"4 14'8"12 (J)Supporting Member: (2) 8' 8' 14'6"8 6'6"8 20'3"4 5'8"12 26' 5'8"12 29'9"9 3'9"9 34' 4'2"7 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'3"4 4'8"12 26' 6'8"12 34' 8'1'6" 4"7 2' 4 " 3 5'8 " 7 6'8 " 3 (a) DT -1"13 A B C D E F G H I JKL M 8 12 4 12 3X6(F2T) 2X4 7X14 5X6(R) 5X6 4X8 3X6 4X6 4X6(R) 4X8 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W3,W7 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 943 /- /- /380 /85 /148 K 2365 /- /- /805 /137 /- I 647 /-46 /- /246 /46 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 K Brg Width = 5.5 Min Req = 2.1 I Brg Width = - Min Req = - Bearings B & K Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 215 -1686 C - D 344 -1547 D - E 221 -1151 Chords Tens. Comp. E - F 910 0 F - G 251 -385 G - H 322 -537 H - I 247 -829 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - M 1354 -91 M - L 153 -68 L - K 125 -51 Chords Tens. Comp. K - J 132 -723 J - I 622 -176 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 250 -427 M - D 615 -171 M - E 1117 -72 L - E 194 0 E - K 210 -1418 Webs Tens. Comp. K - F 234 -1226 F - J 1032 -105 G - J 67 -363 J - H 130 -327 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.056 C 999 240 VERT(CL): 0.089 C 999 180 HORZ(LL): 0.034 K - - HORZ(TL): 0.056 K - - Creep Factor: 2.0 Max TC CSI: 0.630 Max BC CSI: 0.320 Max Web CSI: 0.650 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126025 / T15 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W3 W7 19'3"4 14'8"12 (J)Supporting Member: (2) 8' 8' 14'6"8 6'6"8 20'3"4 5'8"12 26' 5'8"12 29'9"9 3'9"9 34' 4'2"7 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'3"4 4'8"12 26' 6'8"12 34' 8'1'6" 4"7 2' 4 " 3 5'8 " 7 6'8 " 3 (a) DT -1"13 A B C D E F G H I JKL M 8 12 4 12 3X6(F2T) 2X4 7X14 5X6(R) 5X6 4X8 3X6 4X6 4X6(R) 4X8 2X4 3X6(B1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W4,W6 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 917 /- /- /369 /79 /178 K 2470 /- /- /868 /144 /- I 615 /-99 /- /254 /67 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 K Brg Width = 5.5 Min Req = 2.3 I Brg Width = - Min Req = - Bearings B & K Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 178 -1573 C - D 209 -756 D - E 145 -57 Chords Tens. Comp. E - F 840 0 F - G 842 0 G - H 478 -333 H - I 383 -728 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 1250 -89 N - M 1217 -78 M - L 519 -29 Chords Tens. Comp. L - K 94 -100 K - J 137 -396 J - I 532 -281 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. N - C 880 0 C - M 189 -1172 M - D 821 -93 D - L 38 -813 L - E 623 -3 Webs Tens. Comp. E - K 176 -1297 K - G 113 -1096 F - K 141 -443 G - J 437 -34 J - H 188 -485 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.053 N 999 240 VERT(CL): 0.087 N 999 180 HORZ(LL): 0.035 J - - HORZ(TL): 0.058 L - - Creep Factor: 2.0 Max TC CSI: 0.606 Max BC CSI: 0.385 Max Web CSI: 0.960 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126023 / T35 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W4 W6 W6 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 10' 2'6" 14'6"8 4'6"8 19'5" 4'10"8 24' 4'7" 28'9"9 4'9"9 34' 5'2"7 5"8 5"8 7'6" 7'0"8 10' 2'6" 14'6"8 4'6"8 19'5" 4'10"8 24' 4'7" 34' 10'1'6" 4"7 2'4 " 3 7'0 " 7 8'0 " 3 (a) DT -1"13 A B C D E F G H I JKL M N 8 12 4 12 3X6(F2T) 5X6 3X6 3X6 5X6 5X6 3X6 2X4 4X8 5X6 3X6 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W4,W6 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 917 /- /- /369 /79 /178 K 2470 /- /- /868 /144 /- I 615 /-99 /- /254 /67 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 K Brg Width = 5.5 Min Req = 2.3 I Brg Width = - Min Req = - Bearings B & K Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 178 -1573 C - D 209 -756 D - E 145 -57 Chords Tens. Comp. E - F 840 0 F - G 842 0 G - H 478 -333 H - I 383 -728 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 1250 -89 N - M 1217 -78 M - L 519 -29 Chords Tens. Comp. L - K 94 -100 K - J 137 -396 J - I 532 -281 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. N - C 880 0 C - M 189 -1172 M - D 821 -93 D - L 38 -813 L - E 623 -3 Webs Tens. Comp. E - K 176 -1297 K - G 113 -1096 F - K 141 -443 G - J 437 -34 J - H 188 -485 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.053 N 999 240 VERT(CL): 0.087 N 999 180 HORZ(LL): 0.035 J - - HORZ(TL): 0.058 L - - Creep Factor: 2.0 Max TC CSI: 0.606 Max BC CSI: 0.385 Max Web CSI: 0.960 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126023 / T35 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W4 W6 W6 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 10' 2'6" 14'6"8 4'6"8 19'5" 4'10"8 24' 4'7" 28'9"9 4'9"9 34' 5'2"7 5"8 5"8 7'6" 7'0"8 10' 2'6" 14'6"8 4'6"8 19'5" 4'10"8 24' 4'7" 34' 10'1'6" 4"7 2'4 " 3 7'0 " 7 8'0 " 3 (a) DT -1"13 A B C D E F G H I JKL M N 8 12 4 12 3X6(F2T) 5X6 3X6 3X6 5X6 5X6 3X6 2X4 4X8 5X6 3X6 2X4 3X6(B1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W4,W5,W6,W7, W8 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 879 /- /- /339 /86 /208 K 2521 /- /- /950 /116 /- H 612 /-130 /- /257 /98 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 K Brg Width = 5.5 Min Req = 2.3 H Brg Width = - Min Req = - Bearings B & K Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 197 -1464 C - D 194 -389 D - E 189 -51 Chords Tens. Comp. E - F 820 0 F - G 622 -148 G - H 417 -727 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 1158 -135 N - M 1129 -128 M - L 185 -59 L - K 96 -114 Chords Tens. Comp. K - J 148 -509 J - I 501 -314 I - H 503 -312 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. N - C 835 -18 C - M 208 -1216 M - D 609 -66 D - L 41 -635 L - E 617 0 Webs Tens. Comp. E - K 215 -1442 K - F 162 -1240 F - J 450 -73 J - G 192 -679 G - I 242 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.053 N 999 240 VERT(CL): 0.085 N 999 180 HORZ(LL): 0.034 L - - HORZ(TL): 0.056 L - - Creep Factor: 2.0 Max TC CSI: 0.827 Max BC CSI: 0.320 Max Web CSI: 0.765 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E4 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126021 / T22 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W4 W5 W6 W7 W8 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 12' 4'6" 14'6"8 2'6"8 22' 7'5"8 27'9"9 5'9"9 34' 6'2"7 5"8 5"8 7'6" 7'0"8 12' 4'6" 14'6"8 2'6"8 19'3"4 4'8"12 22' 2'8"12 27'9"9 5'9"9 34' 6'2"71'6" 4"7 2'4 " 3 8'4 " 7 9'4 " 3 (a)(a)(a) DT -1"13 A B C D E F G H IJKL M N 8 12 4 12 3X6(F2T) 5X6 3X6 3X6 5X6 5X6 4X6 3X6 5X6 3X6 3X6 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; W4,W5,W6,W7, W8 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 879 /- /- /339 /86 /208 K 2521 /- /- /950 /116 /- H 612 /-130 /- /257 /98 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 K Brg Width = 5.5 Min Req = 2.3 H Brg Width = - Min Req = - Bearings B & K Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 197 -1464 C - D 194 -389 D - E 189 -51 Chords Tens. Comp. E - F 820 0 F - G 622 -148 G - H 417 -727 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 1158 -135 N - M 1129 -128 M - L 185 -59 L - K 96 -114 Chords Tens. Comp. K - J 148 -509 J - I 501 -314 I - H 503 -312 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. N - C 835 -18 C - M 208 -1216 M - D 609 -66 D - L 41 -635 L - E 617 0 Webs Tens. Comp. E - K 215 -1442 K - F 162 -1240 F - J 450 -73 J - G 192 -679 G - I 242 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.053 N 999 240 VERT(CL): 0.085 N 999 180 HORZ(LL): 0.034 L - - HORZ(TL): 0.056 L - - Creep Factor: 2.0 Max TC CSI: 0.827 Max BC CSI: 0.320 Max Web CSI: 0.765 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E4 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126021 / T22 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W4 W5 W6 W7 W8 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 12' 4'6" 14'6"8 2'6"8 22' 7'5"8 27'9"9 5'9"9 34' 6'2"7 5"8 5"8 7'6" 7'0"8 12' 4'6" 14'6"8 2'6"8 19'3"4 4'8"12 22' 2'8"12 27'9"9 5'9"9 34' 6'2"71'6" 4"7 2'4 " 3 8'4 " 7 9'4 " 3 (a)(a)(a) DT -1"13 A B C D E F G H IJKL M N 8 12 4 12 3X6(F2T) 5X6 3X6 3X6 5X6 5X6 4X6 3X6 5X6 3X6 3X6 2X4 3X6(B1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W7 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Negative reaction(s) of -223# MAX. from a non-wind load case requires uplift connection. See Maximum Reactions. Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 807 /- /- /294 /74 /237 I 2680 /- /- /1067 /136 /- G 586 /-223 /- /248 /130 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 I Brg Width = 5.5 Min Req = 2.5 G Brg Width = - Min Req = - Bearings B & I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 146 -1284 C - D 345 -1296 Chords Tens. Comp. D - E 818 -16 E - F 596 -667 F - G 611 -639 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1013 -147 K - J 184 -202 J - I 164 -166 Chords Tens. Comp. I - H 224 -706 H - G 418 -468 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 296 -694 K - D 1511 -246 D - J 225 0 D - I 161 -1325 Webs Tens. Comp. I - E 248 -1440 E - H 1083 -293 H - F 303 -723 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.060 C 999 240 VERT(CL): 0.096 C 999 180 HORZ(LL): 0.036 C - - HORZ(TL): 0.057 C - - Creep Factor: 2.0 Max TC CSI: 0.768 Max BC CSI: 0.312 Max Web CSI: 0.536 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E5 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126019 / T23 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W1 W7 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 14' 6'6" 20' 6' 26'9"9 6'9"9 34' 7'2"7 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'3"4 4'8"12 26'9"9 7'6"5 34' 7'2"71'6" 4"7 2'4 " 3 9'8 " 7 10 ' 8 " 3 (a)(a) DT -1"13 A B C D E F G HIJ K 8 12 4 12 3X6(F2T) 2X4 5X8 6X10 5X6 3X6 5X6 4X6 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W7 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Negative reaction(s) of -223# MAX. from a non-wind load case requires uplift connection. See Maximum Reactions. Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 807 /- /- /294 /74 /237 I 2680 /- /- /1067 /136 /- G 586 /-223 /- /248 /130 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 I Brg Width = 5.5 Min Req = 2.5 G Brg Width = - Min Req = - Bearings B & I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 146 -1284 C - D 345 -1296 Chords Tens. Comp. D - E 818 -16 E - F 596 -667 F - G 611 -639 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1013 -147 K - J 184 -202 J - I 164 -166 Chords Tens. Comp. I - H 224 -706 H - G 418 -468 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 296 -694 K - D 1511 -246 D - J 225 0 D - I 161 -1325 Webs Tens. Comp. I - E 248 -1440 E - H 1083 -293 H - F 303 -723 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.060 C 999 240 VERT(CL): 0.096 C 999 180 HORZ(LL): 0.036 C - - HORZ(TL): 0.057 C - - Creep Factor: 2.0 Max TC CSI: 0.768 Max BC CSI: 0.312 Max Web CSI: 0.536 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E5 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126019 / T23 / HIPS FROM: BF DRW: ... / ... 03/17/2020 W1 W7 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 14' 6'6" 20' 6' 26'9"9 6'9"9 34' 7'2"7 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'3"4 4'8"12 26'9"9 7'6"5 34' 7'2"71'6" 4"7 2'4 " 3 9'8 " 7 10 ' 8 " 3 (a)(a) DT -1"13 A B C D E F G HIJ K 8 12 4 12 3X6(F2T) 2X4 5X8 6X10 5X6 3X6 5X6 4X6 2X4 3X6(B1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W7 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 932 /- /- /344 /68 /245 I 2340 /- /- /967 /- /- G 685 /-76 /- /297 /104 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 I Brg Width = 5.5 Min Req = 2.1 G Brg Width = - Min Req = - Bearings B & I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 141 -1659 C - D 345 -1662 Chords Tens. Comp. D - E 495 -48 E - F 376 -798 F - G 379 -784 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1334 -119 K - J 190 -65 J - I 168 -47 Chords Tens. Comp. I - H 368 -915 H - G 531 -275 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 300 -668 K - D 1683 -248 D - J 252 -8 D - I 52 -1249 Webs Tens. Comp. I - E 112 -1196 E - H 1010 -290 H - F 305 -701 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.099 C 999 240 VERT(CL): 0.141 C 999 180 HORZ(LL): 0.057 C - - HORZ(TL): 0.086 C - - Creep Factor: 2.0 Max TC CSI: 0.633 Max BC CSI: 0.569 Max Web CSI: 0.569 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E6 Ply: 1 Qty: 4 Wgt: 0.0 lbs SEQN: 126017 / T43 / COMN FROM: BF DRW: ... / ... 03/17/2020 W1 W7 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 26'6"11 7'0"7 34' 7'5"5 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'3"4 4'8"12 26'6"11 7'3"7 34' 7'5"51'6" 4"7 2' 4 " 3 10 ' 0 " 4 11 ' (a)(a) A B C D E F G HIJ K 8 12 4 12 3X6(F2T) 2X4 6X10 8X8 5X6 3X6 SS0607 3X6 2X4 3X6(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W7 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Shim all supports to solid bearing. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 932 /- /- /344 /68 /245 I 2340 /- /- /967 /- /- G 685 /-76 /- /297 /104 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 I Brg Width = 5.5 Min Req = 2.1 G Brg Width = - Min Req = - Bearings B & I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 141 -1659 C - D 345 -1662 Chords Tens. Comp. D - E 495 -48 E - F 376 -798 F - G 379 -784 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1334 -119 K - J 190 -65 J - I 168 -47 Chords Tens. Comp. I - H 368 -915 H - G 531 -275 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 300 -668 K - D 1683 -248 D - J 252 -8 D - I 52 -1249 Webs Tens. Comp. I - E 112 -1196 E - H 1010 -290 H - F 305 -701 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.099 C 999 240 VERT(CL): 0.141 C 999 180 HORZ(LL): 0.057 C - - HORZ(TL): 0.086 C - - Creep Factor: 2.0 Max TC CSI: 0.633 Max BC CSI: 0.569 Max Web CSI: 0.569 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E6 Ply: 1 Qty: 4 Wgt: 0.0 lbs SEQN: 126017 / T43 / COMN FROM: BF DRW: ... / ... 03/17/2020 W1 W7 19'3"4 14'8"12 (J)Supporting Member: (2) 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 26'6"11 7'0"7 34' 7'5"5 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'3"4 4'8"12 26'6"11 7'3"7 34' 7'5"51'6" 4"7 2' 4 " 3 10 ' 0 " 4 11 ' (a)(a) A B C D E F G HIJ K 8 12 4 12 3X6(F2T) 2X4 6X10 8X8 5X6 3X6 SS0607 3X6 2X4 3X6(B1) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x4 DF-L #1&Bet.; B1 2x4 DF-L 2400f-2.0E; Webs: 2x4 DF-L #1&Bet.; W1,W7,W8, W9 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right cantilever is exposed to wind Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1832 /- /- /720 /124 /262 J 2064 /- /- /837 /130 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.7 J Brg Width = 5.5 Min Req = 1.8 Bearings B & J Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 468 -4493 C - D 662 -4457 D - E 349 -1381 Chords Tens. Comp. E - F 339 -1760 F - G 264 -1901 G - H 519 -215 H - I 79 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 3774 -269 N - M 1471 -4 M - L 1314 0 Chords Tens. Comp. L - K 1508 -71 K - J 248 -362 J - H 256 -399 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 286 -597 N - D 3163 -376 D - M 143 -471 M - E 179 -99 E - L 273 -13 Webs Tens. Comp. L - F 124 -242 F - K 150 -425 K - G 1726 -269 G - J 378 -1980 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.309 C 999 240 VERT(CL): 0.464 C 818 180 HORZ(LL): 0.181 J - - HORZ(TL): 0.273 J - - Creep Factor: 2.0 Max TC CSI: 0.848 Max BC CSI: 0.710 Max Web CSI: 0.578 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E7 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126011 / T45 / COMN FROM: BF DRW: ... / ... 03/17/2020 T1 B1 W1 W7 W8 W9 32'2' 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 26'6"11 7'0"7 31'9"4 5'2"9 34' 2'2"12 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'6"5 4'11"13 26'6"11 7'0"7 31'9"4 5'2"9 34' 2'2"121'6" 1'6" 4"7 2'4 " 3 10 ' 0 " 4 11 ' (a) (a) A B C D E F G H IJKLM N 8 12 4 12 4X8(F2T) 2X4 H0612 6X10 5X8 6X6 3X6 3X6 4X6 5X6 3X6 3X6(B1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x4 DF-L #1&Bet.; B1 2x4 DF-L 2400f-2.0E; Webs: 2x4 DF-L #1&Bet.; W1,W7,W8, W9 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right cantilever is exposed to wind Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1832 /- /- /720 /124 /262 J 2064 /- /- /837 /130 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.7 J Brg Width = 5.5 Min Req = 1.8 Bearings B & J Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 468 -4493 C - D 662 -4457 D - E 349 -1381 Chords Tens. Comp. E - F 339 -1760 F - G 264 -1901 G - H 519 -215 H - I 79 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 3774 -269 N - M 1471 -4 M - L 1314 0 Chords Tens. Comp. L - K 1508 -71 K - J 248 -362 J - H 256 -399 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 286 -597 N - D 3163 -376 D - M 143 -471 M - E 179 -99 E - L 273 -13 Webs Tens. Comp. L - F 124 -242 F - K 150 -425 K - G 1726 -269 G - J 378 -1980 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.309 C 999 240 VERT(CL): 0.464 C 818 180 HORZ(LL): 0.181 J - - HORZ(TL): 0.273 J - - Creep Factor: 2.0 Max TC CSI: 0.848 Max BC CSI: 0.710 Max Web CSI: 0.578 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E7 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126011 / T45 / COMN FROM: BF DRW: ... / ... 03/17/2020 T1 B1 W1 W7 W8 W9 32'2' 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 26'6"11 7'0"7 31'9"4 5'2"9 34' 2'2"12 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'6"5 4'11"13 26'6"11 7'0"7 31'9"4 5'2"9 34' 2'2"121'6" 1'6" 4"7 2'4 " 3 10 ' 0 " 4 11 ' (a) (a) A B C D E F G H IJKLM N 8 12 4 12 4X8(F2T) 2X4 H0612 6X10 5X8 6X6 3X6 3X6 4X6 5X6 3X6 3X6(B1T) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x4 DF-L #1&Bet.; B1 2x4 DF-L 2400f-2.0E; Webs: 2x4 DF-L #1&Bet.; W1,W7,W8, W9 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right cantilever is exposed to wind Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1854 /- /- /728 /125 /262 J 2038 /- /- /819 /131 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.7 J Brg Width = 7.8 Min Req = 2.2 Bearings B & J Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 480 -4564 C - D 673 -4527 D - E 354 -1414 Chords Tens. Comp. E - F 348 -1814 F - G 285 -2063 G - H 460 -204 H - I 79 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 3835 -279 N - M 1505 0 M - L 1358 0 Chords Tens. Comp. L - K 1626 -90 K - J 235 -318 J - H 245 -359 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 285 -595 N - D 3199 -382 D - M 145 -458 M - E 171 -104 E - L 303 -22 Webs Tens. Comp. L - F 139 -333 F - K 133 -314 K - G 1744 -266 G - J 373 -1945 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.317 C 999 240 VERT(CL): 0.475 C 809 180 HORZ(LL): 0.185 J - - HORZ(TL): 0.279 J - - Creep Factor: 2.0 Max TC CSI: 0.865 Max BC CSI: 0.724 Max Web CSI: 0.584 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E8 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126013 / T42 / COMN FROM: BF DRW: ... / ... 03/17/2020 T1 B1 W1 W7 W8 W9 32'6"1'6" 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 26'6"11 7'0"7 32'2"2 5'7"6 34' 1'9"14 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'6"5 4'11"13 26'6"11 7'0"7 32'2"2 5'7"6 34' 1'9"141'6" 1'6" 4"7 2'4 " 3 10 ' 0 " 4 11 ' (a) (a) A B C D E F G H IJKLM N 8 12 4 12 4X8(F2T) 2X4 H0612 6X10 5X8 6X6 3X6 3X6 5X6 5X6 3X6 3X6(B1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x4 DF-L #1&Bet.; B1 2x4 DF-L 2400f-2.0E; Webs: 2x4 DF-L #1&Bet.; W1,W7,W8, W9 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right cantilever is exposed to wind Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1854 /- /- /728 /125 /262 J 2038 /- /- /819 /131 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.7 J Brg Width = 7.8 Min Req = 2.2 Bearings B & J Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 480 -4564 C - D 673 -4527 D - E 354 -1414 Chords Tens. Comp. E - F 348 -1814 F - G 285 -2063 G - H 460 -204 H - I 79 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 3835 -279 N - M 1505 0 M - L 1358 0 Chords Tens. Comp. L - K 1626 -90 K - J 235 -318 J - H 245 -359 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 285 -595 N - D 3199 -382 D - M 145 -458 M - E 171 -104 E - L 303 -22 Webs Tens. Comp. L - F 139 -333 F - K 133 -314 K - G 1744 -266 G - J 373 -1945 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.317 C 999 240 VERT(CL): 0.475 C 809 180 HORZ(LL): 0.185 J - - HORZ(TL): 0.279 J - - Creep Factor: 2.0 Max TC CSI: 0.865 Max BC CSI: 0.724 Max Web CSI: 0.584 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E8 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126013 / T42 / COMN FROM: BF DRW: ... / ... 03/17/2020 T1 B1 W1 W7 W8 W9 32'6"1'6" 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 26'6"11 7'0"7 32'2"2 5'7"6 34' 1'9"14 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'6"5 4'11"13 26'6"11 7'0"7 32'2"2 5'7"6 34' 1'9"141'6" 1'6" 4"7 2'4 " 3 10 ' 0 " 4 11 ' (a) (a) A B C D E F G H IJKLM N 8 12 4 12 4X8(F2T) 2X4 H0612 6X10 5X8 6X6 3X6 3X6 5X6 5X6 3X6 3X6(B1T) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right cantilever is exposed to wind Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1822 /- /- /719 /125 /262 I 2061 /- /- /834 /131 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.6 I Brg Width = 5.5 Min Req = 1.8 Bearings B & I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 339 -2514 C - D 355 -1831 D - E 342 -1313 Chords Tens. Comp. E - F 344 -1766 F - G 807 -247 G - H 79 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 1956 -139 N - M 1954 -140 M - L 1366 0 L - K 1366 0 Chords Tens. Comp. K - J 1525 -82 J - I 1523 -83 I - G 323 -507 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. N - C 275 0 C - M 204 -728 D - M 511 -64 D - K 100 -161 Webs Tens. Comp. K - E 358 -37 K - F 134 -264 J - F 232 0 F - I 498 -2684 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.085 M 999 240 VERT(CL): 0.126 M 999 180 HORZ(LL): 0.044 I - - HORZ(TL): 0.066 I - - Creep Factor: 2.0 Max TC CSI: 0.870 Max BC CSI: 0.382 Max Web CSI: 0.551 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E-9 Ply: 1 Qty: 3 Wgt: 0.0 lbs SEQN: 126085 / T44 / COMN FROM: BF DRW: ... / ... 03/17/2020 W1 W1 32'2' 7'5"5 7'5"5 14'5"11 7'0"7 19'6"5 5'0"10 26'6"11 7'0"7 34' 7'5"5 7'5"5 7'5"5 14'5"11 7'0"7 19'6"5 5'0"10 26'6"11 7'0"7 31'9"4 5'2"9 34' 2'2"121'6" 1'6" 4"7 10 ' 0 " 4 11 ' (a) (a) (a) (a) A B C D E F G HIJKLMN 8 12 4X6(B1T) 2X4 3X6 6X6 3X6 3X6 4X8 5X6 2X4 H0612 3X6 3X6(B1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right cantilever is exposed to wind Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1822 /- /- /719 /125 /262 I 2061 /- /- /834 /131 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.6 I Brg Width = 5.5 Min Req = 1.8 Bearings B & I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 339 -2514 C - D 355 -1831 D - E 342 -1313 Chords Tens. Comp. E - F 344 -1766 F - G 807 -247 G - H 79 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 1956 -139 N - M 1954 -140 M - L 1366 0 L - K 1366 0 Chords Tens. Comp. K - J 1525 -82 J - I 1523 -83 I - G 323 -507 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. N - C 275 0 C - M 204 -728 D - M 511 -64 D - K 100 -161 Webs Tens. Comp. K - E 358 -37 K - F 134 -264 J - F 232 0 F - I 498 -2684 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.40 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.085 M 999 240 VERT(CL): 0.126 M 999 180 HORZ(LL): 0.044 I - - HORZ(TL): 0.066 I - - Creep Factor: 2.0 Max TC CSI: 0.870 Max BC CSI: 0.382 Max Web CSI: 0.551 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E-9 Ply: 1 Qty: 3 Wgt: 0.0 lbs SEQN: 126085 / T44 / COMN FROM: BF DRW: ... / ... 03/17/2020 W1 W1 32'2' 7'5"5 7'5"5 14'5"11 7'0"7 19'6"5 5'0"10 26'6"11 7'0"7 34' 7'5"5 7'5"5 7'5"5 14'5"11 7'0"7 19'6"5 5'0"10 26'6"11 7'0"7 31'9"4 5'2"9 34' 2'2"121'6" 1'6" 4"7 10 ' 0 " 4 11 ' (a) (a) (a) (a) A B C D E F G HIJKLMN 8 12 4X6(B1T) 2X4 3X6 6X6 3X6 3X6 4X8 5X6 2X4 H0612 3X6 3X6(B1T) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W8 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1741 /- /- /692 /51 /221 H 1574 /- /- /566 /18 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.7 H Brg Width = 5.5 Min Req = 1.7 Bearings B & H Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 300 -4205 C - D 501 -4169 Chords Tens. Comp. D - E 202 -1246 E - F 173 -1504 F - G 121 -134 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 3525 -264 K - J 1331 0 Chords Tens. Comp. J - I 1131 0 I - H 1110 -58 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 294 -597 K - D 3012 -390 D - J 105 -536 J - E 251 -99 Webs Tens. Comp. E - I 256 -39 I - F 179 -56 F - H 97 -1689 G - H 70 -204 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.288 C 999 240 VERT(CL): 0.432 C 829 180 HORZ(LL): 0.175 H - - HORZ(TL): 0.262 H - - Creep Factor: 2.0 Max TC CSI: 0.731 Max BC CSI: 0.930 Max Web CSI: 0.547 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E10 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126009 / T30 / SPEC FROM: BF DRW: ... / ... 03/17/2020 T1 W1 W8 30' 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 24'9"2 5'2"14 30' 5'2"14 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'6"5 4'11"13 30' 10'5"111'6" 4"7 3'0 " 7 2'4 " 3 10 ' 0 " 4 11 ' (a) (a) A B C D E F G HIJ K 8 12 4 12 4X8(F2T) 2X4 6X10 6X10 4X8 5X6 3X6 4X6 2X4 3X6(R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W8 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1741 /- /- /692 /51 /221 H 1574 /- /- /566 /18 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.7 H Brg Width = 5.5 Min Req = 1.7 Bearings B & H Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 300 -4205 C - D 501 -4169 Chords Tens. Comp. D - E 202 -1246 E - F 173 -1504 F - G 121 -134 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 3525 -264 K - J 1331 0 Chords Tens. Comp. J - I 1131 0 I - H 1110 -58 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - K 294 -597 K - D 3012 -390 D - J 105 -536 J - E 251 -99 Webs Tens. Comp. E - I 256 -39 I - F 179 -56 F - H 97 -1689 G - H 70 -204 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.288 C 999 240 VERT(CL): 0.432 C 829 180 HORZ(LL): 0.175 H - - HORZ(TL): 0.262 H - - Creep Factor: 2.0 Max TC CSI: 0.731 Max BC CSI: 0.930 Max Web CSI: 0.547 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E10 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126009 / T30 / SPEC FROM: BF DRW: ... / ... 03/17/2020 T1 W1 W8 30' 7'6" 7'6" 14'5"11 6'11"11 19'6"5 5'0"10 24'9"2 5'2"14 30' 5'2"14 5"8 5"8 7'6" 7'0"8 14'6"8 7'0"8 19'6"5 4'11"13 30' 10'5"111'6" 4"7 3'0 " 7 2'4 " 3 10 ' 0 " 4 11 ' (a) (a) A B C D E F G HIJ K 8 12 4 12 4X8(F2T) 2X4 6X10 6X10 4X8 5X6 3X6 4X6 2X4 3X6(R) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W6,W7,W8,W9,W10, W13 2x4 DF-L #1&Bet.; Lt Wedge: 2x8 DF-L SS; Bracing (a) Continuous lateral restraint equally spaced on member. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 5.00" o.c. (Each Row) Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at 0.00 to 89 plf at 30.00 BC: From 8 plf at 0.00 to 8 plf at 30.00 BC: 1185 lb Conc. Load at 2.06, 4.06, 6.06, 8.06 10.06,12.06 BC: 1178 lb Conc. Load at 14.06,16.06,18.06,20.06 22.06,24.06,26.06,28.06 Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 9751 /- /- /- /653 /- S 9703 /- /- /- /686 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req = 5.2 S Brg Width = 5.5 Min Req = 5.2 Bearings A & S Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 532 -7934 B - C 479 -7093 C - D 408 -5975 D - E 337 -4876 Chords Tens. Comp. E - F 256 -3703 F - G 312 -4447 G - H 325 -4588 H - I 272 -3829 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - R 6556 -436 R - Q 6534 -436 Q - P 5802 -389 P - O 4865 -328 O - N 4022 -274 Chords Tens. Comp. N - M 4022 -274 M - L 3771 -263 L - K 3214 -226 K - J 9 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. R - B 809 -34 B - Q 52 -799 Q - C 1648 -87 C - P 97 -1494 P - D 2223 -125 D - O 126 -1959 E - O 3117 -183 E - M 40 -701 Webs Tens. Comp. M - F 2247 -134 M - G 22 -236 G - L 148 0 L - H 999 -66 H - K 115 -1421 K - I 4026 -282 I - J 335 -4684 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.241 P 999 240 VERT(CL): 0.348 P 999 180 HORZ(LL): 0.084 C - - HORZ(TL): 0.122 C - - Creep Factor: 2.0 Max TC CSI: 0.833 Max BC CSI: 0.810 Max Web CSI: 0.855 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E11 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126003 / T40 / SPEC FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required T1 W6 W7 W8 W7 W9 W10 W13 30' 3'6"9 3'6"9 7'2"14 3'8"5 10'11"2 3'8"5 14'5"11 3'6"9 19'6"5 5'0"10 22'11"10 3'5"5 26'6"11 3'7"1 30' 3'5"5 3'6"9 3'6"9 7'2"14 3'8"5 10'11"2 3'8"5 14'5"11 3'6"9 19'6"5 5'0"10 22'11"10 3'5"5 26'6"11 3'7"1 30' 3'5"5 4"7 3'0 " 7 10 ' 0 " 4 (a) A B C D E F G H I JKLMNOPQRS 8 12 7X14(B9R) 3X6 3X6 5X6 5X6 6X6 5X8 8X8(R) 6X6(R)H0514 5X8 5X6 3X6 4X6 4X6 6X10 SS0715(R) 6X10 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; T1 2x4 DF-L 2400f-2.0E; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W6,W7,W8,W9,W10, W13 2x4 DF-L #1&Bet.; Lt Wedge: 2x8 DF-L SS; Bracing (a) Continuous lateral restraint equally spaced on member. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 5.00" o.c. (Each Row) Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at 0.00 to 89 plf at 30.00 BC: From 8 plf at 0.00 to 8 plf at 30.00 BC: 1185 lb Conc. Load at 2.06, 4.06, 6.06, 8.06 10.06,12.06 BC: 1178 lb Conc. Load at 14.06,16.06,18.06,20.06 22.06,24.06,26.06,28.06 Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 9751 /- /- /- /653 /- S 9703 /- /- /- /686 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req = 5.2 S Brg Width = 5.5 Min Req = 5.2 Bearings A & S Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 532 -7934 B - C 479 -7093 C - D 408 -5975 D - E 337 -4876 Chords Tens. Comp. E - F 256 -3703 F - G 312 -4447 G - H 325 -4588 H - I 272 -3829 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - R 6556 -436 R - Q 6534 -436 Q - P 5802 -389 P - O 4865 -328 O - N 4022 -274 Chords Tens. Comp. N - M 4022 -274 M - L 3771 -263 L - K 3214 -226 K - J 9 -1 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. R - B 809 -34 B - Q 52 -799 Q - C 1648 -87 C - P 97 -1494 P - D 2223 -125 D - O 126 -1959 E - O 3117 -183 E - M 40 -701 Webs Tens. Comp. M - F 2247 -134 M - G 22 -236 G - L 148 0 L - H 999 -66 H - K 115 -1421 K - I 4026 -282 I - J 335 -4684 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE, HS, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.241 P 999 240 VERT(CL): 0.348 P 999 180 HORZ(LL): 0.084 C - - HORZ(TL): 0.122 C - - Creep Factor: 2.0 Max TC CSI: 0.833 Max BC CSI: 0.810 Max Web CSI: 0.855 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:E11 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126003 / T40 / SPEC FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required T1 W6 W7 W8 W7 W9 W10 W13 30' 3'6"9 3'6"9 7'2"14 3'8"5 10'11"2 3'8"5 14'5"11 3'6"9 19'6"5 5'0"10 22'11"10 3'5"5 26'6"11 3'7"1 30' 3'5"5 3'6"9 3'6"9 7'2"14 3'8"5 10'11"2 3'8"5 14'5"11 3'6"9 19'6"5 5'0"10 22'11"10 3'5"5 26'6"11 3'7"1 30' 3'5"5 4"7 3'0 " 7 10 ' 0 " 4 (a) A B C D E F G H I JKLMNOPQRS 8 12 7X14(B9R) 3X6 3X6 5X6 5X6 6X6 5X8 8X8(R) 6X6(R)H0514 5X8 5X6 3X6 4X6 4X6 6X10 SS0715(R) 6X10 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 24 /- /- /45 /34 /66 B* 253 /- /- /78 /35 /- E 25 /- /- /11 /3 /- Wind reactions based on MWFRS A Brg Width = 6.3 Min Req = 1.5 B Brg Width = 42.4 Min Req = - E Brg Width = 6.3 Min Req = 1.5 Bearings A, B, & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 43 -40 B - C 33 -85 Chords Tens. Comp. C - D 33 -86 D - E 21 -7 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 34 -7 Chords Tens. Comp. F - D 34 -7 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - F 0 -91 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 F 999 240 VERT(CL): 0.000 F 999 180 HORZ(LL): 0.000 F - - HORZ(TL): 0.000 F - - Creep Factor: 2.0 Max TC CSI: 0.034 Max BC CSI: 0.016 Max Web CSI: 0.007 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:ECAP1 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126027 / T16 / GABL FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required 9"2 3'6"6 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"26"5 6"5 1'6 " 9 1"10 1'8 " 3 A B C D E F 8 12 4X6 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 24 /- /- /45 /34 /66 B* 253 /- /- /78 /35 /- E 25 /- /- /11 /3 /- Wind reactions based on MWFRS A Brg Width = 6.3 Min Req = 1.5 B Brg Width = 42.4 Min Req = - E Brg Width = 6.3 Min Req = 1.5 Bearings A, B, & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 43 -40 B - C 33 -85 Chords Tens. Comp. C - D 33 -86 D - E 21 -7 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 34 -7 Chords Tens. Comp. F - D 34 -7 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - F 0 -91 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 F 999 240 VERT(CL): 0.000 F 999 180 HORZ(LL): 0.000 F - - HORZ(TL): 0.000 F - - Creep Factor: 2.0 Max TC CSI: 0.034 Max BC CSI: 0.016 Max Web CSI: 0.007 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:ECAP1 Ply: 2 Qty: 1 Wgt: 0.0 lbs SEQN: 126027 / T16 / GABL FROM: BF DRW: ... / ... 03/17/2020 2 Complete Trusses Required 9"2 3'6"6 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"26"5 6"5 1'6 " 9 1"10 1'8 " 3 A B C D E F 8 12 4X6 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 29 /- /- /45 /34 /66 B* 260 /- /- /78 /35 /- E 25 /- /- /11 /3 /- Wind reactions based on MWFRS A Brg Width = 6.3 Min Req = 1.5 B Brg Width = 42.4 Min Req = - E Brg Width = 6.3 Min Req = 1.5 Bearings A, B, & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 86 -80 B - C 66 -176 Chords Tens. Comp. C - D 66 -172 D - E 41 -14 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 70 -14 Chords Tens. Comp. F - D 70 -14 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - F 0 -184 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 F 999 240 VERT(CL): 0.001 F 999 180 HORZ(LL): 0.000 F - - HORZ(TL): 0.001 F - - Creep Factor: 2.0 Max TC CSI: 0.071 Max BC CSI: 0.034 Max Web CSI: 0.015 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:ECAP2 Ply: 1 Qty: 12 Wgt: 0.0 lbs SEQN: 126029 / T26 / GABL FROM: BF DRW: ... / ... 03/17/2020 9"2 3'6"6 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"26"5 6"5 1'6 " 9 1"10 1'8 " 3 A B C D E F 8 12 4X6 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 29 /- /- /45 /34 /66 B* 260 /- /- /78 /35 /- E 25 /- /- /11 /3 /- Wind reactions based on MWFRS A Brg Width = 6.3 Min Req = 1.5 B Brg Width = 42.4 Min Req = - E Brg Width = 6.3 Min Req = 1.5 Bearings A, B, & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 86 -80 B - C 66 -176 Chords Tens. Comp. C - D 66 -172 D - E 41 -14 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 70 -14 Chords Tens. Comp. F - D 70 -14 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - F 0 -184 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 F 999 240 VERT(CL): 0.001 F 999 180 HORZ(LL): 0.000 F - - HORZ(TL): 0.001 F - - Creep Factor: 2.0 Max TC CSI: 0.071 Max BC CSI: 0.034 Max Web CSI: 0.015 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:ECAP2 Ply: 1 Qty: 12 Wgt: 0.0 lbs SEQN: 126029 / T26 / GABL FROM: BF DRW: ... / ... 03/17/2020 9"2 3'6"6 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"2 9"2 9"2 2'6"5 1'9"3 4'3"8 1'9"3 5'0"10 9"26"5 6"5 1'6 " 9 1"10 1'8 " 3 A B C D E F 8 12 4X6 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 39 /- /- /27 /15 /37 B* 255 /- /- /69 /32 /- F 33 /- /- /18 /10 /- Wind reactions based on MWFRS A Brg Width = 6.3 Min Req = 1.5 B Brg Width = 42.4 Min Req = - F Brg Width = 6.3 Min Req = 1.5 Bearings A, B, & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 51 -46 B - C 120 -460 C - D 106 -359 Chords Tens. Comp. D - E 120 -459 E - F 36 -18 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - E 359 -49 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.002 C 999 240 VERT(CL): 0.003 C 999 180 HORZ(LL): 0.001 - - HORZ(TL): 0.002 - - Creep Factor: 2.0 Max TC CSI: 0.138 Max BC CSI: 0.061 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:ECAP3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126031 / T24 / GABL FROM: BF DRW: ... / ... 03/17/2020 9"2 3'6"6 9"2 9"2 9"2 1'6"5 9"3 3'6"5 2' 4'3"8 9"3 5'0"10 9"2 9"2 9"2 4'3"8 3'6"6 5'0"10 9"26"5 6"5 10 " 9 1"10 1'0 " 3 DT -1"13 A B C D E F 8 12 3X6 3X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4(A1T) except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 39 /- /- /27 /15 /37 B* 255 /- /- /69 /32 /- F 33 /- /- /18 /10 /- Wind reactions based on MWFRS A Brg Width = 6.3 Min Req = 1.5 B Brg Width = 42.4 Min Req = - F Brg Width = 6.3 Min Req = 1.5 Bearings A, B, & F are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 51 -46 B - C 120 -460 C - D 106 -359 Chords Tens. Comp. D - E 120 -459 E - F 36 -18 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - E 359 -49 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.002 C 999 240 VERT(CL): 0.003 C 999 180 HORZ(LL): 0.001 - - HORZ(TL): 0.002 - - Creep Factor: 2.0 Max TC CSI: 0.138 Max BC CSI: 0.061 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:ECAP3 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126031 / T24 / GABL FROM: BF DRW: ... / ... 03/17/2020 9"2 3'6"6 9"2 9"2 9"2 1'6"5 9"3 3'6"5 2' 4'3"8 9"3 5'0"10 9"2 9"2 9"2 4'3"8 3'6"6 5'0"10 9"26"5 6"5 10 " 9 1"10 1'0 " 3 DT -1"13 A B C D E F 8 12 3X6 3X6 - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; M4,M5 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A* 2 /- /- /- /- /- A Brg Width = 261 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -1 B - C 0 -2 C - D 0 -2 D - E 0 -2 E - F 0 -1 F - G 0 0 G - H 0 0 Chords Tens. Comp. H - I 0 0 I - J 0 0 J - K 0 -1 K - L 0 -2 L - M 0 -2 M - N 0 -2 N - O 0 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A -AA 1 0 AA- Z 1 0 Z - Y 1 0 Y - X 0 0 X - W 0 0 W - V 0 0 V - U 0 0 Chords Tens. Comp. U - T 0 0 T - S 0 0 S - R 0 0 R - Q 1 0 Q - P 1 0 P - O 1 0 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B -AA 0 -2 C - Z 0 -2 D - Y 0 -2 E - X 0 -2 G - W 0 -2 H - U 0 -2 Gables Tens. Comp. I - T 0 -2 S - K 0 -2 R - L 0 -2 Q - M 0 -2 P - N 0 -2 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: NA Speed: NA mph Enclosure: NA Category: NA EXP: NAKzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 26.9 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 - - 240 VERT(CL): 0.000 J 999 180 HORZ(LL): 0.000 - - - HORZ(TL): 0.000 N - - Creep Factor: 2.0 Max TC CSI: 0.000 Max BC CSI: 0.000 Max Web CSI: 0.002 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:EFL1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126080 / T28 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 M4 M5 M5 M5 M4 21'9"15 10"15 2'(TYP) 7'10"15 7'10"15 13'10"15 6' 21'9"15 7'10"15 21'9"15 21'9"15 0"4 9'6 " 6 A B C D E F G H I J K L M N O PQRSTUVWXYZAA 14.42 12 2X4(D8R) 3X6 3X6 3X6 2X4(D8R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; M4,M5 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A* 2 /- /- /- /- /- A Brg Width = 261 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -1 B - C 0 -2 C - D 0 -2 D - E 0 -2 E - F 0 -1 F - G 0 0 G - H 0 0 Chords Tens. Comp. H - I 0 0 I - J 0 0 J - K 0 -1 K - L 0 -2 L - M 0 -2 M - N 0 -2 N - O 0 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A -AA 1 0 AA- Z 1 0 Z - Y 1 0 Y - X 0 0 X - W 0 0 W - V 0 0 V - U 0 0 Chords Tens. Comp. U - T 0 0 T - S 0 0 S - R 0 0 R - Q 1 0 Q - P 1 0 P - O 1 0 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B -AA 0 -2 C - Z 0 -2 D - Y 0 -2 E - X 0 -2 G - W 0 -2 H - U 0 -2 Gables Tens. Comp. I - T 0 -2 S - K 0 -2 R - L 0 -2 Q - M 0 -2 P - N 0 -2 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: NA Speed: NA mph Enclosure: NA Category: NA EXP: NAKzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 26.9 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 - - 240 VERT(CL): 0.000 J 999 180 HORZ(LL): 0.000 - - - HORZ(TL): 0.000 N - - Creep Factor: 2.0 Max TC CSI: 0.000 Max BC CSI: 0.000 Max Web CSI: 0.002 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:EFL1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126080 / T28 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 M4 M5 M5 M5 M4 21'9"15 10"15 2'(TYP) 7'10"15 7'10"15 13'10"15 6' 21'9"15 7'10"15 21'9"15 21'9"15 0"4 9'6 " 6 A B C D E F G H I J K L M N O PQRSTUVWXYZAA 14.42 12 2X4(D8R) 3X6 3X6 3X6 2X4(D8R) -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A* 2 /- /- /- /- /- A Brg Width = 69.9 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 0 B - C 0 -1 Chords Tens. Comp. C - D 0 -1 D - E 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - H 1 0 H - G 0 0 Chords Tens. Comp. G - F 0 0 F - E 1 0 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B - H 0 -2 C - G 0 -1 Gables Tens. Comp. F - D 0 -2 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: NA Speed: NA mph Enclosure: NA Category: NA EXP: NAKzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 26.9 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 - - 240 VERT(CL): 0.000 C 999 180 HORZ(LL): 0.000 - - - HORZ(TL): 0.000 H - - Creep Factor: 2.0 Max TC CSI: 0.001 Max BC CSI: 0.000 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:EFL2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126082 / T29 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 5'9"15 10"15 2' (TYP) 2'10"15 2'10"15 5'9"15 2'10"15 5'9"15 5'9"15 0"4 3'6 " 4 A B C D E FGH 14.42 12 2X4(D8R) 4X6 2X4(D8R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Plating Notes All plates are 2X4 except as noted. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A* 2 /- /- /- /- /- A Brg Width = 69.9 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 0 B - C 0 -1 Chords Tens. Comp. C - D 0 -1 D - E 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - H 1 0 H - G 0 0 Chords Tens. Comp. G - F 0 0 F - E 1 0 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B - H 0 -2 C - G 0 -1 Gables Tens. Comp. F - D 0 -2 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: NA Speed: NA mph Enclosure: NA Category: NA EXP: NAKzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 26.9 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.000 - - 240 VERT(CL): 0.000 C 999 180 HORZ(LL): 0.000 - - - HORZ(TL): 0.000 H - - Creep Factor: 2.0 Max TC CSI: 0.001 Max BC CSI: 0.000 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:EFL2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126082 / T29 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 5'9"15 10"15 2' (TYP) 2'10"15 2'10"15 5'9"15 2'10"15 5'9"15 5'9"15 0"4 3'6 " 4 A B C D E FGH 14.42 12 2X4(D8R) 4X6 2X4(D8R) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W6 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1341 /- /- /538 /86 /210 G 1178 /- /- /412 /77 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 G Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 212 -1684 C - D 216 -1040 Chords Tens. Comp. D - E 230 -964 E - F 108 -105 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1275 -193 J - I 1274 -193 Chords Tens. Comp. I - H 1274 -193 H - G 668 -86 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 230 0 C - H 199 -691 D - H 477 -105 Webs Tens. Comp. H - E 163 -57 E - G 153 -1151 F - G 64 -171 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.039 J 999 240 VERT(CL): 0.058 J 999 180 HORZ(LL): 0.019 G - - HORZ(TL): 0.028 G - - Creep Factor: 2.0 Max TC CSI: 0.561 Max BC CSI: 0.449 Max Web CSI: 0.891 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:F2 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 125991 / T37 / SPEC FROM: BF DRW: ... / ... 03/17/2020 W1 W6 22'6"8 (J)Supporting Member: (2) 7'0"15 7'0"15 13'9" 6'8"1 18'1"12 4'4"12 22'6"8 4'4"12 7'0"15 7'0"15 13'9" 6'8"1 22'6"8 8'9"81'6" 4"7 3'8 " 2 9'6 " 7 10 ' 6 " 3 (a) A B C D E F GHIJ 8 12 3X6(B1T) 2X4 3X6 3X6 4X6 4X8 3X6 2X4 3X6(R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; W1,W6 2x4 DF-L Stud; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1341 /- /- /538 /86 /210 G 1178 /- /- /412 /77 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 G Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 212 -1684 C - D 216 -1040 Chords Tens. Comp. D - E 230 -964 E - F 108 -105 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1275 -193 J - I 1274 -193 Chords Tens. Comp. I - H 1274 -193 H - G 668 -86 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 230 0 C - H 199 -691 D - H 477 -105 Webs Tens. Comp. H - E 163 -57 E - G 153 -1151 F - G 64 -171 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.039 J 999 240 VERT(CL): 0.058 J 999 180 HORZ(LL): 0.019 G - - HORZ(TL): 0.028 G - - Creep Factor: 2.0 Max TC CSI: 0.561 Max BC CSI: 0.449 Max Web CSI: 0.891 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:F2 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 125991 / T37 / SPEC FROM: BF DRW: ... / ... 03/17/2020 W1 W6 22'6"8 (J)Supporting Member: (2) 7'0"15 7'0"15 13'9" 6'8"1 18'1"12 4'4"12 22'6"8 4'4"12 7'0"15 7'0"15 13'9" 6'8"1 22'6"8 8'9"81'6" 4"7 3'8 " 2 9'6 " 7 10 ' 6 " 3 (a) A B C D E F GHIJ 8 12 3X6(B1T) 2X4 3X6 3X6 4X6 4X8 3X6 2X4 3X6(R) - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W2,W3,W4, W5 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at -1.66 to 89 plf at 11.06 TC: From 45 plf at 11.06 to 45 plf at 19.06 TC: From 89 plf at 19.06 to 89 plf at 22.54 BC: From 16 plf at 0.00 to 16 plf at 11.06 BC: From 8 plf at 11.06 to 8 plf at 19.06 BC: From 16 plf at 19.06 to 16 plf at 22.54 BC: 107 lb Conc. Load at 11.06,13.06,15.06,17.06 19.06 Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 2621 /- /- /- /140 /- AQ*1388 /- /- /- /70 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 2.8 AQ Brg Width = 24.0 Min Req = - Bearings B & Q Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 -16 B - C 156 -3204 C - D 156 -3180 D - E 154 -3149 E - F 148 -3060 F - G 104 -1959 G - H 100 -1880 Chords Tens. Comp. H - I 92 -1834 I - J 89 -1789 J - K 94 -1878 K - L 92 -1813 L - M 86 -37 M - N 80 -135 N - O 278 -17 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AC 2565 -123 AC-AB 2553 -121 AB-AA 2541 -120 AA- Z 2536 -119 Z - Y 2525 -119 Y - X 2526 -119 X - W 2526 -119 Chords Tens. Comp. W - V 2526 -119 V - U 2526 -119 U - T 1083 -56 T - S 1083 -56 S - R 1083 -56 R - Q 1083 -56 Q - P 1084 -56 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. Z - F 828 -18 F -AD 57 -1297 AD-AE 52 -1269 AF-AG 56 -1302 AH- U 57 -1323 I - U 1287 -67 U -AI 604 -29 Webs Tens. Comp. AJ-AK 606 -29 AL- L 702 -34 L -AM 106 -2038 AN-AO 108 -2085 AP- P 91 -1781 O - P 297 -13 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C -AC 17 -128 D -AB 35 -331 E -AA 27 -225 Gables Tens. Comp. AI- T 11 -246 J -AJ 10 -247 AK- S 6 -201 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.126 H 999 240 VERT(CL): 0.181 H 999 180 HORZ(LL): 0.057 D - - HORZ(TL): 0.082 D - - Creep Factor: 2.0 Max TC CSI: 0.683 Max BC CSI: 0.895 Max Web CSI: 0.623 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:F1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126091 / T49 / GABL FROM: BF Page 1 of 2 DRW: ... / ... 03/17/2020 W2 W3 W4 W5 22'6"8 1'6" 2' (TYP) 7'0"15 7'0"15 13'9" 6'8"1 18'4"8 4'7"8 22'6"8 4'2" 7'0"15 7'0"15 13'9" 6'8"1 22'6"8 8'9"81'6" 4"7 3'8 " 2 9'6 " 7 10 ' 6 " 3 (a) (a) A B C D E F G H I J K L M N O P Q RSTUVWXYZAAABAC AD AEAF AG AH AI AJ AK AL AM AN AO AP AQ 8 12 4X8(B3T) 4X6 3X6 4X6 4X6 4X8 5X6 3X6 3X6(R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; W2,W3,W4, W5 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 89 plf at -1.66 to 89 plf at 11.06 TC: From 45 plf at 11.06 to 45 plf at 19.06 TC: From 89 plf at 19.06 to 89 plf at 22.54 BC: From 16 plf at 0.00 to 16 plf at 11.06 BC: From 8 plf at 11.06 to 8 plf at 19.06 BC: From 16 plf at 19.06 to 16 plf at 22.54 BC: 107 lb Conc. Load at 11.06,13.06,15.06,17.06 19.06 Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Additional Notes See DWGS A11515ENC101014, GBLLETIN0118, & GABRST101014 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 2621 /- /- /- /140 /- AQ*1388 /- /- /- /70 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 2.8 AQ Brg Width = 24.0 Min Req = - Bearings B & Q Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 -16 B - C 156 -3204 C - D 156 -3180 D - E 154 -3149 E - F 148 -3060 F - G 104 -1959 G - H 100 -1880 Chords Tens. Comp. H - I 92 -1834 I - J 89 -1789 J - K 94 -1878 K - L 92 -1813 L - M 86 -37 M - N 80 -135 N - O 278 -17 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AC 2565 -123 AC-AB 2553 -121 AB-AA 2541 -120 AA- Z 2536 -119 Z - Y 2525 -119 Y - X 2526 -119 X - W 2526 -119 Chords Tens. Comp. W - V 2526 -119 V - U 2526 -119 U - T 1083 -56 T - S 1083 -56 S - R 1083 -56 R - Q 1083 -56 Q - P 1084 -56 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. Z - F 828 -18 F -AD 57 -1297 AD-AE 52 -1269 AF-AG 56 -1302 AH- U 57 -1323 I - U 1287 -67 U -AI 604 -29 Webs Tens. Comp. AJ-AK 606 -29 AL- L 702 -34 L -AM 106 -2038 AN-AO 108 -2085 AP- P 91 -1781 O - P 297 -13 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C -AC 17 -128 D -AB 35 -331 E -AA 27 -225 Gables Tens. Comp. AI- T 11 -246 J -AJ 10 -247 AK- S 6 -201 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.126 H 999 240 VERT(CL): 0.181 H 999 180 HORZ(LL): 0.057 D - - HORZ(TL): 0.082 D - - Creep Factor: 2.0 Max TC CSI: 0.683 Max BC CSI: 0.895 Max Web CSI: 0.623 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:F1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126091 / T49 / GABL FROM: BF Page 1 of 2 DRW: ... / ... 03/17/2020 W2 W3 W4 W5 22'6"8 1'6" 2' (TYP) 7'0"15 7'0"15 13'9" 6'8"1 18'4"8 4'7"8 22'6"8 4'2" 7'0"15 7'0"15 13'9" 6'8"1 22'6"8 8'9"81'6" 4"7 3'8 " 2 9'6 " 7 10 ' 6 " 3 (a) (a) A B C D E F G H I J K L M N O P Q RSTUVWXYZAAABAC AD AEAF AG AH AI AJ AK AL AM AN AO AP AQ 8 12 4X8(B3T) 4X6 3X6 4X6 4X6 4X8 5X6 3X6 3X6(R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Y -AD 8 -50 AE- G 35 -317 X -AF 31 -271 AG- H 18 -324 W -AH 17 -293 K -AL 12 -312 AM- M 22 -251 R -AN 18 -174 AO- N 55 -784 Q -AP 74 -1133 Job Number:J209436 -FALL CREEK HOMES Truss Label:F1 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126091 / T49 / GABL FROM: BF Page 2 of 2 DRW: ... / ... 