HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00364 - LDS Rexburg 19th Stake - New BuildingPermit Inspection Summary Permit Status of (Open) as of Report Date: 02/13/2020 2:29 pm Permit Details Permit Number: 12-00364 LDS Rexburg 19th Stake - New Building 2332 W 2000 S New Commercial Building Permit Issued Date: 08/04/2014 Permit Inspection Statistics 27Total Inspections Completed: 22Total Inspections Passed: Inspection Pass Rate: 81.48% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 10/03/2012PassQuinton OwensCommercial Footing Inspection Spot footings approx. 8" oc ea way. 3 bars cont. front and partial side. 2 bars cont. in back and partial side Verticals about 16" oc 11/5 North interior footings OK Inspector Comments: 10/12/2012PassPLL ADMINFoundation Inspection As per Jon Berry. Foundation and rebar look good.Inspector Comments: 03/05/2013PassQuinton OwensCommercial Framing/Structure Inspection Hold downs ok. Sheathing (staples 3 to 4" in field, more on edges) ok. Joist hangers nailed (finish lobbies). Anchor bolts tightened (w/ large washers) ok. NEED SOME BLOCKING ON MECHANICAL LEVEL (any walls over 10 ft) Inspector Comments: 03/27/2013PassQuinton OwensCommercial Insulation Inspection 3/20: East side ceiling, R38 batts. 3/25: Ceiling insulation all but Mech room and some gables: some locations missed or have gaps. 3/27: Remaining insulation over mechanical room and gables (entry & mech) - approved. Inspector Comments: 05/07/2013PassQuinton OwensCommercial Sheetrock/Drywall Inspection 4/18,QO: Chapel area ok to tape. 4/30,QO: (Exterior classrooms and hall) Several locations missed on ceiling and walls. 5/6,QO: Bathrooms and remaining classrooms and previous items are done (Stage area left) 5/7,QO: Last of drywall completed. Inspector Comments: 09/06/2013FailQuinton OwensCommercial Building Final Parking and paving not done. Restroom dispensers not installed. Handrails to mech room are too low. Sprinkler heads covered at north and south end attic. Fix & seal exhaust pipe on far right furnace on mech platform. Covered return air vents terminate under cabinets? One exit sign in primary room not working. Verifying non-direct venting of instant water heater. Seal hole on top side of furnace (NE end) Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 12-00364 LDS Rexburg 19th Stake - New Building 2332 W 2000 S New Commercial Building Permit Status of (Open) as of Report Date: 02/13/2020 2:29 pm Permit Inspection Summary 09/26/2013PassQuinton OwensCommercial Building Final 9/17: Parking lot not done yet. Toilet paper dispensers not located per ANSI 117 (2003) 9/26,QO: Final completed. Inspector Comments: Electrical Inspection Type 10/30/2012PassBret StoddardElectrical Underground Inspection Groundwork/ Uffer - Approved to backfill throughout the building.Inspector Comments: 06/11/2013PassBret StoddardCommercial Electrical Rough-in 3/13/13 - Approved for cover in all exterior walls only. 3/27/13 - approved cover in/outside portions classroom 4/4/13 - Approved for cover-all except gym area done-as per Jane Shaw. 4/9/13 - Approved for cover in the corridors, primary room, relief society room and bathrooms on the north end of building. Also inspected the fire alarm wiring throughout the building as well-Approved for cover-no seperate ticket was written for this. 4/18/13 - Approved for cover-classrooms around the perimeter of building-ceilings only. 4/24/13 - Approved for cover in the primary room and the platform area ceilings. 6/11/13 - Approved for cover under the rostrum conduits and north side storage shed, inspected the electrical service on this inspection also and no seperate ticket was written. Inspector Comments: 06/11/2013PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power-inspected the electrical service on the rough-in inspection for the rostrum. Inspector Comments: 08/15/2013FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Storage shed not inspected-concrete being poured, energy recovery units have breakers to large for nameplate ratings, drinking fountains not GFCI protected and must be, outside receptacles not weather rated, call for a re-inspect when ready. Inspector Comments: 08/27/2013FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Lift not wired for platform, call for a re-inspect when ready.Inspector Comments: 09/05/2013PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.-lift inspected by DBS.Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 12-00364 LDS Rexburg 19th Stake - New Building 2332 W 2000 S New Commercial Building Permit Status of (Open) as of Report Date: 02/13/2020 2:29 pm Permit Inspection Summary Fire Inspection Type 04/09/2013PassBret StoddardFire Alarm Rough-in See rough-in inspection for electrical inspection-no seperate ticket was written.Inspector Comments: 04/19/2013PassDale PickeringFire Sprinkler Hydro 200 PSI from 11:10-1:20. OK to cover.Inspector Comments: 08/27/2013FailBret StoddardFire Alarm Final Inspection Not monitored with phone line, index not in panel, need report from Peak Alarm before final completion, blank cover missing on east side, wire needs strapped in west side of mezanine deck area, witnessed 24 hour/5 minute test from 10:31AM 8/26 to 10:31AM 8/27, AC power restored at 10:44AM 8/27, flow switch operated in 41 seconds for water gong, witnessed operation of all devices on system, call for a re-inspect when these items are done. Inspector Comments: 08/30/2013PassBret StoddardFire Alarm Final Inspection Approved for a final and C.O. for fire alarm only, verified dispatch was called (Wes), items from previous inspection are done. Inspector Comments: 10/21/2013PassDale PickeringFire Underground Inspection 10/21/13 - Fire sprinker as well.Inspector Comments: 10/21/2013PassDale PickeringFire Sprinkler Final Inspection 10/21/2013PassDale PickeringFire Department Final Inspection Mechanical Inspection Type 08/28/2013FailQuinton OwensHVAC Final Inspection Seal holes on Dir. vent Furnaces. Instant Hot water heater installed as non-direct vent - Need to verify special requirements for approval (Model NRC1111-DV). Inspector Comments: 9/17: Grid cover missing as part of approved intake for water heater.Inspector Comments: 08/20/2014PassQuinton OwensHVAC Final Inspection Due to C/O being issued, we can now sign off on this milestone. *approved* Inspector Comments: Plumbing Inspection Type 10/31/2012PassDon AllenPlumbing Underground Inspection All good to cover groundwork.Inspector Comments: 09/03/2013PassDon AllenPlumbing Sewer 09/03/2013PassDon AllenPlumbing Water 09/03/2013PassDon AllenPlumbing Rough-in 09/03/2013PassDon AllenPlumbing Final Inspection All good for C/OInspector Comments: Page 3 of 3