Loading...
HomeMy WebLinkAboutEXIT SIGN PLAN - 19-00723 - 227 E Main - Mountain America Credit Union Office - Call CenterRE F . R E F . RE F . R E F . F. E . C . RE F . F. E . C . S OS1 S S S OS 4 A S OS 4 A S L V 1 SLVOS4A S LV O S 4 A J J J J J J 1 2 3 A B C D E TRAINING 015 ? ? STAIR S2 F1 1 E402 PHONE 008 PHONE 009 2 E402 STAIR S1 GAME ROOM 002 F5 TRAINING 016 EM PREP. 003 BREAK ROOM 004 F1 F1 F1 F1 F1 F1 F2 F2 F2 F2F2 F2 F2F2 F2 F2 F2 F2 STORAGE 013 F4 F4 F4 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 BREAK ROOM 004 F2 F2 F2 F2 F2 F2 ELEV. E1 JANITOR 006 ELECTRICAL 005 F4 F4 F5 F1F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 EMPLOYEE LOUNGE 007 F6 F4 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F1 F1 F1 F1 F1 F1 F1F1F1 F1 F1 F1 F1 F1F1 F1 F1 F1 F1 F3 F3 F3 F3 F3 EM EM PUMP ROOM M01 F4 EX1 EX1 F9 F9 F9 F9EX1 EX1 F1 F1 F1 F1 EM EM EMEMEM EM EM EX1 EX1 EM EM EM EM a a, b OS4 a b a a c a a a a b b b b c cc cc cc d d d d d d d d d OS4 a, b c,d a,b MB-26 LCPB-1 MB-26 OS1 OS1 F2 F2 F2 F2 F2 F2 F2 F2 F2F2 MB-30 M2-7 UP TO LEVEL 1 UP TO LEVEL 1 OS4 OS4 OS4 OS4 1 EM EM F2 F2 F1 F1 1 PHONE 017 MOTHER'S 010 WOMEN'S 012 MEN'S 011 HALL 014 MB-27 MB-29 2 2 2 2 2 2 1 1 EX1 2 EX2 2 KEYED NOTES: 1. TIE ELEVATOR PIT LIGHTING CIRCUIT WITH ELEVATOR PIT RECEPTACLE. 2. RECESSED JUNCTION BOX FOR LIT MIRROR. LOCATE JUNCTION BOX BASED ON CONNECTION POINT IN MANUFACTURER'S INSTRUCTIONS. 1 GENERAL NOTES: A. COORDINATE ALL LIGHTING AND CONTROLS COMPONENTS WITH MECHANICAL DIFFUSERS. B. ALL EXIT SIGNS, EMERGENCY BATTERY PACKS, AND LUMINAIRES LABELLED WITH 'EM' TO HAVE THE EMERGENCY BATTERY CIRCUITING ON THE UNSWITCHED SIDE OF THE BRANCH CIRCUIT. C. ELECTRICAL CONTRACTOR TO PROVIDE UNISTRUT UNDER MECHANICAL EQUIPMENT AND DUCT WORK, AS A MOUNTING METHOD FOR LUMINAIRES. D. ALL EMERGENCY LIGHTING BATTERIES SHALL PROVIDE A MINIMUM OF 90 MINUTES ILLUMINATION PER NEC 700.12(A) AND IBC 1006. SEE electrical SPEC SECTION FOR ADDITIONAL REQUIREMENTS. E. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING HEIGHTS AND DROPPED DECORATIVE CEILING ELEMENTS. F. COORDINATE ALL SWITCH, OUTLET, LIGHT AND OTHER DEVICE LOCATIONS WITH ARCHITECTURAL ELEMENTS (CABINETS, WINDOWS ETC.) PRIOR TO ROUGH-IN. REVIEW ARCHITECTURAL INTERIOR ELEVATIONS PRIOR TO ROUGH- IN OF EACH AREA FOR ADDITIONAL INFORMATION. G. CONTRACTOR TO FURNISH OCCUPANCY SENSORS WITH COVERAGE PATTERNS APPROPRIATE FOR THEIR INSTALLED LOCATIONS. COORDINATE WITH EQUIPMENT SUPPLIER PRIOR TO BID. H. CONNECT OCCUPANCY SENSORS TO ENABLE ALL SWITCHES IN CONTROLLED SPACE. A 14904 R R T E E O L.Y T T S A E R P O F S NECIL I OSN TIFSROED OHA N I ESD NEL G E R E G H Boise 800 W MAIN STREET SUITE 940 BOISE, ID 83702 208.424.7675 Salt Lake City 52 Exchange Place Salt Lake City, UT 84111 801.531.1144 sheet number: sh e e t t i t l e : stamp: The information and content represented herein is considered by law the architect's instruments of service and are the property of Babcock Design. They are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors, and office personnel only in accordance with this notice. They are intended for use only for the project specified and are to be used for no other purpose or project including additions to or modification of the completed project. No part thereof may be copied, reproduced, photographed, modified, published, uploaded, transmitted, disclosed, sold, distributed to others in any way including in digital form, or otherwise used without the prior written consent of Babcock Design. revisions: date: COPYRIGHT © 2019 BABCOCK DESIGN original drawing is 24" x 36" fo r : x sheet information: project information: babcockdesign.com project number: project status: current as of: stamp: 11-19-19 2/3/2020 1:49:42 PM RE X B U R G C A L L C E N T E R BA S E M E N T L I G H T I N G P L A N E301 2N D E A S T S T R E E T M A I N S T R E E T RE X B U R G , I D A H O CD SET 11-19-19 19062.01 MO U N T A I N A M E R I C A C R E D I T U N I O N 0'4'8'24' SCALE: 3/16" = 1'-0" 16' N S EWE301 1 BASEMENT LIGHTING PLAN num. description date 1 Revision 1 1-15-20 2 CITY COMMENTS 2-3-20