03/17/2020 -FALL CREEK HOMESGALLATIN 3 CAR -FALL CREEK HOMES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 325 /- /- /164 /27 /59 D 26 /-2 /- /18 /3 /- C 72 /- /- /25 /17 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 Chords Tens. Comp. B - C 40 -67 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 D - - HORZ(TL): 0.001 D - - Creep Factor: 2.0 Max TC CSI: 0.179 Max BC CSI: 0.028 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X1 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 126033 / T8 / JACK FROM: BF DRW: ... / ... 03/17/2020 1'10"15 1'10"151'6" 4"7 1' 7 " 1 2 2' 7 " 8 A B C D 8 12 2X4(A1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 325 /- /- /164 /27 /59 D 26 /-2 /- /18 /3 /- C 72 /- /- /25 /17 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 Chords Tens. Comp. B - C 40 -67 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 D - - HORZ(TL): 0.001 D - - Creep Factor: 2.0 Max TC CSI: 0.179 Max BC CSI: 0.028 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X1 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 126033 / T8 / JACK FROM: BF DRW: ... / ... 03/17/2020 1'10"15 1'10"151'6" 4"7 1' 7 " 1 2 2' 7 " 8 A B C D 8 12 2X4(A1T) -FALL CREEK HOMESGALLATIN 3 CAR -FALL CREEK HOMES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 390 /- /- /181 /13 /96 D 62 /- /- /34 /- /- C 152 /- /- /51 /43 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 Chords Tens. Comp. B - C 84 -105 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 D - - HORZ(TL): 0.006 D - - Creep Factor: 2.0 Max TC CSI: 0.203 Max BC CSI: 0.113 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X2 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 126035 / T7 / JACK FROM: BF DRW: ... / ... 03/17/2020 3'10"15 3'10"151'6" 4"7 2' 1 1 " 1 2 3' 1 1 " 8 A B C D 8 12 2X4(A1T) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 390 /- /- /181 /13 /96 D 62 /- /- /34 /- /- C 152 /- /- /51 /43 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 Chords Tens. Comp. B - C 84 -105 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 D - - HORZ(TL): 0.006 D - - Creep Factor: 2.0 Max TC CSI: 0.203 Max BC CSI: 0.113 Max Web CSI: 0.000 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X2 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 126035 / T7 / JACK FROM: BF DRW: ... / ... 03/17/2020 3'10"15 3'10"151'6" 4"7 2' 1 1 " 1 2 3' 1 1 " 8 A B C D 8 12 2X4(A1T) -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 479 /- /- /213 /3 /133 E 308 /- /- /140 /52 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 111 -166 Chords Tens. Comp. C - D 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 17 -5 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 113 -234 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.012 F - - HORZ(TL): 0.017 F - - Creep Factor: 2.0 Max TC CSI: 0.455 Max BC CSI: 0.255 Max Web CSI: 0.201 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X3 Ply: 1 Qty: 4 Wgt: 0.0 lbs SEQN: 126063 / T5 / JACK FROM: BF DRW: ... / ... 03/17/2020 5'10"15 (J)Supporting Member: (1) 5'10"15 5'10"151'6" 4"7 4' 3 " 1 2 5'3 " 8 HB 1" A B CD EF 8 12 2X4(A1T) 2X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 479 /- /- /213 /3 /133 E 308 /- /- /140 /52 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 111 -166 Chords Tens. Comp. C - D 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 17 -5 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 113 -234 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.012 F - - HORZ(TL): 0.017 F - - Creep Factor: 2.0 Max TC CSI: 0.455 Max BC CSI: 0.255 Max Web CSI: 0.201 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X3 Ply: 1 Qty: 4 Wgt: 0.0 lbs SEQN: 126063 / T5 / JACK FROM: BF DRW: ... / ... 03/17/2020 5'10"15 (J)Supporting Member: (1) 5'10"15 5'10"151'6" 4"7 4' 3 " 1 2 5'3 " 8 HB 1" A B CD EF 8 12 2X4(A1T) 2X4 2X4 -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 483 /- /- /215 /3 /134 E 312 /- /- /143 /53 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 113 -169 Chords Tens. Comp. C - D 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 18 -6 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 115 -237 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.012 F - - HORZ(TL): 0.018 F - - Creep Factor: 2.0 Max TC CSI: 0.469 Max BC CSI: 0.263 Max Web CSI: 0.211 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X4 Ply: 1 Qty: 3 Wgt: 0.0 lbs SEQN: 126037 / T32 / EJAC FROM: BF DRW: ... / ... 03/17/2020 6' (J)Supporting Member: (1) 6' 6'1'6" 4"7 4'4 " 7 5'4 " 3 HB 1" A B CD EF 8 12 2X4(A1T) 2X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 483 /- /- /215 /3 /134 E 312 /- /- /143 /53 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 113 -169 Chords Tens. Comp. C - D 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 18 -6 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 115 -237 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.012 F - - HORZ(TL): 0.018 F - - Creep Factor: 2.0 Max TC CSI: 0.469 Max BC CSI: 0.263 Max Web CSI: 0.211 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X4 Ply: 1 Qty: 3 Wgt: 0.0 lbs SEQN: 126037 / T32 / EJAC FROM: BF DRW: ... / ... 03/17/2020 6' (J)Supporting Member: (1) 6' 6'1'6" 4"7 4'4 " 7 5'4 " 3 HB 1" A B CD EF 8 12 2X4(A1T) 2X4 2X4 -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 319 /- /- /126 /- /109 D 312 /- /- /157 /58 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req = 1.5 D Brg Width = - Min Req = - Bearing A Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 113 -164 Chords Tens. Comp. B - C 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 18 -7 Chords Tens. Comp. E - D 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 121 -237 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.012 E - - HORZ(TL): 0.018 E - - Creep Factor: 2.0 Max TC CSI: 0.469 Max BC CSI: 0.263 Max Web CSI: 0.211 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X5 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126039 / T34 / EJAC FROM: BF DRW: ... / ... 03/17/2020 6' (J)Supporting Member: (1) 6' 6' 4"7 4' 4 " 7 HB 1" A BC DE 8 12 2X4(A1) 2X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 319 /- /- /126 /- /109 D 312 /- /- /157 /58 /- Wind reactions based on MWFRS A Brg Width = 5.5 Min Req = 1.5 D Brg Width = - Min Req = - Bearing A Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 113 -164 Chords Tens. Comp. B - C 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 18 -7 Chords Tens. Comp. E - D 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 121 -237 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.012 E - - HORZ(TL): 0.018 E - - Creep Factor: 2.0 Max TC CSI: 0.469 Max BC CSI: 0.263 Max Web CSI: 0.211 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X5 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126039 / T34 / EJAC FROM: BF DRW: ... / ... 03/17/2020 6' (J)Supporting Member: (1) 6' 6' 4"7 4' 4 " 7 HB 1" A BC DE 8 12 2X4(A1) 2X4 2X4 - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 582 /- /- /253 /- /171 F 418 /- /- /199 /73 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 0 -438 Chords Tens. Comp. C - D 75 -119 D - E 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 311 -126 Chords Tens. Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 155 -383 Webs Tens. Comp. D - G 76 -142 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.006 G 999 240 VERT(CL): 0.013 G 999 180 HORZ(LL): 0.004 G - - HORZ(TL): 0.009 G - - Creep Factor: 2.0 Max TC CSI: 0.260 Max BC CSI: 0.315 Max Web CSI: 0.153 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X6 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 126065 / T9 / EJAC FROM: BF DRW: ... / ... 03/17/2020 8' (J)Supporting Member: (1) 4'1"15 4'1"15 8' 3'10"1 8' 8'1'6" 4"7 5'8 " 7 6'8 " 3 HB 1" A B C D E FG 8 12 2X4(A1T) 2X4 2X4 4X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 582 /- /- /253 /- /171 F 418 /- /- /199 /73 /- Wind reactions based on MWFRS B Brg Width = 3.5 Min Req = 1.5 F Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 0 -438 Chords Tens. Comp. C - D 75 -119 D - E 0 -4 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 311 -126 Chords Tens. Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 155 -383 Webs Tens. Comp. D - G 76 -142 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.006 G 999 240 VERT(CL): 0.013 G 999 180 HORZ(LL): 0.004 G - - HORZ(TL): 0.009 G - - Creep Factor: 2.0 Max TC CSI: 0.260 Max BC CSI: 0.315 Max Web CSI: 0.153 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X6 Ply: 1 Qty: 6 Wgt: 0.0 lbs SEQN: 126065 / T9 / EJAC FROM: BF DRW: ... / ... 03/17/2020 8' (J)Supporting Member: (1) 4'1"15 4'1"15 8' 3'10"1 8' 8'1'6" 4"7 5'8 " 7 6'8 " 3 HB 1" A B C D E FG 8 12 2X4(A1T) 2X4 2X4 4X6 -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 323 /- /- /163 /26 /60 E 107 /- /- /49 /19 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 37 -65 Chords Tens. Comp. C - D 0 -8 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 2 -1 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 18 -84 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: 1.1 CAT: II Pf: 26.9 Ce: 1.0 Lu: - Cs: 1.00 Snow Duration: 1.15 Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 F - - HORZ(TL): 0.001 F - - Creep Factor: 2.0 Max TC CSI: 0.179 Max BC CSI: 0.028 Max Web CSI: 0.006 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X7 Ply: 1 Qty: 5 Wgt: 0.0 lbs SEQN: 126089 / T46 / MONO FROM: BF DRW: ... / ... 03/17/2020 2' (J)Supporting Member: (1) 1'10" 1'10" 2' 2" 1'10" 1'10" 2' 2" 1'6" 4"7 1'8 " 7 2' 8 " 3 A B CD EF 8 12 2X4(A1T) 2X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Member design based on both MWFRS and C&C. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 323 /- /- /163 /26 /60 E 107 /- /- /49 /19 /- Wind reactions based on MWFRS B Brg Width = 5.5 Min Req = 1.5 E Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 78 0 B - C 37 -65 Chords Tens. Comp. C - D 0 -8 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 2 -1 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 18 -84 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: 1.1 CAT: II Pf: 26.9 Ce: 1.0 Lu: - Cs: 1.00 Snow Duration: 1.15 Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 F - - HORZ(TL): 0.001 F - - Creep Factor: 2.0 Max TC CSI: 0.179 Max BC CSI: 0.028 Max Web CSI: 0.006 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:X7 Ply: 1 Qty: 5 Wgt: 0.0 lbs SEQN: 126089 / T46 / MONO FROM: BF DRW: ... / ... 03/17/2020 2' (J)Supporting Member: (1) 1'10" 1'10" 2' 2" 1'10" 1'10" 2' 2" 1'6" 4"7 1'8 " 7 2' 8 " 3 A B CD EF 8 12 2X4(A1T) 2X4 2X4 - F A L L C R E E K H O M E SG A L L A T I N 3 C A R - F A L L C R E E K H O M E S **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.25 to 88 plf at -0.12 TC: From 2 plf at -0.12 to 2 plf at 11.19 BC: From 2 plf at 0.00 to 2 plf at 11.19 TC: 143 lb Conc. Load at 2.75 TC: 305 lb Conc. Load at 5.58 BC: 51 lb Conc. Load at 2.75 BC: 125 lb Conc. Load at 5.58 BC: 615 lb Conc. Load at 8.40 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL I 641 /- /- /- /93 /- F 745 /- /- /- /104 /- Wind reactions based on MWFRS I Brg Width = 4.2 Min Req = 1.5 F Brg Width = - Min Req = - Bearing I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -8 B - C 157 -1120 Chords Tens. Comp. C - D 15 -24 D - E 0 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 967 -132 H - G 949 -131 Chords Tens. Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - C 601 -46 C - G 148 -1073 Webs Tens. Comp. D - G 8 -38 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 H 999 240 VERT(CL): 0.032 H 999 180 HORZ(LL): -0.006 D - - HORZ(TL): 0.010 D - - Creep Factor: 2.0 Max TC CSI: 0.269 Max BC CSI: 0.554 Max Web CSI: 0.639 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:XG1 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126069 / T11 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 11'2"4 (J)Supporting Member: (1) 5'9"12 5'9"12 11'2"4 5'4"9 5'9"12 5'9"12 11'2"4 5'4"92'1"7 4"7 5'7 " 1 2 6'7 " 3 HB 1" A B C DE FGHI 5.66 12 3X6(A1T) 3X6 3X6 2X4 4X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x6 DF-L SS; Webs: 2x4 DF-L Stud; Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.25 to 88 plf at -0.12 TC: From 2 plf at -0.12 to 2 plf at 11.19 BC: From 2 plf at 0.00 to 2 plf at 11.19 TC: 143 lb Conc. Load at 2.75 TC: 305 lb Conc. Load at 5.58 BC: 51 lb Conc. Load at 2.75 BC: 125 lb Conc. Load at 5.58 BC: 615 lb Conc. Load at 8.40 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL I 641 /- /- /- /93 /- F 745 /- /- /- /104 /- Wind reactions based on MWFRS I Brg Width = 4.2 Min Req = 1.5 F Brg Width = - Min Req = - Bearing I Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -8 B - C 157 -1120 Chords Tens. Comp. C - D 15 -24 D - E 0 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 967 -132 H - G 949 -131 Chords Tens. Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. H - C 601 -46 C - G 148 -1073 Webs Tens. Comp. D - G 8 -38 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 H 999 240 VERT(CL): 0.032 H 999 180 HORZ(LL): -0.006 D - - HORZ(TL): 0.010 D - - Creep Factor: 2.0 Max TC CSI: 0.269 Max BC CSI: 0.554 Max Web CSI: 0.639 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:XG1 Ply: 1 Qty: 2 Wgt: 0.0 lbs SEQN: 126069 / T11 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 11'2"4 (J)Supporting Member: (1) 5'9"12 5'9"12 11'2"4 5'4"9 5'9"12 5'9"12 11'2"4 5'4"92'1"7 4"7 5'7 " 1 2 6'7 " 3 HB 1" A B C DE FGHI 5.66 12 3X6(A1T) 3X6 3X6 2X4 4X6 -FALL CREEK HO MESG ALLATI N 3 CAR -FALL CREEK HO MES **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.25 to 88 plf at -0.12 TC: From 2 plf at -0.12 to 2 plf at 8.36 BC: From 2 plf at 0.00 to 2 plf at 8.36 TC: 143 lb Conc. Load at 2.75 TC: 305 lb Conc. Load at 5.58 BC: 51 lb Conc. Load at 2.75 BC: 125 lb Conc. Load at 5.58 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 396 /- /- /- /58 /- F 366 /- /- /- /42 /- Wind reactions based on MWFRS B Brg Width = 7.0 Min Req = 1.5 F Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -8 B - C 90 -464 Chords Tens. Comp. C - D 26 -122 D - E 0 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 423 -77 Chords Tens. Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 88 -466 Webs Tens. Comp. D - G 18 -56 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.009 G 999 240 VERT(CL): 0.017 G 999 180 HORZ(LL): 0.005 G - - HORZ(TL): 0.009 G - - Creep Factor: 2.0 Max TC CSI: 0.328 Max BC CSI: 0.460 Max Web CSI: 0.170 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:XG2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126043 / T41 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 8'4"5 (J)Supporting Member: (1) 4'4"12 4'4"12 8'4"5 3'11"9 8'4"5 8'4"52'1"7 4"7 4'3 " 1 2 5'3 " 3 HB 1" A B C D E FG 5.66 12 2X4(A1T) 2X4 2X4 3X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L Stud; Special Loads ------(Lumber Dur.Fac.=1.15 / Plate Dur.Fac.=1.15) TC: From 0 plf at -2.25 to 88 plf at -0.12 TC: From 2 plf at -0.12 to 2 plf at 8.36 BC: From 2 plf at 0.00 to 2 plf at 8.36 TC: 143 lb Conc. Load at 2.75 TC: 305 lb Conc. Load at 5.58 BC: 51 lb Conc. Load at 2.75 BC: 125 lb Conc. Load at 5.58 Hangers / Ties (J) Hanger Support Required, by others Loading Bottom chord checked for 10.00 psf non-concurrent bottom chord live load applied per IRC-15 section 301.5. Purlins In lieu of structural panels or rigid ceiling use purlins to brace TC @ 24" oc, BC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 396 /- /- /- /58 /- F 366 /- /- /- /42 /- Wind reactions based on MWFRS B Brg Width = 7.0 Min Req = 1.5 F Brg Width = - Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -8 B - C 90 -464 Chords Tens. Comp. C - D 26 -122 D - E 0 -1 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 423 -77 Chords Tens. Comp. G - F 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 88 -466 Webs Tens. Comp. D - G 18 -56 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-10 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 35.0 Ct: - CAT: - Pf: 35.0 Ce: - Lu: - Cs: - Snow Duration: - Code / Misc Criteria Bldg Code: IRC 2015 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.009 G 999 240 VERT(CL): 0.017 G 999 180 HORZ(LL): 0.005 G - - HORZ(TL): 0.009 G - - Creep Factor: 2.0 Max TC CSI: 0.328 Max BC CSI: 0.460 Max Web CSI: 0.170 Mfg Specified Camber: VIEW Ver: 19.02.02B.0122.16 Job Number:J209436 -FALL CREEK HOMES Truss Label:XG2 Ply: 1 Qty: 1 Wgt: 0.0 lbs SEQN: 126043 / T41 / HIP_ FROM: BF DRW: ... / ... 03/17/2020 8'4"5 (J)Supporting Member: (1) 4'4"12 4'4"12 8'4"5 3'11"9 8'4"5 8'4"52'1"7 4"7 4'3 " 1 2 5'3 " 3 HB 1" A B C D E FG 5.66 12 2X4(A1T) 2X4 2X4 3X6