Permit Status of (Open) as of Report Date: 02/18/2020 3:10 pm
Permit Details Permit Number: 12-00392
Mesa Falls Apts Bldg #2
940 S 5th W
New Multi-Family Residence
Permit Issued Date: 02/27/2014
Permit Inspection Statistics
26Total Inspections Completed:
21Total Inspections Passed:
Inspection Pass Rate: 80.77%
Permit Inspection History *Refer to Individual Inspection Report for more Details
01/02/2014PassDale PickeringFire Underground Inspection
Building Inspection Type
04/22/2013PassQuinton OwensFoundation Inspection
2 #4 horizontal rebar. Vertical rebar should be 18" oc. Vertical dowels in footing
occasionally at 19 - 21" oc.
Inspector Comments:
05/20/2013PassQuinton OwensFooting Inspection
4/19, 2 - #4 rebar cont. and supported.
Ufer installed in footing in each side building.
5/10, QO: Interior footings ok to pour 2 #4 rebar supported on chairs.
Inspector Comments:
09/12/2013Fail Sheetrock/Drywall Inspection
rm 207 & 208 - fire caulk above tub.
2105 2206 split insulation to go behind wires
205 fire caulking
2106 repair or replace broken stud, fire blocking missed.
207 concealed space missed blockig
Inspector Comments:
09/12/2013Fail Sheetrock/Drywall Inspection
Insulation 2301 302 303 & 304 covered before inspected
2201 concealed space/ fire caulk below washer box
2203 fire caulking
2202 fire caulking
2204 fire caulking
Inspector Comments:
09/12/2013Pass Sheetrock/Drywall Inspection
09/20/2013FailQuinton OwensSheetrock/Drywall Inspection
sheetrock screw - 1st floor bldg #2 - 1st floor ok to tape
except fire rated boxes for sprinkler pipe (not done). (101-flex duct not allowed
as penetrating item).
Inspector Comments:
11/01/2013Pass Sidewalk Inspection
9/4,QO: 3rd floor ok to insulate.Inspector Comments:
9/17,QO: Interior shear wall panels. Done.Inspector Comments:
12/26/2013PassQuinton OwensFraming/Structure Inspection
9/24,QO: fire caulk reinspect in breezways and fireboxes for sprinkler pipe
crossing corridor.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 12-00392
Mesa Falls Apts Bldg #2
940 S 5th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 3:10 pm
Permit
Inspection
Summary
12/30/2013Pass Building Final
OK 201 102 103 104 201 202 204 301 302 303 304 105 106 107 108 205 206 207
208 305 307 308 - ok
strap on water heater lose at 306 - fixed while i was there
203 - gas smell. fixed as well.
Inspector Comments:
Electrical Inspection Type
08/21/2013Pass Commercial Electrical Rough-in
Approved for cover in all 24 units of building #2-also inspected the electrical
service on this inspection, also for fire alarm wiring.
Inspector Comments:
08/21/2013Pass COM & MFR Electrical Service Inspection
Approved to be energized for permanent power-inspected the electrical service
on the rough-in inspection.
Inspector Comments:
12/20/2013Pass COM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. building #2 only.Inspector Comments:
Fire Inspection Type
01/02/2013PassDale PickeringFire Sprinkler Final Inspection
08/21/2013Pass Fire Alarm Rough-in
Approved for cover in all 24 units of building #2-also inspected the electrical
service on this inspection, also for fire alarm wiring.
Inspector Comments:
09/23/2013PassDale PickeringFire Sprinkler Hydro
Bldg #2; Hydro at #200 psi - PassInspector Comments:
12/19/2013Pass Fire Alarm Final Inspection
Approved for a final and C.O.-fire alarm only, witnessed all signalling and
initiating device operation, 24 hour/5minute test from 3:30PM 12/18 to 3:45PM
12/19 for AC restored, flow switch(36 seconds) and tamper switches(2)
operational-witnessed, panel had 2 hour delay for AC loss because of dip switch
#6 on panel as per Gary with Omni, report in file.
Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 12-00392
Mesa Falls Apts Bldg #2
940 S 5th W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 3:10 pm
Permit
Inspection
Summary
Mechanical Inspection Type
9/4,QO: 3rd floor approved except b-vents not done. (reinspect with insulation)Inspector Comments:
9/12,QO: 2nd floor approved (fir out wall at b-vent in 203 with 1" clearance to
drywall).
Inspector Comments:
9/17,QO: 1st floor approved (Firecaulking needed all around dryer vents for
final-see 203,103, and 106). Finish "fire boxes" with dampers where sprinkler
lines crosses breezeway.
Inspector Comments:
09/23/2013PassQuinton OwensHVAC Rough-in
9/23,QO:Dampers at sprinkler pipe thru brzwy done.Inspector Comments:
12/27/2013FailQuinton OwensHVAC Final Inspection
Firecaulk around B-vents on 1st floor at gaps between metal shield and drywall.
Firecaulk, not fireblk, at living room dampers (101,202,207,107). Gas odor near
regulator or connections in 103, 306, 207(csst). Vent limiter missing on regulator
in 307. Fix connection between vent connector and B-vent at water heater.
Inspector Comments:
12/31/2013PassQuinton OwensHVAC Final Inspection
12/30: 108 still has gas odor by CSST connection by furnace.(green wires are
separated on top of furnace. OK?)
12/30: Don Allen approved 108 fix.
Inspector Comments:
Plumbing Inspection Type
05/16/2013Pass Plumbing Underground Inspection
all good to cover the ground workInspector Comments:
10/25/2013Pass Plumbing Water
10/25/2013Pass Plumbing Sewer
10/25/2013Pass Plumbing Rough-in
12/24/2013Fail Plumbing Final Inspection
need duply on toilet in the master bath 1stfloop north west apt
t&p droops
dishwashers need hooked up
Inspector Comments:
01/02/2014PassDon AllenPlumbing Final Inspection
Don stated that he went back and reinspected final.Inspector Comments: