HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00481 - MMH Grounds Maintenance AdditionPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 02/25/2020 1:41 pm
Permit Details Permit Number: 12-00481
MMH Grounds Maintenance Addition
24 N 4th E
Commercial - Addition
Permit Issued Date: 07/14/2014
Permit Inspection Statistics
15Total Inspections Completed:
11Total Inspections Passed:
Inspection Pass Rate: 73.33%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
11/01/2012PassPLL ADMINFooting Inspection
As per Jon Berry. OKInspector Comments:
11/02/2012PassQuinton OwensFoundation Inspection
Rebar as per plans. Vert's at 24" oc & Horiz's 12" oc w/ 2 in top and bottomInspector Comments:
02/14/2013FailQuinton OwensFraming/Structure Inspection
HDU5-SDS2.5 requires double stud. 2 blocks missing (removed)
Approved for Insulation only (R-19 OK)
Inspector Comments:
03/20/2013FailQuinton OwensBuilding Final
No reinspect on framing or insulation not approved for cover. (submit photos or
uncover for inspection). Mezzanine/stairs added in bldg - to be reviewed (floor
framing, partially enclosed under stairs w/out drywall, stair handrail guardrails)
Inspector Comments:
Passed based on Passed insulation inspectionInspector Comments:
07/14/2014PassQuinton OwensFraming/Structure Inspection
PARTIAL APPROVAL:
Insulation approved for fire blocking. Contractor claimed to have added the
additional stud for the hold down (no confirmation)
Inspector Comments:
07/14/2014PassPLL ADMINInsulation Inspection
R-19 installed in walls. Roof insulated above sheathing. Need to insulate exterior
at truss cavity.
Inspector Comments:
09/26/2016PassQuinton OwensBuilding Final
No design submitted for review on storage mezzanine. Live load limited to 40 lb
and must be posted as such, or submit design for storage load (125 psf standard
for light storage).
Inspector Comments:
Electrical Inspection Type
02/14/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover-grounds maintenance building addition-GFPE protection is
required for heat tape installed-will inspect on the final, notified electrical
contractor.
Inspector Comments:
03/21/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.-maintenance addition only.Inspector Comments:
Page 1 of 2
(Continued)
Permit Details Permit Number: 12-00481
MMH Grounds Maintenance Addition
24 N 4th E
Commercial - Addition
Permit Status of (Open) as of Report Date: 02/25/2020 1:41 pm
Permit
Inspection
Summary
Mechanical Inspection Type
03/20/2013FailQuinton OwensHVAC Final Inspection
1" clearance required around B-vent.Inspector Comments:
09/26/2016FailDon AllenHVAC Final Inspection
Good for the C/OInspector Comments:
09/26/2016PassDon AllenHVAC Final Inspection
Plumbing Inspection Type
03/26/2012PassDon AllenPlumbing Water
03/26/2013PassDon AllenPlumbing Rough-in
03/26/2013PassDon AllenPlumbing Final Inspection
All good for C/OInspector Comments: