Loading...
HomeMy WebLinkAboutValue Engineering Options with Jerome BowenGA to me eoWen 6 Ifonsftuction PO fl. a ;5 Ra,.nu.0. Idaho 83440 Phnnr: 1.08)356-3934 Au: (2081356 0698 Project: Baseball Quad Date: 3/4/2020 Customer: City of Rexburg Attn: Brett McDermott / Keith Davidson Re: Value Engineering Options Value Engineering Options Description Quantit Unit Unit Price Total Option #1 Change 6-5/8" posts to 4" posts on all backstops Option #2 Remove angled top of backstop Option #3 Change all 8" mainline from class 200 to Sch 40 PVC Option #4 City provides pit run and delivery Option #5 City provides 3/4 road base and delivery Option #6 City provides topsoil source within 1 mile from jobsite (instead of us buying it). JBC would dig, load, and deliver it. Seeding of ground after excavation will be extra. Option #7 City provides and delivers all topsoil needed. (this deduction is additional to the deduction on Option #6) Option #8 Install 3" of crusher fines and 3" of diamond dust instead of 6" of diamond dust. Option #9 Change restroom partitions from plastic to standard metal Option #10 Eliminate testing paperwork, performance data, etc... on standard materials and procedures. Option #11 Change epoxy and sealer to alternate good quality standard products. 1 LS -$19,000.00 -$1 00 1 LS -$7,000.00 -$7,000.00 1 LS -$5,200.00 -$5,200.00 V/ 1000 CY -$9.00 -$9,000.00 lrN(iiy 280 CY 4000 CY 4000 CY 3000 CY -$15.50 -$8.00 -$12.00 -$2.80 1 LS -$2,400.00 1 LS -$1,250.00 -$1,250.00 7III01 1 4a� �0 M -$900.00 -$900.001 IV Q #12 :e vapor barrier and and foundation tar 1 LS -$600.00 -$600.00 �o #13 :e all vinyl flooring and base and seal concrete instead. 1 LS -$2,500.00 -$2,500.00 Option #14 "hange 1st block course from vertical to standard horizontal 1 LS -$1,300.00 -$1,300.00 TOTAL OF DEDUCTIONS 4141,890.00 Notes: 1) Delivery deductions are based on city/county being able to deliver material with as many trucks as JBC needs with one day's notice. (truck quantity needed each day would vary between one and eight) 2) The city may choose which deductions they would like to take. 3) Deductions are based on bid schedule quantities. Please contact us with any questions. Thank you. JEROME BOWEN CONSTRUCTION