Loading...
HomeMy WebLinkAboutDEQ APPROVAL LETTER - 19-00138 - 12th W & Hwy 33 - Rexburg West Division No. 1March 31, 2020 Mitch Neihbaur 12th West Properties 127 East Main Street Rexburg, ID 83440 Re: City of Rexburg, Rexburg West Division I Water and Sewer System Design Review DEQ# 20-02-33. Dear Mr. Neihbaur, The Department of Environmental Quality (DEQ) has reviewed the design Plans and Specifications received on March 30, 2020. The design Plans and Specifications meet state standards and are therefore approved. Our approval is for the design. We will give final project approval after the project is constructed and the as-built drawings submitted for our records. This office must review any deviations from the approved design that might result in violations of Idaho Regulations before field installation. Within 30 days after construction, a professional engineer registered in the State of Idaho must provide this office with as-built plans, or a letter of certification stating that the project was installed substantially according to the approved design. If you have any questions regarding this letter or if we can be of further assistance, please call me at (208) 528-2650 Sincerely, William Teuscher PE Water Quality Engineer Idaho Falls Regional Office C. Keith Davidson P.E., City of Rexburg Husk Crowther P.E., Civilize, PLLC 900 North Skyline Drive, Suite B • Idaho Falls, ID 83402 • (208) 528-2650 Brad Little, Governor John Tippets, Director STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY