Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Issued Date: 02/19/2014
Permit Inspection Statistics
84Total Inspections Completed:
65Total Inspections Passed:
Inspection Pass Rate: 77.38%
Permit Inspection History *Refer to Individual Inspection Report for more Details
05/31/2013PassDale PickeringFire Underground Inspection
underground hydro - 1300 - 200 psi
1500 - 200 psi
Ok to cover
Inspector Comments:
11/04/2013PassDale PickeringFire Underground Inspection
Building Inspection Type
11/01/2012PassPLL ADMINFoundation Inspection
*as per jon berry - west side foundation looks good.Inspector Comments:
12/10/2012PassQuinton OwensFooting Inspection
10/22, JB: ext.west half of bldg A looks good- no int. footing
11/1 Ext. Footing completed with 2 pass thrus
12/5,QO: Partial interior footing approved.Forsgren also on-site.
12/6,QO: Interior footings w/ slab approved. Forsgren doing spec. insp.
12/10,QO: Spot footings approved for pour.
Inspector Comments:
03/15/2013FailQuinton OwensFraming/Structure Inspection
3/15,QO: Framing 1st floor- Rated ceiling OR Fire separation between deck and
top of CMU wall? Firerating at conc. slab penetrations. Disapproved.
Inspector Comments:
04/05/2013FailQuinton OwensFraming/Structure Inspection
4/5,QO: Firecaulk penetrations in CMU wall between units. Drain pipe
penetrations not protected at rated ceiling. Washer boxes in fire partitions are
not rated.
Inspector Comments:
04/22/2013PassQuinton OwensFraming/Structure Inspection
Stair Tower (NW corner) - OK to pour stairs NW corner
no reinforcement required.
Inspector Comments:
04/24/2013FailQuinton OwensFraming/Structure Inspection
sheathing 3rd flr,section 1- Some missed locations, marked w/ red crayon on
studs.
Inspector Comments:
Page 1 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
05/17/2013FailQuinton OwensInsulation Inspection
5/17/13 QO: Insulation (South floor sec. 1, six units) - Drywall behind soffits. Fire
caulk penetrations at above location. Fire caulk penetrations into floor and
bottom plts. One washer box not rated (west side unit - 2nd from south). Multiple
grab bar backing removed. Mechanical ok in hallways/ unfinished over
bathrooms. *DA* Action required: reinsert above items.
Inspector Comments:
06/28/2013FailQuinton OwensInsulation Inspection
6/28, QO – insulation – 501,508 – ok for drywall (except dropped clg at ext for
ext wall inspection).
516,517,509 – no insulation inspection or fire partition inspection (to the roof
deck) *not approved for dry wall*
Inspector Comments:
07/15/2013FailQuinton OwensFraming/Structure Inspection
Sect 2 3rd Fl - 316: missed some exterior nailing (see crayon marks). -2hr rating
at PVC penetration at exterior wall in ceiling above washer hookups. -Finish 2hr
rating at elec. cables. - Penetrations not done at Bathrooms.
309: nails missed stud (ext) in SW corner
317: OK to insulate.
OK to insulate ext. walls only.
Inspector Comments:
08/20/2013PassQuinton OwensInsulation Inspection
8/20/13 QO: Fire Caulking & Insulation (5th Floor) - common area set 2. 2 hr
rating not extended to roof deck around stairs, elevator & utility rm. - Apts in sect
3 fire rating not to roof deck around apt's. *DA*
Inspector Comments:
08/30/2013FailQuinton OwensInsulation Inspection
8/30/13 QO: Insualtion & Fire Caulking (Rooms 404-406) - 404: hole in top plate
b/w back 2 bdrms not fire caulked. Drywall joist at jog in ext. wall. 405: need
drywall for rating at ext. wells at floor joist level. at jog in wall and SE corner of
apt. Also fix water line penetration on 5th mwall (joist lvl). 406: stair well shaft
wall needs 2 layer drywall at floor joists and welps filled (same as exterior) Fix
ext wall rating on north wall. check w hilti on fire caulking horizontal popes.
Inspector Comments:
09/04/2013FailQuinton OwensFraming/Structure Inspection
Fraiming #303-306 - 306- Joist at stairwell to have same ratings as exterior
walls/ jog in wall by fresh air vent has open gap between drywall & joist, also
above 2nd bdrm window.
South & North Ext. Walls: Plastic pipe need to have fire caulking sufficient to
protect penetration of drywall. 304: Gap between joist & drywall at jog in 304.
*Note: 316 not reinspected for rating at electrical cables. (Nth wall soffit) *DA*
Inspector Comments:
09/09/2013N/AQuinton OwensSheeting
exterior sheeting - outside covered w masonry & eifs
bandged wall from inside (appeared to be solid) *did not inspect*
Inspector Comments:
Page 2 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
09/10/2013FailQuinton OwensFraming/Structure Inspection
Fire Caulking & Framing (4th floor hall of section 3) - 3rd & 4th common area
south & north exterior and north side mech. need 2 layers drywall to deck above.
Hall 4th flr (sect 3) 2 layers needed on exterior above windows to below joists
*DA*
Inspector Comments:
09/11/2013FailPLL ADMINFraming/Structure Inspection
Fire Caulk (Section 1&3, lvl 5 utility room) - "5th lvl" rate walls up to roof deck &
fire caulk. *DA 5th flr*
3rd lvl framing approved. Insulation approved.
Inspector Comments:
09/11/2013PassQuinton OwensFraming/Structure Inspection
5/17,QO: 5th floor drywall needed behind soffits (Fire partitions go to roof deck
on top floor).
6/14 QO: Sec 2, 5th flr. 3 apts – exterior sec 2 5th floor missed ext nailing at
marked locations (red crayon)
7/29,QO: NE Hall 3rd floor approved for cover.
8/2,QO: 208 approved for cover. 201 East shear wall not ready (insul. ok) 207 &
202 missing exterior drywall at floor joists, including jogs in wall. 5th flr, East hall
penetrations fireclkd but missing 2nd layer on ext wall above ceiling between sect
2 & 3.
7-25-12TD tyvec on 3rd floor on West,NW corner of building
9/4/13 QO: Fraiming #303-306 - 306- Joist at stairwell to have same ratings as
exterior walls/ jog in wall by fresh air vent has open gap between drywall & joist,
also above 2nd bdrm window.
9/11/13 QO: 3rd lvl framing approved. Insulation approved.
9/11/13 QO: Fire Caulking (Secition 3, Brd Floor Hall & Stair Tower 2) - Stair
Tower: Tighten anchor bolts 2nd floor, patch drywall above sprinkler pipe
2nd/3rd floor.
-4th floor: sect 3 hall-good; common area - good expt north side of utility. *DA
north side of utility 4th*
3rd floor common area: done, approved for insul. Section 3 hall framing
approved.
9/11/13 QO: Fire Caulking & Framing (elevator mech room, lvl 3-5) – fire damper
at 2hr shaft penetration (mech)
-Fire caulk penetrations in 2hr wall above ceiling.
Inspector Comments:
09/13/2013FailTed DyeFraming/Structure Inspection
fire caulking & framing - 2nd lvl sec 3 - rm 206 fire caulk power cable
rm 203 - fire blocking (both marked with green pen)
Inspector Comments:
09/25/2013FailQuinton OwensInsulation Inspection
9/25/13 QO: Fire Caulking & Insulation (2nd floor common area) - Firecaulk
penetrations near door to stairs. Gaps b/w joists and dry wall (at shaft) to be
rated. - 2 open ends in duct in soffits (end floor common area) - Fire caulk gap
b/w drywall and soffit frame. -Duct 303-306? *Need to find ect. cables in soffit at
nrth end of 316. (bdrm & laundry). *DA*
Inspector Comments:
Page 3 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
09/30/2013PassTed DyeFraming/Structure Inspection
Reinspect (2nd flr commons area) - joints and seams fire caulked.Inspector Comments:
9/5/13 OQ: Sheetrock - Rooms 403-405 – 403 – ok to tape. 404 – ok to tape
(add screws to missed location indicated to hangers) 405 – ok to tape.
Inspector Comments:
9/6/13 QO: Sheetrock – Rooms 503-506 – ok to tape.Inspector Comments:
9/6/13 QO: Sheetrock – Room 406 – ok to drywall.Inspector Comments:
9/9/13 QO: Exterior Sheeting - outside covered w masonry & EIFS. Banged wall
from inside (appears to be solid). *Did not inspect*
Inspector Comments:
9-30-13 QO: Approved ticket issued on 9-25-13 all except fire caulk gap between
drywall and soffit frame and this was corrected while I was there.
Inspector Comments:
10/02/2013PassQuinton OwensSheetrock/Drywall Inspection
10/2/13 QO: Sheetrock – Room 205&206 – 205: add screws above tub by
showerhead and on wall behind toilet in same bathroom.
Duct penetrations in 303-306 approved, also 203-205 approved.
Inspector Comments:
4/18,QO: Insulation/thermal break around windows against CMU walls missing
(CMU too tight around windows) Insulation missing at exterior sides of floor
ceiling assemblies.
Inspector Comments:
4/23,QO:Insulation OK. No fire rating on Roxul batt insulation behind washer
boxes.
Inspector Comments:
5/7,QO: 2nd floor corridor, section 1, approved for drywallInspector Comments:
5/17,QO: Insulation approved.Inspector Comments:
5/17,QO: 5th floor- Non-fire rated ceiling requires fire partitions to extend to roof
deck (sheetrock behind all soffits - exterior requires 2 layers). Firecaulk(FC)
penetrations at these locations. Washer box not rated in 2nd unit from
south(west side). Some grab bars backing removed. Mechanical OK in hallways/
UNFINISHED in bathrooms.
Inspector Comments:
5/23,QO: Penetrations not all firecaulked between apt & corridor.Inspector Comments:
5/31,QO – Insulation (4th floor, 410,411,413,414,415) fire caulk wire
penetrations in stud intersecting partition walls. (btw laundry and bedroom) Ok
to drywall. One window in 415 not sealed (being changed)
Inspector Comments:
6/4, QO – Insulation – 4th floor corridor – ok to dry wall 4th floor corridor. 3rd
floor ductwork and FC #311 dryer and drains (also #314) need fire caulking.
Inspector Comments:
7/9,QO: 4th floorInspector Comments:
7/9/13 QO: 401,402,408,416. Insualtion ok.Inspector Comments:
7/10 QO: 417 – ready for dry wall.
416: fire caulking not done at bathroom and electrical penetration by living room.
402: hole over electric panel in top plate.
407: ok for hang drywall.
401: seal window in bdrm next to lvng room.
409: ok for drywall
408: bathroom wall (in btw) seal top plate.
Inspector Comments:
7/19 QO: Insulation (308,309,317) – ok to hang drywall.Inspector Comments:
7/22, QO: Insulation (301,302,307) – ok to drywallInspector Comments:
Page 4 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
7/24/13: Units 401, 402, 407, 408, 409, 417, 416. Fire caulking hvac on
perimeter walls. Approved per Val Christensen.
Inspector Comments:
7-26-13 TD: 216 and 217 insulation and fire caulking OK
\4th floor section 2: insulation an fire blocking OK
Inspector Comments:
7/29,QO: NE Hall insulation approved.
7/29, QO: corridor on 3rd floor: ok to dry wall
Inspector Comments:
7-30-13 TD room 209 Insulation and fire caulking OKInspector Comments:
8/2,QO: 207 and 202 insulation approved Reinspect framing items before
drywall.Sect. 3, 5th flr East hall not completed. 208 insulation approved.
Inspector Comments:
8/6 QO: blocking at ext. joist – 202,207,208 – ok to hand dry wall.Inspector Comments:
8/9, QO: 109 – ok to hang dry wall.
116 – ok to drywall.
Inspector Comments:
8/12 – 108, 101 – ok to hang dry wall.Inspector Comments:
8/13 QO: 101,108 approved.
117: done (except back bedroom not done yet due to electrical cables)
Inspector Comments:
8/15 QO: 102,107 – ok to hang drywall. (102 2 pvc pipes need fire caulking at
top plate and blck under fresh air duct above bdrm door – reinspected on 8/16)
Inspector Comments:
8/16 QO: 102 ok to hang dry wallInspector Comments:
8/27 QO: 5th floor- fire sep up to roof deck (ceiling not rated)Inspector Comments:
8/29 QO: 403 – insulation and fire sep ok
**4th floor framing/ext sheath inspection never scheduled & not done.
Inspector Comments:
9/5 QO: 303,304,305,306 ok to insulate walls & ceiling, framing ok. Action
required: finish stair well, fire sep. in 306 and 305 south hall.
Inspector Comments:
9/9 QO: 303-306 – approved for hanging drywall.Inspector Comments:
9/12 QO: Insulation (3rd & 4th lvl, common area, and hall sect. 3) – sealing
ducts? Not done (DA) 4th lvl – seal around north window (common area), 3rd lvl
– finish insul at joist on south wall common area.
Inspector Comments:
9/13 QO: Insulation (2nd stair tower) – windows sealed, ext walls blown, int
walls insulated, ceiling insulated.
Inspector Comments:
9/16 QO: Fire Caulking & Insulation (Stair tower 3) – stair #3 approved for
insulation, sect 3 flr 2 items completed for framing, approved for insul.
Inspector Comments:
9/17 QO: Insulation Units 203-206 – mech rough not ready to cover, insulation
approved.
Inspector Comments:
9/18 QO: Insulation & Fire Caulking (2nd flr, sec 3 hallway) – add 2nd layer of
drywall above dropped ceiling at window (westwall)
Inspector Comments:
9/20 QO: Insulation (stair tower 3) – ok to cover.Inspector Comments:
10/8 QO: Insulation Room 103 & 104 and insulation & fire caulking lvl 1-3 section
corridor – insulation done at exterior walls, doors and windows sealed.
Inspector Comments:
10/09/2013PassQuinton OwensInsulation Inspection
10/9 QO: Framing, fire caulking & insulation rooms 105-106 –
framing/firecaulking and insulation done and approved for cover. (105 – 10/9 &
106 -10/11).
Inspector Comments:
10/16/2013PassQuinton OwensFraming/Structure Inspection
Section 3 corridor on levels 1,2,&3.Inspector Comments:
Page 5 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
03/20/2014FailQuinton OwensBuilding Final
Typical all units: Rated wall behind middle vanity (no tub/shower behind it),
kitchen sink and laundry; these need firecaulk around drains in drywall and metal
covers over cleanouts. Some cleanouts not found behind dryers and might still be
covered - refer to plumbing insp. unrated boxes in hall ceiling at several
locations. 1102: fc data line in mech closet. 1103 tape or frclk joints in mech
closet clg patch. Utility room not done (incl. beam pockets on sth wall). 1105 fc
drywl patch on mech clst clg. 1109: patch clg in lndry. Smk Det missing in last
bdrm. SD too close to corner in 1st bdrm. 1113 seal tub/shwr perimeters. 1115
SD too close to corner. 1117 SD close to corner. 1114 seal chip at base of tub.
light switch not working in 1st bdrm. East utility penetrations not f.c. 1112 seal
around shwrs. SD too close to supply rgstr. 1110 missing sply rgstr in 1st bdrm.
1108 finish seal around tub. Utility rooms on east & west are not finished for fire
rated penetrations (West utility on 1st floor also has beam pockets not filled with
concrete and needs fire rating). Can Mech. engineer verify why duct penetrations
in Utility "shaft" do not show combination Fire/Smoke dampers and only have
Fire dampers? Not all exit signs are readily visible as required by code. No exit
sign by door in west or east hall (will verify requirements).
Inspector Comments:
Levels 4 & 5: 1511 missing light fixture in mech. closet. 1510 & 1515 seal duct at
connection w/ furnace. 1515 Fan does not work in "on" position. All units: gas
line penetration on side of furnace to be sealed on direct vent furnaces. Cover
still on fire alarm on stair C. 1507 fresh air intake incomplete. Game room: fire
alarm cover on. 1510: ADA vertical grab bar to be 39 - 41" from back wall. shelf
in laundry interferes with clearance. 1508: leak between kitchen & entry. 1401
orange foam not a fire stop (mech closet). 1403 S.D. in 2nd bdrm not connected.
1405 hole in clg in mech closet above door. 1407 Open tube penetrating ceiling
above door in mech closet. Utility rooms behind elevator: FC wall penetrations;
firedamper on 4th floor (2 locations)? 1402: orange foam not a fire stop (mech
room). 1413: missed fire caulk under 3rd vanity. 1417 S.D. not connected
(middle & last bdrm).
Inspector Comments:
Level 3: Utility rooms need non-absorbent surfaces around mop sink. Utility room
by elevator: fire stop hole and duct penetration on wall by door. 1307: Orange
foam is not a fire stop (above door in mech room). 1305 hole in ceiling of mech
room above door. 1303 finish seal around shower in 3rd bathrm. Finish ceiling
patch around sprinkler in laundry. 1312 mech room locked shut (no inspection).
Level 2: 1203 tape on clg. 1205:non-operable window in last bdrm. check ac line
to furnace - found frost on pipe and making noise. North utility: seal around duct
penetrations. 1211 metal cleanout cover needed under sink. 1213 middle tub
needs caulking by door. 1215: seal duct/furnace connection. 1217 S.D. right in
corner (2nd bdrm). 1214: S.D. too close to corner (2nd & 4th bdrm). 1210: install
cover box for wires in furnace. 1312: seal duct/furnace connection.
Inspector Comments:
Level 3;
1302; fire caulk around water pipes just inside mech. closet. Fire caulk around
dryer vent.
Inspector Comments:
Page 6 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
04/03/2014FailQuinton OwensBuilding Final
3rd floor
1313 Caulk missing aroundpipe in 3rd vanity
1311hole in ceiling behind furness needs to be patched better
1301 check dryer vent
Inspector Comments:
04/03/2014PassQuinton OwensBuilding Final
Page 7 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
Electrical Inspection Type
04/08/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the 4 west units and 2 east units in the west portion of the
building-building A.
Also inspected the fire alarm wiring in these noted units.
Inspector Comments:
04/22/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover-south 4 units on the west side and on the second floor-fire
alarm and electrical was inspected on this inspection.
Inspector Comments:
05/02/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover-corridor on the main level, second level, and third level up to
the end of section 1 going north, also last two units on the second level in section
1 (north portion), and the most south four units on the third level in section 1.
Inspector Comments:
05/10/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the southwest units on the 5th floor-SER cable is not
installed-will re-inspect on corridor inspection.
Inspector Comments:
05/21/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the last two units on the third floor on the north of section
1, also in the corridor of this section.
Inspector Comments:
05/23/2013Pass Commercial Electrical Rough-in
Approved for cover in the first 5 units from the south on the 4th level not
including the corridor.
Inspector Comments:
05/29/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the following areas, last unit on the 4th level before the
break in the corridor, 4th level corridor, 1st level 2nd unit from the south on the
right (east) side, south stairwell from the first to the 5th level.
Inspector Comments:
06/13/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #509, 517, and 516-as per Jane Shaw.Inspector Comments:
06/26/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #501, 508-north side section 2-inspected the fire
alarm also in these units.
Inspector Comments:
06/28/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #502 and 507 and 5th level corridor-west and
northwest area only.
Inspector Comments:
07/03/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units # 401, 402, 407, 408, 409, 417, and 416 for electrical
and fire alarm wiring.
Inspector Comments:
Page 8 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
07/16/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in section two, third level, in the west corridor, lobby area,
and units #302, 307, 301, 308, 309, 317, and 316 for electrical and fire alarm
wiring.
Inspector Comments:
07/24/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #216, 209, and 217. Inspected the electrical service
on this inspection also on the west side only-2 services.
Inspector Comments:
07/31/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover on level 2 corridor section 2, level 4&5 corridor section 3, and
units #208, 201, 207, and 202 for electrical and fire alarm-inspected both on
same inspection.
Inspector Comments:
08/08/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #101, 108, 109, and 117 for electrical and fire alarm
wiring.
Inspector Comments:
08/14/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #107 and 102 in the 1st level section 2 for electrical
and fire alarm wiring.
Inspector Comments:
08/19/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #503, 504, 505, and 506 and also in the elevator
lobby area on the 5th level.
Inspector Comments:
08/26/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #406, 405, 404, 403, for fire alarm and electrical also
including the lobby area and section 3 corridor of the fourth level.
Inspector Comments:
09/04/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #305, 306, 304, 303, and corridor in section 3 level 3
and also the stairway in section 3 from level 1 to 5 (all levels).
Inspector Comments:
09/06/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the north stairway in section 2, utility rooms #503, 509,
and 305 for electrical and fire alarm wiring.
Inspector Comments:
09/12/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #203, 204, 205, 206, and elevator utility rooms on
levels 2, 3, 4, 5, and corridor on 2nd level of section 3, and the lobby on the
second level.
Inspector Comments:
09/17/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in the utility room in level 3 section 1.Inspector Comments:
09/24/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units # 103, 105, and lobby area, and corridor in section 3
level 1, for electrical and fire alarm wiring.
Inspector Comments:
Page 9 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
10/07/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover in units #104, 106, and the west unit on level 1 section 3
south end, utility room in section 3 and corridor section 3.
Inspector Comments:
03/05/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final in the units only on all 5 levels in building A sections 2 and 3-
(55 units total).
