Loading...
HomeMy WebLinkAboutALL DOCS - 12-00307 - 626 Tanglewood - SFRCITY OF Certificate of Occupancy Gity of Rexburg Department of Gommu nity Development 35 N. lst E. / Rexburg, lD. 83440 Building Permit No: Applicable Edition of Code: Site Address: Use and Occupancy: Type of Gonstruction: Design Occupant Load: Sprinkler System Required: Plumbing Electrical 1200307 International Building Code 2009 626 Tanglewood Dr Single Family Residential Type V, non-rated N/A No Name and Address of Owner: Bc Stonebridge Llc 500 N Marketplace Ste '120 Dr Centerville, UT 84014 Contractor: Higley Development, Llc Special Conditions: Finished basement of 703 sq. ft.. Unfinished basement of 763 sq. ft. Occupancy:Residential - 2 units or less, permanent in nature This Certificafe, issued pursuant to the requiremenfs of Section 109 of the lnternationat Building Code, certifies that, at the time of issuance, this building or that portion of the building that was inspected on the date listed was found to be in compliance with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. Date C.O. lssued: G.O lssued by: There shall be no further change in the existing occupancy classification of the building nor shall any structural changes,modifications or additions be made to the building or any portion thereof until the Building Official has reviewed andapproved said future changes. Fire fnspectorz A//A P&Z Administrator Gertificate of Occupancy CITY OF City of Rexburg Department of Gommunity Development 35 N. 1st E. / Rexburg, lD. 83440 Building Permit No: Applicable Edition of Code: Site Address: Use and OccuPancY: Type of Gonstruction: Design OccuPant Load: Sprinkler SYstem Required: Contractor: Special Gonditions: 12 0A307 lnternational Building Code 2009 626 Tanglewood Dr Single Family Residential Type V, non-rated N/A No TEMPORARY Name and Address of Owner: Bc Stonebridge Llc 500 N MarketPlace Ste 120 Dr Centerville, UT 84014 OccupancY: Higley DeveloPment, Llc Finished basement of 703 sq. ft.. Unfinished basement of 763 sq' ft' Temporary Certificate of occupancy until sidewalks are installed. Certificate expires 6101t13. Residential- 2 units or less, permanent in nature This Certificafe, rssued pursuant to the requiremenfs of Section 109 of the lnternational Building Code, certifies that, at in" ti^, of issuance, this building or that portion of the building that was inipectea on the date tisted was found to be in comptiince with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. Date C;O. lssued: 211112013 C.O lssued bY: Building Official There shall be no further change in the existing occupancy classification of the building nor shall any structural changes' modifications or additions be riade to tne ouitoing or'any portion thereof until the Building official has reviewed and approved said future changes. Plumbing InsPector:Fire fnspectort N/A Electricall P&Z Administrator N/4 f; ,(^t:O,;:cl O,lrs i. f;a': !rno'l o2@O btrv:loz6t :,1;i 'tN.t ,..tt,H '' Or{aoFF o !i F.:t!g: 8:zo. 1\,s T $ F- -zo *oo fi4 ; i* rirEggl Ei,*ae63s .:::": ,,:;,, :; t"atri4 { ::, f.{ I rn;.::3': !r: 19: .9, fLl.o'{,D,r jg': tt€'{ :t9 = G lto -.1 .n oe 5@ o rlo os o5 a .ll oo*:5 P 6" e 3oo:3tl5 o:.! tg GI'oo o l$ '= 6:o 05 o 'o aoo o{oa 3oot ('!r po io o oo rOi :l gL * o6 noE{o:r! (il v !:, l'. *g:' s' U,.0.?a.$ oo oa i. (h o{tDl ato ato,. f}o.t.:t. 01o I (: at .D c l'l'v llExlltll{G aiv I t !1tat1 t i1't ;11:ll;j;' {..'irl|r',;lrlv RESIDENTIAL BUILDING 35 N 1" E, REXBURG,ID 83440 208-372-2326 PERMIT APPLICATION APPLICANT INFORMATION: ADDRESS CITY: STATE; ZTP- EMAIL PHONE #: Home ( ) \7ork / \ -cell( )\,/ t 'ARCEL NUMBER: . . ( We will provide this fot you) tt i z.O suBDrvrsloN, .Sfrer-A- brl4{- uNrr+ </ el-ocK# | Lor#-) / e-aar.*it* is ba.J on-th-t informatioi - must be accurate) n --^il:-^ r'r-ito' Patcel Acres:Dwelling Units: PROPERTY ADDRESS: PHONE #: Home ( )-- Work, (r .)