Project: Baseball Quad
Date: 3/4/2020
Customer: City of Rexburg
Attn: Brett McDermott / Keith Davidson
Re: Value Engineering Options
Value Engineering Options
Description Quantit Unit Unit Price Total
Option #1
Change 6-5/8" posts to 4" posts on all backstops
Option #2
Remove angled top of backstop
Option #3
Change all 8" mainline from class 200 to Sch 40 PVC
Option #4
City provides pit run and delivery
Option #5
City provides 3/4 road base and delivery
Option #6
City provides topsoil source within 1 mile from jobsite (instead of
us buying it). JBC would dig, load, and deliver it. Seeding of
ground after excavation will be extra.
Option #7
City provides and delivers all topsoil needed. (this deduction is
additional to the deduction on Option #6)
Option #8
Install 3" of crusher fines and 3" of diamond dust instead of 6" of
diamond dust.
Option #9
Change restroom partitions from plastic to standard metal
Option #10
Eliminate testing paperwork, performance data, etc... on
standard materials and procedures.
Option #11
Change epoxy and sealer to alternate good quality standard
products.
1 LS -$19,000.00 -$1
00
1 LS -$7,000.00 -$7,000.00
1 LS -$5,200.00 -$5,200.00 V/
1000 CY -$9.00 -$9,000.00 lrN(iiy
280 CY
4000 CY
4000 CY
3000 CY
-$15.50
-$8.00
-$12.00
-$2.80
1 LS -$2,400.00
1 LS -$1,250.00 -$1,250.00
7III01
1 4a�
�0
M
-$900.00 -$900.001 IV Q
#12
:e vapor barrier and and foundation tar 1 LS -$600.00 -$600.00 �o
#13
:e all vinyl flooring and base and seal concrete instead. 1 LS -$2,500.00 -$2,500.00
Option #14
"hange 1st block course from vertical to standard horizontal 1 LS -$1,300.00 -$1,300.00
TOTAL OF DEDUCTIONS 4141,890.00
Notes:
1) Delivery deductions are based on city/county being able to deliver material
with as many trucks as JBC needs with one day's notice. (truck quantity
needed each day would vary between one and eight)
2) The city may choose which deductions they would like to take.
3) Deductions are based on bid schedule quantities.
Please contact us with any questions.
Thank you.
JEROME BOWEN CONSTRUCTION