HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00422 - Rexburg LDS 4th Stake CenterPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am
Permit Details Permit Number: 12-00422
Rexburg LDS 4th Stake Center
454 S 12th W
New Commercial Building
Permit Issued Date: 08/18/2014
Permit Inspection Statistics
26Total Inspections Completed:
19Total Inspections Passed:
Inspection Pass Rate: 73.08%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
01/11/2013PassPLL ADMINCommercial Footing Inspection
As per Jon Berry,
PCW
11/9, JB: REbar and forms look good SWest corner and 1/2 of west footings.
11/13, JB: West 1/2 ok to pour; South 1/2 of East Footing & Rebar looks good
11/19, QO: East side-North half OK.
11/21, QO: North End Footing 3 #4's cont.& #4 vert. at 18" oc staggered 2 sides.
(correction: 24" oc.everywhere - only good where horiz. bar is #5) see
foundation notes
11/27, QO: Int. column footing (4) #4 each way
12/7, QO: Interior ftgs (Northend) 2 w/8 #4's ea way and 2 w/6 #4's ea way.
Partial cont int ftg.
12/11: Int ftgs. cont. from North entry to both side entries. Rebar as per plans.
12/12: Int ftgs. (South side of north hallway) spot ftg & cont. ftg as per plans.
12/14: Partial South Exterior Footings (approved per Don A. description)
12/19: Interior ftg alongside gym East side. 4-#4 bars cont with 6-#4's ea way in
spot ftgs.
12/20: Interior ftg alongside gym West side. 4-#4 bars cont with 6-#4's ea way
in spot ftgs.
1/02: West side of south chpl. 3 #4 bars cont. 8 #4's in spot ftg. OK
1/03: West side of west hall (south chpl) 3 #4 rebar cont. OK
1/04: West side of west hall (north chpl) 3 #4 bar cont./ spot ftg's per plan. OK
1/11: Front of Chapel. Rebar clearanced corrected at inspection. Approved - QO
Inspector Comments:
01/16/2013PassPLL ADMINFoundation Inspection
As per Jon Berry.
PCW
11/19, QO: West wall-South 1/2 OK.
11/26, QO: 12" walls requires #4 vert at 18" oc. Need rebar clearance at (by
room 129) and top clearance between rooms 129&125. 12" WALLS NOT
APPROVED.
11/27, QO: Partial East fnd and West 12" wall OK to pour. Engr's repair done:
dowel vert #4 between existing for 12" oc spacing both sides.
11/28, QO: North end fnd. Approved.
12/4, QO: 6 #3 ties, 12 #6 verticals
1/16/13: Front of chapel. Rebar as per plans.Approved-QO
Inspector Comments:
Page 1 of 5
(Continued)
Permit Details Permit Number: 12-00422
Rexburg LDS 4th Stake Center
454 S 12th W
New Commercial Building
Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am
Permit
Inspection
Summary
06/05/2013PassQuinton OwensCommercial Insulation Inspection
4/17,QO: West side ceiling (except for some at north end) R-38, a couple gaps
and sections pushed into venting area to be fixed.
4/19,QO: East side ceiling. R38 batts installed properly. End rafter space on north
and south ends have blocking that may limit venting.
5/14,QO: North end trusses over mezzanine (R-38 in attic and R-19 in wall.(outer
wall not done)
5/16,QO: East side, North chapel/gym up to overflow. R38 ceilings/R19 walls
-seal wndws.
5/23,QO: West walls R19 (windows not yet sealed) & South gym ceiling insulated
R38.
6/5,QO: South Chapel (Ext. Walls/Ceiling) All areas covered.
Inspector Comments:
10/29/2013FailQuinton OwensCommercial Building Final
Handrails not done in chapels or mechanical level. Under sink pipe protection
needed (ADA). Exit sign above SE Exit doors (cover arrow). Insulation missing in
"cold attics" by access doors (4 ea) on upper level. Upper attic- Fix insulation,
tighten bolts under steeple, and add ladders for access. Seal around gas line
entry to bldg. Metal escutcheon on sprinkler head under east stair. Dispensers
not installed.
Inspector Comments:
11/01/2013FailQuinton OwensCommercial Building Final
all items corrected. Dispensers in restroom not installed yet.Inspector Comments:
12/27/2013PassQuinton OwensCommercial Building Final
11/1,QO: Building items completed, EXCEPT dispensers in restrooms not installed
yet (owner installed).
12/27: completed and approved.
Inspector Comments:
08/20/2014PassQuinton OwensCommercial Framing/Structure Inspection
As per Quinton Owens: Never called for Framing or Drywall inspections. However,
did see them and do a few inspections, the which were OK.
Due to CO being given, this milestone may be approved.
Inspector Comments:
08/20/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection
As per Quinton Owens: Never called for Framing or Drywall inspections. However,
did see them and do a few inspections, the which were OK.
Due to CO being given, this milestone may be approved.
Inspector Comments:
Page 2 of 5
(Continued)
Permit Details Permit Number: 12-00422
Rexburg LDS 4th Stake Center
454 S 12th W
New Commercial Building
Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am
Permit
Inspection
Summary
Electrical Inspection Type
07/17/2013PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent power-#3 wire for equipment grounding
conductor was changed out for 3/0 as specified on the plans.
Inspector Comments:
08/22/2013PassBret StoddardCommercial Electrical Rough-in
5/10/13 - Approved for cover after supports are installed in the east side by
rostrum for MC cabling from switches.
5/14/13 - Approved for cover in the east side from the double doors on the north
to the south east corner on the south end in the exterior walls only.
5/17/13 - Approved for cover in the exterior walls on the west side only from the
north to the south, also for the south portion of the gym(cultural hall).
5/31/13 - Approved for cover-southwest corner of building from entry to the
south, south chapel, and bathrooms on the east side in the middle, and overflow
area from the south chapel.
6/11/13 - Approved for cover in the west hallway from the south foyer to the
north foyer including the rooms on the exterior portion not including the north
foyer, also NW bathrooms(2).
6/17/13 - Approved for cover on the west side hallway to the north foyer
including the rooms on both sides.
6/21/13 - Approved for cover in the north bathroom (1), west rooms on the north
end in corner and also main hallway north foyer area.
6/26/13 - Approved for cover in the northeast corner rooms-surrounded by the
hallway and corridor.
7/3/13 - Approved for cover in the east corridor area walls from the north to the
south end and the southwest corner offices ceilings.
7/11/13 - Approved for cover in the ceilings of the rooms around perimeter from
the west corridor to the east corridor on the north end of building.
7/23/13 - Approved for cover in the ceilings on the east side from the middle
corridor to the south corner.
7/29/13 - Approved for cover in rooms #111, 112, 124, and 125 in the trayed
ceilings , also the storage building walls and ceilings.
7/30/13 - Approved for cover in the picnic shelter wall on the south side and
ceiling throughout.
8/22/13 - Approved for cover-soffits in the relief society rooms on the east
side(2).
Inspector Comments:
10/29/2013FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Bishop's office 28th ward outlet by white board no power-clerk's office also no
power, 12th ward outlet cover missing-clerk's office, rostrum outlets not done in
either chapel, call when done with all items for a re-inspect.
Inspector Comments:
10/31/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.-items from prior inspection are done.Inspector Comments:
Page 3 of 5
(Continued)
Permit Details Permit Number: 12-00422
Rexburg LDS 4th Stake Center
454 S 12th W
New Commercial Building
Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am
Permit
Inspection
Summary
Fire Inspection Type
05/28/2013PassDale PickeringFire Sprinkler Hydro
OK to cover. #206 for 2 hrsInspector Comments:
07/09/2013PassDale PickeringFire Sprinkler Rough-in
5/13/13 - OK to cover.
5/13/13 - OK to cover chapels
5/15/13 - Flush - 10 minute flush OK
7/9/13 - OK to cover.
Inspector Comments:
10/01/2013FailDale PickeringFire Underground Inspection
Wont hold pressure.Inspector Comments:
10/01/2013PassDale PickeringFire Underground Inspection
11/07/2013FailBret StoddardFire Alarm Final Inspection
Remote annuciator not learned into the system, duct detector relay not installed,
system not monitored, 24 hour/5 minute test witnessed from 3:50PM 11/6 to
4:09PM 11/7, all initiating and signalling devices witnessed operation, call for a
re-inspect when ready.
Inspector Comments:
11/08/2013PassBret StoddardFire Alarm Final Inspection
Approved for a final and C.O.-items from previous inspection done, report in file,
witnessed all devices functional.
Inspector Comments:
Mechanical Inspection Type
10/29/2013FailQuinton OwensHVAC Final Inspection
Fix furnace exhausts for condensate drainage (East side). Open exhaust vent to
audio room.
Inspector Comments:
11/01/2013PassQuinton OwensHVAC Final Inspection
Plumbing Inspection Type
11/27/2012PassDon AllenPlumbing Sewer
02/24/2013PassDon AllenPlumbing Rough-in
10/25/2013FailDon AllenPlumbing Final Inspection
need a 1 inch air-gap on all floor sinks and cup drains
west women's bathroom needs a toilet
need to finish sinks in sacrament rooms
Inspector Comments:
11/24/2013PassDon AllenPlumbing Water
11/30/2013PassDon AllenPlumbing Underground Inspection
12/6/12 - *approved
12/13/12 - *approved
12/14/12 - Good to cover underground
Inspector Comments:
12/24/2013PassDon AllenPlumbing Final Inspection
All good for the C/OInspector Comments:
Page 4 of 5
(Continued)
Permit Details Permit Number: 12-00422
Rexburg LDS 4th Stake Center
454 S 12th W
New Commercial Building
Permit Status of (Open) as of Report Date: 02/18/2020 9:09 am
Permit
Inspection
Summary
Page 5 of 5