Permit Status of (Open) as of Report Date: 02/14/2020 11:04 am
Permit Details Permit Number: 12-00409
Mesa Falls Club House
940 S 5th W
New Commercial Building
Permit Issued Date: 02/21/2014
Permit Inspection Statistics
28Total Inspections Completed:
22Total Inspections Passed:
Inspection Pass Rate: 78.57%
Permit Inspection History *Refer to Individual Inspection Report for more Details
08/05/2013PassPLL ADMINFire Underground Inspection
07/30/13: FDC approved to be on street side south west corner of building. Will
be completed on 8/1/13.
07/30/13: Rough in missing two heads in every way, will be completed on
08/2/13.Per Chief Child
Inspector Comments:
Building Inspection Type
04/05/2013PassQuinton OwensFoundation Inspection
10 #4 horz rebar cont
#6 vert rebar at ~15" o.c.
Action required; keep clearances during pour.
Inspector Comments:
4/1 QO - 2 #4 rebar cont, clearances ok
#6 dowels ready to install.
Inspector Comments:
4/26 TD - basement footing pouring w/ south floor
overlaps good
pad rebar good (grid)
Inspector Comments:
05/01/2013PassQuinton OwensFooting Inspection
5/1 QO - rebar as per plans and #6 dowels ready on site.Inspector Comments:
05/03/2013PassTed DyeFoundation Inspection
Mail OK kiosk foundation ok
OK handicap ramp walls on SE corner bldg
OK fireplace east
OK equip room north
Inspector Comments:
07/01/2013PassQuinton OwensSheeting
some missed locations to be nailed (see marked locations)
Action required (reinspect with framing).
Inspector Comments:
07/29/2013PassTed DyeFraming/Structure Inspection
approved.Inspector Comments:
08/05/2013PassTed DyeInsulation Inspection
8/5 TD: insulation in court area ok ok to hang drywall.
8/5,QO:Main building area. Basement(R13),bsmt windows not in, main floor walls
(R19), windows (U-0.32). Perimeters sealed. ADD VENT BAFFLES IN EAST RM
ATTIC.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 12-00409
Mesa Falls Club House
940 S 5th W
New Commercial Building
Permit Status of (Open) as of Report Date: 02/14/2020 11:04 am
Permit
Inspection
Summary
08/08/2013PassQuinton OwensSheetrock/Drywall Inspection
ok to tape drywallInspector Comments:
03/04/2014FailQuinton OwensBuilding Final
Bathroom identification signs to be installed. Fix North exit door from gym (too
tight).
Inspector Comments:
04/10/2014PassTed DyeBuilding Final
All looked good.
Approved for C.O.
Inspector Comments:
Electrical Inspection Type
07/30/2013PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent power-inspected the electrical service
on the rough-in inspection.
Inspector Comments:
07/30/2013PassBret StoddardCommercial Electrical Rough-in
Approved for cover.Inspector Comments:
09/24/2013PassBret StoddardElectrical Underground Inspection
Approved to place shotcrete and concrete for the hot tub, the bonding was
complete with 7 connections to the rebar for the equip potential grid and metal
parts such as the handrail, etc.
Inspector Comments:
Reception desk has wires hanging out, no divider in floor box and cover
missing-office next to reception area and last one to the west, light missing in
game room downstairs, game room furnace disconnect not accessible-behind
furnaces, fire sprinkler pipe in front of fire alarm panel, fire sprinkler pipe not
bonded, emergency light in bathroom in maintenance shop not installed, hot tub
lights and associated equipment must have GFCI protection, no A/C units
installed at all, call for a re-inspect when ready.
Inspector Comments:
02/27/2014FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Reception desk has wires hanging out, no divider in floor box and cover
missing-office next to reception area and last one to the west, light missing in
game room downstairs, game room furnace disconnect not accessible-behind
furnaces, fire sprinkler pipe in front of fire alarm panel, fire sprinkler pipe not
bonded, emergency light in bathroom in maintenance shop not installed, hot tub
lights and associated equipment must have GFCI protection, no A/C units
installed at all, call for a re-inspect when ready.
Inspector Comments:
03/03/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. clubhouse and maintenance shed, no A/C units
installed.
Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 12-00409
Mesa Falls Club House
940 S 5th W
New Commercial Building
Permit Status of (Open) as of Report Date: 02/14/2020 11:04 am
Permit
Inspection
Summary
Fire Inspection Type
10/29/2013PassDale PickeringFire Sprinkler Hydro
205 @ 1305
205 @1515 both pass.
Inspector Comments:
03/13/2014PassBret StoddardFire Alarm Final Inspection
04/24/2014PassDale PickeringFire Sprinkler Final Inspection
04/24/2014PassDale PickeringFire Sprinkler Hydro
04/24/2014PassDale PickeringFire Department Final Inspection
Mechanical Inspection Type
7/26,QO: Dryer vent exceeds code min. length. (within appliance limits?). Tracer
wire will be required for underground line on NE side (cannot penetrate
foundation underground).
Inspector Comments:
07/24/2013FailDon AllenHVAC Rough-in
7/24 -DA: gas pressure & rough in - need to finish, need to put test on gas.Inspector Comments:
07/30/2013FailDon AllenHVAC Rough-in
re inspection - gas pressure & mechanical - need to secure gas mainfield down,
need to strap gas pipe down on props.
Inspector Comments:
02/27/2014FailQuinton OwensHVAC Final Inspection
Regulator model 3/4" 1813C (399,900 btu/h) not vented outside (vent openings
in wall).
Action required: seal gas line penetration into furnaces. Place proper roof cap on
dryer vent. Gas line foundation penetration to stay above grade and be sealed.
Label dryer effective length at dryer vent box.
Inspector Comments:
03/03/2014FailQuinton OwensHVAC Final Inspection
vent regulator in boiler room to outside.Inspector Comments:
11/04/2014PassDon AllenHVAC Final Inspection
All good for the c/oInspector Comments:
Plumbing Inspection Type
04/10/2013PassDon AllenPlumbing Underground Inspection
all good to cover ground work.Inspector Comments:
06/25/2013PassDon AllenPlumbing Rough-in
good to cover rough inInspector Comments:
02/28/2014PassDon AllenPlumbing Final Inspection
all good for c/oInspector Comments: