HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00422 - Rexburg LDS 4th Stake CenterPermit Inspection Summary Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am Permit Details Permit Number: 12-00422 Rexburg LDS 4th Stake Center 454 S 12th W New Commercial Building Permit Issued Date: 08/18/2014 Permit Inspection Statistics 26Total Inspections Completed: 19Total Inspections Passed: Inspection Pass Rate: 73.08% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 01/11/2013PassPLL ADMINCommercial Footing Inspection As per Jon Berry, PCW 11/9, JB: REbar and forms look good SWest corner and 1/2 of west footings. 11/13, JB: West 1/2 ok to pour; South 1/2 of East Footing & Rebar looks good 11/19, QO: East side-North half OK. 11/21, QO: North End Footing 3 #4's cont.& #4 vert. at 18" oc staggered 2 sides. (correction: 24" oc.everywhere - only good where horiz. bar is #5) see foundation notes 11/27, QO: Int. column footing (4) #4 each way 12/7, QO: Interior ftgs (Northend) 2 w/8 #4's ea way and 2 w/6 #4's ea way. Partial cont int ftg. 12/11: Int ftgs. cont. from North entry to both side entries. Rebar as per plans. 12/12: Int ftgs. (South side of north hallway) spot ftg & cont. ftg as per plans. 12/14: Partial South Exterior Footings (approved per Don A. description) 12/19: Interior ftg alongside gym East side. 4-#4 bars cont with 6-#4's ea way in spot ftgs. 12/20: Interior ftg alongside gym West side. 4-#4 bars cont with 6-#4's ea way in spot ftgs. 1/02: West side of south chpl. 3 #4 bars cont. 8 #4's in spot ftg. OK 1/03: West side of west hall (south chpl) 3 #4 rebar cont. OK 1/04: West side of west hall (north chpl) 3 #4 bar cont./ spot ftg's per plan. OK 1/11: Front of Chapel. Rebar clearanced corrected at inspection. Approved - QO Inspector Comments: 01/16/2013PassPLL ADMINFoundation Inspection As per Jon Berry. PCW 11/19, QO: West wall-South 1/2 OK. 11/26, QO: 12" walls requires #4 vert at 18" oc. Need rebar clearance at (by room 129) and top clearance between rooms 129&125. 12" WALLS NOT APPROVED. 11/27, QO: Partial East fnd and West 12" wall OK to pour. Engr's repair done: dowel vert #4 between existing for 12" oc spacing both sides. 11/28, QO: North end fnd. Approved. 12/4, QO: 6 #3 ties, 12 #6 verticals 1/16/13: Front of chapel. Rebar as per plans.Approved-QO Inspector Comments: Page 1 of 5 (Continued) Permit Details Permit Number: 12-00422 Rexburg LDS 4th Stake Center 454 S 12th W New Commercial Building Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am Permit Inspection Summary 06/05/2013PassQuinton OwensCommercial Insulation Inspection 4/17,QO: West side ceiling (except for some at north end) R-38, a couple gaps and sections pushed into venting area to be fixed. 4/19,QO: East side ceiling. R38 batts installed properly. End rafter space on north and south ends have blocking that may limit venting. 5/14,QO: North end trusses over mezzanine (R-38 in attic and R-19 in wall.(outer wall not done) 5/16,QO: East side, North chapel/gym up to overflow. R38 ceilings/R19 walls -seal wndws. 5/23,QO: West walls R19 (windows not yet sealed) & South gym ceiling insulated R38. 6/5,QO: South Chapel (Ext. Walls/Ceiling) All areas covered. Inspector Comments: 10/29/2013FailQuinton OwensCommercial Building Final Handrails not done in chapels or mechanical level. Under sink pipe protection needed (ADA). Exit sign above SE Exit doors (cover arrow). Insulation missing in "cold attics" by access doors (4 ea) on upper level. Upper attic- Fix insulation, tighten bolts under steeple, and add ladders for access. Seal around gas line entry to bldg. Metal escutcheon on sprinkler head under east stair. Dispensers not installed. Inspector Comments: 11/01/2013FailQuinton OwensCommercial Building Final all items corrected. Dispensers in restroom not installed yet.Inspector Comments: 12/27/2013PassQuinton OwensCommercial Building Final 11/1,QO: Building items completed, EXCEPT dispensers in restrooms not installed yet (owner installed). 12/27: completed and approved. Inspector Comments: 08/20/2014PassQuinton OwensCommercial Framing/Structure Inspection As per Quinton Owens: Never called for Framing or Drywall inspections. However, did see them and do a few inspections, the which were OK. Due to CO being given, this milestone may be approved. Inspector Comments: 08/20/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection As per Quinton Owens: Never called for Framing or Drywall inspections. However, did see them and do a few inspections, the which were OK. Due to CO being given, this milestone may be approved. Inspector Comments: Page 2 of 5 (Continued) Permit Details Permit Number: 12-00422 Rexburg LDS 4th Stake Center 454 S 12th W New Commercial Building Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am Permit Inspection Summary Electrical Inspection Type 07/17/2013PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power-#3 wire for equipment grounding conductor was changed out for 3/0 as specified on the plans. Inspector Comments: 08/22/2013PassBret StoddardCommercial Electrical Rough-in 5/10/13 - Approved for cover after supports are installed in the east side by rostrum for MC cabling from switches. 5/14/13 - Approved for cover in the east side from the double doors on the north to the south east corner on the south end in the exterior walls only. 5/17/13 - Approved for cover in the exterior walls on the west side only from the north to the south, also for the south portion of the gym(cultural hall). 5/31/13 - Approved for cover-southwest corner of building from entry to the south, south chapel, and bathrooms on the east side in the middle, and overflow area from the south chapel. 6/11/13 - Approved for cover in the west hallway from the south foyer to the north foyer including the rooms on the exterior portion not including the north foyer, also NW bathrooms(2). 6/17/13 - Approved for cover on the west side hallway to the north foyer including the rooms on both sides. 6/21/13 - Approved for cover in the north bathroom (1), west rooms on the north end in corner and also main hallway north foyer area. 6/26/13 - Approved for cover in the northeast corner rooms-surrounded by the hallway and corridor. 7/3/13 - Approved for cover in the east corridor area walls from the north to the south end and the southwest corner offices ceilings. 7/11/13 - Approved for cover in the ceilings of the rooms around perimeter from the west corridor to the east corridor on the north end of building. 7/23/13 - Approved for cover in the ceilings on the east side from the middle corridor to the south corner. 7/29/13 - Approved for cover in rooms #111, 112, 124, and 125 in the trayed ceilings , also the storage building walls and ceilings. 7/30/13 - Approved for cover in the picnic shelter wall on the south side and ceiling throughout. 8/22/13 - Approved for cover-soffits in the relief society rooms on the east side(2). Inspector Comments: 10/29/2013FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Bishop's office 28th ward outlet by white board no power-clerk's office also no power, 12th ward outlet cover missing-clerk's office, rostrum outlets not done in either chapel, call when done with all items for a re-inspect. Inspector Comments: 10/31/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.-items from prior inspection are done.Inspector Comments: Page 3 of 5 (Continued) Permit Details Permit Number: 12-00422 Rexburg LDS 4th Stake Center 454 S 12th W New Commercial Building Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am Permit Inspection Summary Fire Inspection Type 05/28/2013PassDale PickeringFire Sprinkler Hydro OK to cover. #206 for 2 hrsInspector Comments: 07/09/2013PassDale PickeringFire Sprinkler Rough-in 5/13/13 - OK to cover. 5/13/13 - OK to cover chapels 5/15/13 - Flush - 10 minute flush OK 7/9/13 - OK to cover. Inspector Comments: 10/01/2013FailDale PickeringFire Underground Inspection Wont hold pressure.Inspector Comments: 10/01/2013PassDale PickeringFire Underground Inspection 11/07/2013FailBret StoddardFire Alarm Final Inspection Remote annuciator not learned into the system, duct detector relay not installed, system not monitored, 24 hour/5 minute test witnessed from 3:50PM 11/6 to 4:09PM 11/7, all initiating and signalling devices witnessed operation, call for a re-inspect when ready. Inspector Comments: 11/08/2013PassBret StoddardFire Alarm Final Inspection Approved for a final and C.O.-items from previous inspection done, report in file, witnessed all devices functional. Inspector Comments: Mechanical Inspection Type 10/29/2013FailQuinton OwensHVAC Final Inspection Fix furnace exhausts for condensate drainage (East side). Open exhaust vent to audio room. Inspector Comments: 11/01/2013PassQuinton OwensHVAC Final Inspection Plumbing Inspection Type 11/27/2012PassDon AllenPlumbing Sewer 02/24/2013PassDon AllenPlumbing Rough-in 10/25/2013FailDon AllenPlumbing Final Inspection need a 1 inch air-gap on all floor sinks and cup drains west women's bathroom needs a toilet need to finish sinks in sacrament rooms Inspector Comments: 11/24/2013PassDon AllenPlumbing Water 11/30/2013PassDon AllenPlumbing Underground Inspection 12/6/12 - *approved 12/13/12 - *approved 12/14/12 - Good to cover underground Inspector Comments: 12/24/2013PassDon AllenPlumbing Final Inspection All good for the C/OInspector Comments: Page 4 of 5 (Continued) Permit Details Permit Number: 12-00422 Rexburg LDS 4th Stake Center 454 S 12th W New Commercial Building Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am Permit Inspection Summary Page 5 of 5