%'"' t ^ffi OWNER MAILING ADDRESS: lTlO L\O\\crTY'. {,.nrnon sTATE,JD zp'Ertlo\ (JWI\.Drt lvlf\rlJu\v ",^*"tk: Oq.1i"'^th.^r- *t t^" ^l /n tr Afa MAILING ADD PHONE #: Home ( ) Work r l58A{to5 c.u t ) IDAHO REGISTRATION # & EXP. .t* tl*,** tt*E'hr zIP 33ltt\ ----@g-2V1,6 DATE-lolrllc- EMA A''LICANT,' 'IGNAT'RE, .ERTIFICATI.N AND AUTI{.RIZATIoN: Under penalty of perlrry, I-hereby certifi' that I have read this application and state that the information herein is .o.."., n I t .*"- that any -r.r-^,iJ" Ji'.f ,riuy'rr".*-n.t be given bv me itr hearings before the Irlannins and Zoning commission or the city council for t" iiay "i n",.u.,rg ,t ott b" truthful and corr".t. I afFee to .o-prv *irh all city regulations and State laris rerating to th" .rbi".t -otter of this appliglugn;;;;#;;".i"."d representadves of the city to entef upon th" "bote-t"ttioned property for inspections purposes. Norg, n* uJarrg rrnaor -o;, revoke a perrnit on "pprJ;;;"; rnde, the'provisio"r of th" 2003 Intemational code in cascs of any false statement J.ii.r#..r*r^*,?, "r r*i"i"""lfri#;; "" ai" pr-. "" *rrich the pernnit or approval was based' Permit void if not ---rA..i.L:- 1p.n..revsr Perlnit voidif;rd?R3tqps for 180 days' t nA r n trm.ffffi:;:il.TJ'.T6 r. tr,i, u rot.dit? @ JES eI^i***::nl S"":]flj::ription orpropertv) il:#;:F#ii. Addi'lion' Etc) -b, )t / tA DATE ile of Owner tilt*r*o - ''ILDING 'ERMIT MYgr B: PgsrE:-oi^-c:)tJ::"T:H::y; u,."X..-.*?-*'*'"i?oi)I#l;'1ti'."d.*.'-':r':,"3:5::::"i:1y::ffi @t :s are non-ferulr(laDrc auu '"'* -- -- - - . ,a"-oot "oo"titute plan approval City of Rexburg's Acceptance {6-: o]t':ffH::5"*its are void if vour check d ACT PHONE # **Bu'ding pe*?""j.Y:T$".*.j:':ffiffi;#fi';;;td;;;.;i, .'. "oia fv""' ii"k does not creats t suBcoNTRAcToR LIST O Excavation & Earthwork: N[asonry: Roofing: Insulationi Drywall: Painting: Floor Coveringsi Plumbing: Heating: Elec 4L*Qlumbtr Special Construction (Manufacturer or SuPPlier) Roof Trusses: Floor/Ceiling Joists: Siding/Exterior Trim: Other: ? Building SofetY DePorlment CilY ot Rexburg , 35N l',E Rexburg, lD83140 wwwiexburg.org NANTE MOPERTY ADDRESS SUBDIVISI9|i ltor P$nsE 7 BLOCK--L- frern odcliag Yout Buildiag/I{ omc (need Estimate) SURFACE, SQUARE FOOTAGE: ?hone:208.372.2326 Fox:208.359.3022 Permit# (Shall include the exteriot wall measuremelts of the building) ''lWater Metet Size: qfe. t4 bh' t \1 unfinished Basement ^t" 19 U UFirst Floor trr. l2l) l* Second floor/loft Ate Finished basement arca Tlhidfloor/loftarea Garage u"^ ' ---- ''-- 51f- Catpott/Deck (30" above grade)A I Shed or Vatet Metet QuantitY: l Requited!!! Spdnklers Tub/Showers Toilet/Utinal Vater Heater Watet SoftenerHot Tub/Spa , Sinks pavatories, kitchens, bar, mop) I n',tu*bing Estima'te $_- (69MMERC1AL/MULTI-FAMILY ONLY) W License Numbcr& ExPiration Date ,PLUMBING ptumbins Contractor's J"*"' \4iClzrno\ Qf ertfq Btsiness Name: The P\ t r Vnln'r' Cnc' aaa,e.. ?.0. oY. 2l4g ' city f,/Aho t-alls s urcr{L-z;pw ; dontactphone: t2O0 ?51- llt{O gusiness Phone: (?{6) 691- llL+O nmairtlrep\urrnbzrllc@)alnoo, r^* 28-52*-fiV : Dishwasher-_- --___ Floor Dtain GarbaPe Disposal_|-- i Clothes Washing Machine Building SofetY DePorlment CltY ol Rexburg i 35N ldE Rexbvq, lO 8344o Phone:208.372-2326 www.rexburg.o(g Faxi2(n359.3022 NAMH PROPER]Y ADD SUBDIVISION )FC Pru\SE, <I Requircdl!! j Mechanical Conttactor' lixhaust or Vent Dtets (nnter fuanr) Dryer Vents Range Hood Vena Cook Stove Vents Bath Fan Vents othct similar vcnts & ducts: /,'?f '1or{ Permit# MECH'4I{IC'4L s Name Sl-eqt- f- ,rJC* Business Name Address F. Q- PoF L'l 1l cit! CetI Phone (1,'o|1)PhoneQtfi Fax(flt)$ Mechanical Eetimete $--__- (Commetciat/Multi Family Only) FtrTUR"ES&'4PPLIANCE|CoaNT$iaglckmilyDwdliagofrIy) Furnace Furnace/Air Conditioner Cornbo Heat PumP Air Conditionet Evapotative Cooler Unit Hcatcr Space Heater Decorative gas-fued aPPliance Incinerator SYstem Boiler Pool Heatet Fuel Gas Pipe Outlets including stubbed in or fun:re outlets Inlet Pressure (Meter SuPPIY) PSI Heat (Circle all that apply) Gas Oil coal Fireplace Elecaic Hydronic i'''ti;:k#!'f 35N I'tF Rexburg. lD 83440 www.rexburg.org Cily ol Rexburg Phone:208.3722326 Fax;208.359.3022 O\T(NER'S NAI\fE PROPERTY Pcrmit#lZ oo3o? fu-"ywununf poWcfSUBDMSIOAI a PHASE Requ*edll! ELECTRIC'4L Electrical conrractor's Name !