Inspector Comments:
03/13/2014PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
03/20/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. for electrical only.Inspector Comments:
Fire Inspection Type
03/28/2013PassDale PickeringFire Sprinkler Rough-in
rough to cover (1st floor sect. 1) ok to coverInspector Comments:
06/18/2013PassDale PickeringFire Sprinkler Rough-in
rough to cover (flr 2-4) - 2-5th fllors in bldg a ok to cover.Inspector Comments:
07/22/2013PassDale PickeringFire Sprinkler Rough-in
dry sprinkling system - OK to cover dry system.Inspector Comments:
10/21/2013PassDale PickeringFire Sprinkler Rough-in
rough to cover - sprklr (east side, 1st floor) - 2 nail plates in corner apt.Inspector Comments:
11/04/2013PassDale PickeringFire Sprinkler Rough-in
03/18/2014N/ABret StoddardFire Alarm Final Inspection
03/26/2014FailBret StoddardFire Alarm Final Inspection
03/28/2014PassBret StoddardFire Alarm Final Inspection
04/03/2014PassBret StoddardFire Alarm Final Inspection
04/03/2014PassDale PickeringFire Sprinkler Final Inspection
04/03/2014PassDale PickeringFire Department Final Inspection
Page 10 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
Mechanical Inspection Type
11/06/2013PassQuinton OwensHVAC Rough-in
4/5,QO: Exhaust vent length ok for lower floors?
4/22,QO; 1st floor - firecaulk around ceiling penetrations.Fix gap in ceiling drywall
by fresh air vent in bedroom. (fixed and approved on 4/25)
6/5,QO: Insulation and bath mech. rough section 2 on levels 2,3,4. All approved
EXCEPT 309 and 2 east end units.
9/6,QO: 2nd Insp (Ext wall & ceilng penetrations) OK for
101,102,107,108,109,116,201,202, 207,208,209,216,217.
10/30,QO: 1st floor section 3, Fire rate penetrations in ceiling by bedrm door -
each unit.
11/6,TD: 1st flr, Sect 3. reinsp. and approved.
Inspector Comments:
04/02/2014FailQuinton OwensHVAC Final Inspection
Typical most units: fire separation not complete at mech closet ceilings, esp. at
exhaust vent penetration. 1110 missing sply rgstr in 1st bdrm. Can Mech.
engineer verify why duct penetrations in Utility "shaft" do not show combination
Fire/Smoke dampers and only have Fire dampers? All units: seal gas line
penetration into direct vent furnace.
Levels 4 & 5: 1511 missing light fixture in mech. closet. 1510 & 1515 seal duct at
connection w/ furnace. 1515 Fan does not work in "on" position. 1507 fresh air
intake incomplete. 1401 orange foam not a fire stop (mech closet). Utility rooms
behind elevator: FC wall penetrations; firedamper on 4th floor (2 locations)?
Done in conjunction with Bldg Final - see additional notes on Bldg Final insp.
Inspector Comments:
04/03/2014PassQuinton OwensHVAC Final Inspection
Page 11 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
Plumbing Inspection Type
11/06/2012PassDon AllenPlumbing Underground Inspection
11/07/2012PassDon AllenPlumbing Underground Inspection
11/08/2012PassDon AllenPlumbing Water
showed up at 845am not ready
showed up at 945am not ready
showed up at 345pm test pasted held 100 psi for 15min
charged a $65 re-inspection fee
Inspector Comments:
11/15/2012PassDon AllenPlumbing Rough-in
main line in the apt.part onlyInspector Comments:
11/16/2012PassDon AllenPlumbing Underground Inspection
ground work is all good to cover
its rest the main line
Inspector Comments:
11/19/2012PassDon AllenPlumbing Underground Inspection
11/19/2012PassDon AllenPlumbing Underground Inspection
11/21/2012PassDon AllenPlumbing Underground Inspection
11/29/2012PassDon AllenPlumbing Underground Inspection
All good to coverInspector Comments:
12/03/2012PassDon AllenPlumbing Underground Inspection
12/04/2012PassDon AllenPlumbing Sewer
all good to coverInspector Comments:
12/06/2012PassDon AllenPlumbing Sewer
09/16/2013PassDon AllenPlumbing Sewer
11/20/2013PassDon AllenPlumbing Underground Inspection
ground work is goodInspector Comments:
03/25/2014FailDon AllenPlumbing Final Inspection
water heater t&p needs to be piped to drain
need to find clean outs behind washers
clean out covers in the floor in the hallway 1st floor
need to pull out test ball in utility room
1119 no counter top in kitchen
check hot and cold some are backward
need to fix flapper on toilet
Inspector Comments:
04/02/2014PassDon AllenPlumbing Final Inspection
all good for c/oInspector Comments:
Page 12 of 13
(Continued)
Permit Details Permit Number: 12-00430
NorthPointe Apts Bldg A; 85 Units
141 S 1st W
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/18/2020 11:59 am
Permit
Inspection
Summary
Page 13 of 13