HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00310 - 365 W 1st S - TruNorth Development 4 - PlexPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 02/11/2020 3:13 pm
Permit Details Permit Number: 12-00310
365 W 1st S - TruNorth Development 4 - Plex
365 W 1st S
New Multi-Family Residence
Permit Issued Date: 06/26/2014
Permit Inspection Statistics
26Total Inspections Completed:
22Total Inspections Passed:
Inspection Pass Rate: 84.62%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
07/24/2012PassQuinton OwensFooting Inspection
3 bars in footingInspector Comments:
07/30/2012PassQuinton OwensFoundation Inspection
Vert. 24" o.c. with 2 cont. horiz.
Ufer installed.
Inspector Comments:
09/12/2012PassQuinton OwensSheeting
Sheathing approved 9-12, Quinton.(No hold downs required per plan)Inspector Comments:
10/09/2012FailPLL ADMINFraming/Structure Inspection
0/09 Tubs need drywall at party walls
Washer boxes not rated for party walls
data boxes not rated for party walls
Bath fan connector needs fire caulking bottom middle unit
Fire caulking party walls and ceilings
Beam support to footing
patch holes in party walls in crawl space.
As per Jon Berry.
Inspector Comments:
10/11/2012PassPLL ADMINFraming/Structure Inspection
Framing re-inspect completed.
As per Jon Berry.
Inspector Comments:
10/22/12 JB: Drywall bottom 3 units looks good.
Insulation upper unit ok to cover.
Inspector Comments:
11/02/2012PassQuinton OwensSheetrock/Drywall Inspection
11/2/12 QO: Drywall ok to tape.
5/8" type X between units.
Inspector Comments:
11/19/2012PassQuinton OwensSidewalk Inspection
6" or more gravel base.
Ok to pour.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 12-00310
365 W 1st S - TruNorth Development 4 - Plex
365 W 1st S
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/11/2020 3:13 pm
Permit
Inspection
Summary
12/07/2012FailQuinton OwensBuilding Final
Light missing over stairs (1&3)
CO det. req'd in upstairs hallway. (1&3)
Unit separation in crawl space (rating?) Plastic pipes firecaulked (no firecaulk
ring).
Inspector Comments:
12/10/2012PassQuinton OwensBuilding Final
Bldg Final Ok.Inspector Comments:
10/22/2014PassPLL ADMINInsulation Inspection
10/15 OK counld not get to upstairs unit.
10/22 up stairs unit looked good
As per Jon Berry.
Inspector Comments:
Electrical Inspection Type
11/06/2012PassBret StoddardResidential Electrical Service Inspection
Approved to be energized for permanent power.Inspector Comments:
12/07/2012FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Intersystem bonding termination required, breaker locks required for water
heaters in the end two units (N&S), dish/disp. receptacle under sink in the unit
#2 not installed, hallway stair light missing in the north unit, condensate pumps
in the crawl spaces in three units does not have a receptacle to plug into, bar
light is missing in upstairs unit, bedroom upstairs doesn't have power, bedroom
and living room lights are not installed in upstairs unit, call for a re-inspect when
ready.
Inspector Comments:
12/10/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final and C.O.-items were corrected.Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 12-00310
365 W 1st S - TruNorth Development 4 - Plex
365 W 1st S
New Multi-Family Residence
Permit Status of (Open) as of Report Date: 02/11/2020 3:13 pm
Permit
Inspection
Summary
Fire Inspection Type
09/26/2012PassBret StoddardFire Sprinkler Rough-in
Jon did the inspection for the rough-in of sprinkler system, after talking with Val
and Steve about the changes made to the drawings for the sprinkler system
layout, the contractor can make changes to the system because they designed
and installed the system as long as they submit a red-lined set of drawings for
the final along with their final report. Approved for cover as per Jon's previous
inspection.
Inspector Comments:
10/01/2012PassPLL ADMINFire Underground Inspection
Underground tested good at 150#
Flushed main from the municiple water supply to building tie-in for sufficient time
(approx. 10 minutes), Approved to move forward with project.
Inspector Comments:
10/08/2012PassBret StoddardFire Alarm Rough-in
12/10/2012PassDale PickeringFire Sprinkler Rough-in
9/27 Underground tested good at 150# Thrust block installed at main.
Checked rough for cover. Installer made changes in kit/dining 2 heads to 1 head
for 18' Brett is to make decision.
Inspector Comments:
12/10/2012PassBret StoddardFire Alarm Final Inspection
Approved for a final and C.O. after the monitoring test report is turned in from
Omni-12/9/12-AC power loss 9:57AM, 12/10/12 alarm test 5 minutes 10:00AM,
12/10/12 AC power regain 10:22AM, checklist is complete from Omni and in file.
Inspector Comments:
12/10/2012PassDale PickeringFire Sprinkler Final Inspection
Mechanical Inspection Type
10/09/2012PassDon AllenHVAC Rough-in
Inspected the fire alarm wiring with the electrical rough-in-no seperate ticket was
written for fire alarm rough-in.
Inspector Comments:
12/07/2012FailQuinton OwensHVAC Final Inspection
Outlet needed for condensate pump.
Filter access covers needed to close opening to crawl space.
Inspector Comments:
12/10/2012PassQuinton OwensHVAC Final Inspection
Mech final OkInspector Comments:
Plumbing Inspection Type
10/03/2012PassDon AllenPlumbing Rough-in
12/26/2012PassDon AllenPlumbing Sewer
12/26/2012PassDon AllenPlumbing Water
12/26/2012PassDon AllenPlumbing Final Inspection
Page 3 of 3