HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00310 - 365 W 1st S - TruNorth Development 4 - PlexPermit Inspection Summary Permit Status of (Open) as of Report Date: 02/11/2020 3:13 pm Permit Details Permit Number: 12-00310 365 W 1st S - TruNorth Development 4 - Plex 365 W 1st S New Multi-Family Residence Permit Issued Date: 06/26/2014 Permit Inspection Statistics 26Total Inspections Completed: 22Total Inspections Passed: Inspection Pass Rate: 84.62% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 07/24/2012PassQuinton OwensFooting Inspection 3 bars in footingInspector Comments: 07/30/2012PassQuinton OwensFoundation Inspection Vert. 24" o.c. with 2 cont. horiz. Ufer installed. Inspector Comments: 09/12/2012PassQuinton OwensSheeting Sheathing approved 9-12, Quinton.(No hold downs required per plan)Inspector Comments: 10/09/2012FailPLL ADMINFraming/Structure Inspection 0/09 Tubs need drywall at party walls Washer boxes not rated for party walls data boxes not rated for party walls Bath fan connector needs fire caulking bottom middle unit Fire caulking party walls and ceilings Beam support to footing patch holes in party walls in crawl space. As per Jon Berry. Inspector Comments: 10/11/2012PassPLL ADMINFraming/Structure Inspection Framing re-inspect completed. As per Jon Berry. Inspector Comments: 10/22/12 JB: Drywall bottom 3 units looks good. Insulation upper unit ok to cover. Inspector Comments: 11/02/2012PassQuinton OwensSheetrock/Drywall Inspection 11/2/12 QO: Drywall ok to tape. 5/8" type X between units. Inspector Comments: 11/19/2012PassQuinton OwensSidewalk Inspection 6" or more gravel base. Ok to pour. Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 12-00310 365 W 1st S - TruNorth Development 4 - Plex 365 W 1st S New Multi-Family Residence Permit Status of (Open) as of Report Date: 02/11/2020 3:13 pm Permit Inspection Summary 12/07/2012FailQuinton OwensBuilding Final Light missing over stairs (1&3) CO det. req'd in upstairs hallway. (1&3) Unit separation in crawl space (rating?) Plastic pipes firecaulked (no firecaulk ring). Inspector Comments: 12/10/2012PassQuinton OwensBuilding Final Bldg Final Ok.Inspector Comments: 10/22/2014PassPLL ADMINInsulation Inspection 10/15 OK counld not get to upstairs unit. 10/22 up stairs unit looked good As per Jon Berry. Inspector Comments: Electrical Inspection Type 11/06/2012PassBret StoddardResidential Electrical Service Inspection Approved to be energized for permanent power.Inspector Comments: 12/07/2012FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Intersystem bonding termination required, breaker locks required for water heaters in the end two units (N&S), dish/disp. receptacle under sink in the unit #2 not installed, hallway stair light missing in the north unit, condensate pumps in the crawl spaces in three units does not have a receptacle to plug into, bar light is missing in upstairs unit, bedroom upstairs doesn't have power, bedroom and living room lights are not installed in upstairs unit, call for a re-inspect when ready. Inspector Comments: 12/10/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Approved for a final and C.O.-items were corrected.Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 12-00310 365 W 1st S - TruNorth Development 4 - Plex 365 W 1st S New Multi-Family Residence Permit Status of (Open) as of Report Date: 02/11/2020 3:13 pm Permit Inspection Summary Fire Inspection Type 09/26/2012PassBret StoddardFire Sprinkler Rough-in Jon did the inspection for the rough-in of sprinkler system, after talking with Val and Steve about the changes made to the drawings for the sprinkler system layout, the contractor can make changes to the system because they designed and installed the system as long as they submit a red-lined set of drawings for the final along with their final report. Approved for cover as per Jon's previous inspection. Inspector Comments: 10/01/2012PassPLL ADMINFire Underground Inspection Underground tested good at 150# Flushed main from the municiple water supply to building tie-in for sufficient time (approx. 10 minutes), Approved to move forward with project. Inspector Comments: 10/08/2012PassBret StoddardFire Alarm Rough-in 12/10/2012PassDale PickeringFire Sprinkler Rough-in 9/27 Underground tested good at 150# Thrust block installed at main. Checked rough for cover. Installer made changes in kit/dining 2 heads to 1 head for 18' Brett is to make decision. Inspector Comments: 12/10/2012PassBret StoddardFire Alarm Final Inspection Approved for a final and C.O. after the monitoring test report is turned in from Omni-12/9/12-AC power loss 9:57AM, 12/10/12 alarm test 5 minutes 10:00AM, 12/10/12 AC power regain 10:22AM, checklist is complete from Omni and in file. Inspector Comments: 12/10/2012PassDale PickeringFire Sprinkler Final Inspection Mechanical Inspection Type 10/09/2012PassDon AllenHVAC Rough-in Inspected the fire alarm wiring with the electrical rough-in-no seperate ticket was written for fire alarm rough-in. Inspector Comments: 12/07/2012FailQuinton OwensHVAC Final Inspection Outlet needed for condensate pump. Filter access covers needed to close opening to crawl space. Inspector Comments: 12/10/2012PassQuinton OwensHVAC Final Inspection Mech final OkInspector Comments: Plumbing Inspection Type 10/03/2012PassDon AllenPlumbing Rough-in 12/26/2012PassDon AllenPlumbing Sewer 12/26/2012PassDon AllenPlumbing Water 12/26/2012PassDon AllenPlumbing Final Inspection Page 3 of 3