HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00557 - Upper Valley Ear, Nose, & ThroatPermit Inspection Summary Permit Status of (Open) as of Report Date: 03/05/2020 10:35 am Permit Details Permit Number: 12-00557 Upper Valley Ear Nose & Throat 256 N 2nd E New Commercial Building Permit Issued Date: 03/03/2014 Permit Inspection Statistics 27Total Inspections Completed: 22Total Inspections Passed: Inspection Pass Rate: 81.48% Permit Inspection History *Refer to Individual Inspection Report for more Details 03/05/2014PassJoel GrayPublic Works Final Inspection approved with cond. - see condition tab for more info.Inspector Comments: 03/05/2014PassNatalie PowellPlanning and Zoning Final Inspection Building Inspection Type 04/26/2013Pass Footing Inspection labs good, vertical bars/ bent onsite.Inspector Comments: 04/29/2013PassQuinton OwensFoundation Inspection 3 #4 horiz. rebar and Vertical #4 rebar at 24" o.c. (send copy of engineer's approval for foundation change from crawl space to slab on grade). Inspector Comments: 6/28: Exterior sheathing approved. 3 hold down straps need fix or eng'r approval.Inspector Comments: 08/16/2013FailQuinton OwensFraming/Structure Inspection 8/16: Some anchor bolts only partially through nuts and some on west wall not done at all. Truss tie downs needed at front canopy. Hangers missing at north end of trusses G1B,G1C, & G1D. Add studs missing at point loads as discussed. Submit Flood Elevation Certificate (asap). ADA bathroom in middle has toilet too far from side wall. Inspector Comments: 08/20/2013FailQuinton OwensFraming/Structure Inspection 8/20,QO:Point load just East of front entry still missing stud. Middle ADA bathroom toilet too far from side wall (add backing at 54" from back wall for grab bar). Need Flood Elevation Certificate. Inspector Comments: 08/23/2013PassQuinton OwensInsulation Inspection Blown cellulose in walls. Windows U factor = .30. Ducts insulated to R-8 Doors & windows sealed around perimeters. Inspector Comments: 9/3,QO: Surgical portion (west side) not done. Rest of building done. 1" clearance req'd around B-vent. Inspector Comments: 10/28/2013PassQuinton OwensSheetrock/Drywall Inspection 10/28/13, QO : Sheetrock Screw (1000 sq ft) - missed some screws on east wall of north surg. room. *AP for drywall* Inspector Comments: Page 1 of 4 (Continued) Permit Details Permit Number: 12-00557 Upper Valley Ear Nose & Throat 256 N 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 03/05/2020 10:35 am Permit Inspection Summary 12/05/2013PassQuinton OwensFraming/Structure Inspection Added studs at point loads done (stop by inspection- not called in) Verified ADA toilet location at initial final inspection. 3/4/14: Elevation certificate received. Inspector Comments: 01/31/2014N/AQuinton OwensSidewalk Inspection Sidewalk already exists along 2nd East. No sidewalk from street to any building further in has been done. Not required? By developer? Inspector Comments: 12/5/13 QO: Final building for temporary C of O - clinical side of the building - buidling final (clinical side only) OK. *AP* Inspector Comments: 01/31/2014PassQuinton OwensBuilding Final 1/31/14: Final building approved. Building numbers on "front" facing "paved alley" (no name street). All buidings should have numbers visible from street they are addressed to (2nd East or 3rd East). Talked with Dale, who is going to follow thru on each building on the same "alley" for posting numbers to satisfaction of Emergency Services. Inspector Comments: Electrical Inspection Type 08/08/2013Pass Commercial Electrical Rough-in Approved for cover-need engineer's letter indicating the changes made in the PACU area-receptacles-inspected the electrical service on this inspection also. They added more receptacles in the PAC-U. Inspector Comments: 08/08/2013Pass COM & MFR Electrical Service Inspection Approved to be energized for permanent power-inspected the electrical service on the rough-in inspection. Inspector Comments: 08/15/2013Pass Commercial Electrical Rough-in 12/03/2013Fail COM, COM-A, COM-R, and COM-T Electrical Final Inspection GFCI protection required in all exam rooms 6' from the edge of the sinks(8), drinking fountain needs GFCI protection, as builts needed before final-possibly emailed as per Andy, OR and procedure rooms portion not done, call for a re-inspect when ready. Inspector Comments: 12/05/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O. in the east portion only for electrical and the entire building for fire alarm. No occupancy for the west portion(OR). Inspected the fire alarm on this inspection as well. Inspector Comments: 01/30/2014Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O. in the west portion.Inspector Comments: Page 2 of 4 (Continued) Permit Details Permit Number: 12-00557 Upper Valley Ear Nose & Throat 256 N 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 03/05/2020 10:35 am Permit Inspection Summary Fire Inspection Type 01/31/2013Pass Fire Department Final Inspection 12/9 Hang extinguishers in approved locations. Install Knox Box on exterior of building. Inspection covered the clinic only. Additional inspections required for remainder of building. DP Inspector Comments: 01/31/2013Pass Fire Department Final Inspection 1/31 MW: **Approved per Mike Walker** Fire Inspection - knoxbox lock on or side of building. knoxbox lock with master key 1/31/14 1415 Inspector Comments: 08/15/2013Pass Fire Alarm Rough-in Approved for cover-inspected the fire alarm wiring on the electrical rough-in inspection. Inspector Comments: 12/05/2013Pass Fire Alarm Final Inspection ApApproved for a final and C.O. in the east portion only for electrical and the entire building for fire alarm. No occupancy for the west portion(OR). Inspected the fire alarm on this inspection as well. 24 Hour 5 minute test-AC loss 11:27AM 12/4, witnessed test, AC restored 11:42AM 12/5/13, witnessed all signalling and initiating devices operation throughout building.proved for a final and C.O. in the west portion. Inspector Comments: 12/10/2013N/A Fire Sprinkler Rough-in Mechanical Inspection Type 8/20,QO: Mech rough - Finish insulation on elevated ducts in attic. Ductwork over operating room not done (waiting for dropped ceiling). Inspector Comments: 10/28/2013, QO: need mech. rough-in approval above North surg rm (still accessible?) Have not corrected water closet ADA requirement in central restroom (location to side wall). *DA* Inspector Comments: 01/16/2014PassQuinton OwensHVAC Rough-in 1/16/14: Rough in item from 10/28 approved at final. Inspected through attic access. Inspector Comments: 12/6/2013 QO: Mech Final for Temp. C of O - clinical side of the buidling - clearance around WH vent. -Drain pans placed under furnaces. *DA* Inspector Comments: 12/16/13 QO: Mech Final OR - finish mechanical in OR mech room. -avoid kinks in flex duct in attic. -label dryer vent effective length -add missing register. *DA* Also reinspected clinic side and Approved. Inspector Comments: 01/31/2014PassQuinton OwensHVAC Final Inspection 1/31/14: Mech. Final for entire building approved.Inspector Comments: Page 3 of 4 (Continued) Permit Details Permit Number: 12-00557 Upper Valley Ear Nose & Throat 256 N 2nd E New Commercial Building Permit Status of (Open) as of Report Date: 03/05/2020 10:35 am Permit Inspection Summary Plumbing Inspection Type 05/21/2013Pass Plumbing Sewer 05/22/2013Pass Plumbing Water 07/15/2013Pass Plumbing Rough-in All good to cover the roughinInspector Comments: 01/29/2014Pass Plumbing Final Inspection 11/27 - All good in the east side of building. need to look at west.Inspector Comments: 01/29/2014Pass Plumbing Final Inspection 11/29- westend - all good for the C/oInspector Comments: Page 4 of 4