^ )'':'!' i'i^ 0 rtl u ousiness Name . :_ it l:Xtt{"il{{ ; $ n tr n ft {'+Over 4,500 sq ft- $216 plus $.04/sq fn - sq ft toal a,aar.s, i l:J ,7 Li , i.] 5 .5 c ity-E!-f-*Jii st^t -iD --z.ip.fi'J7t Ceil phone ()rF) ,48i Ll ( /L; h:siness Phone (Jlb )(6 tt-q (,/ ; Fax ( 1 (*"twt , i i^)n>'^, ua ft)1,,M A,l , tfttn Elecuical Estimate (cost ofwiring & labot) (COMMERCIAI/MULTI-FAMILY ONLY) (Iachdx the a$ oJnateiab installcd ngmdhs of tbt paiy Mpptiagit} TYPE S OF INST.'4LLATION (Ncw X.ecideatial inchtdcs owtythbg conbiacd vlthia the msidcotid snucntc lad tmchcd gttegc at the saac tiac) RESIDENTIAL ONLY tr x1,501 to 2,500 sq ft - $120 tr x3,501 to 4,500 sq ft - $216 Existing Residential (# of Branch Ckcuits) - $40 plus $10 per citcuit;# of circuits n Tempomry Consuuction Sen ice, 200 amp or less, one location (for a pedod not to exceed 1 year) - $40 n spa, Hot Tub, Srvimming Pool - $40 plus $40 grounding grid where applicable tr Electric CenUal Systems Heating and/ or Cooling (aher not part oJ a tev rc.ridential conrtruiliu Ftmit anl ao additioaal tvttirlg - $40 B Moduiar,I\lanufactured or lrlobile Home - $50 plus $10 per circuit tr other Installations: wiring not specifi.cally covered by an1' of the above: Cost of lViing& I-altor S.(Iadvdn tbe nst oJ materialr in$alhd rcganlht otthe Paq wppling it). tl Pumps (Domestic'W'ater, Irrigation, Sewage): horse Power o Requested Inspecrions (of edsting widng) - $aOlht (1 ht minimum) plus $40/ht thereafter *Includes a maximum of 3 inspectirns, .{rklitirnal inspcctions charged at re<;uested inspectioo rate of S4O per hour. *+ Iaclurles a rnaximum of 4 inspections, A<kliu<mal inspections charged at requested inspection rate of S40 pet hour. *Up to 1,500 sq ft - $12 *2,501 to 3,500 sq ft - $168 :,/ I /; I t/\^:,oti Ll,/tt',';tiiltr[.1.t':j ll 7-i ,. Silpanue of Licensed Conua{<rr License number t , /.t,t / t,t *;' '* I i t't\-' Date rr! Structural Calculations For: Plan #: Fall Creek Homes lnc. Hollow Road . Utah 84050(s0l) 876-3s01 12 00307 626Tanglewood - SFR Office CoPY 26Jwe20l2 1a! n"rigrhhtsla IBC 2ooe: RoofLoad; Live Load (PSF) Dead Load (PSF) Floor Load; Live Load (PSF) Dead Load (PSF) Seismic Zone:E 40 15 40 10 Wind Speed: 90 mph (110 mph 3 second gust) 100 mPh (120 mPh 3 second gust Exposure C or ) Exposure B Material Properties & Assumptions c""r*t" ps(f.';, z5-00 6o.r.rd.), 2500 (slabs), 4000 (susp. slabs) Concrete Reinforcement: ASTM ,4.615 Grade 60 Site conditions: Dry & stable granular based, 2000 PSF Bearing capacity, Glalular Based Backfill (KH:35 pcf,l(P:225), Slope not to exceed 20%, Minimum setback from slopes of 25', Dimensional Lumber: Hem or Doug Fir #2 & BTR Steel: ASTM A36 Use Simpson sffaps and tie downs, and meet nailing, reinforcement and other structural requirements as noted on the drawing and within th-" pug"t of this document' These structural carculations are based on conditions and assumptionr tirt"a above. If the conditions listed herein are not met or are different it shall be brought to ttre attention.of the engineer. Roof Truss and beam system to be engineered by ttre supffie.. This engineering assumes that the building site is dry and stable, a high"water tabll or adverse soils such as plastic clays' fills etc' could cause future flooding, settiement, site instabihry, or other advelge conditions' Verification of and liability for the ,oif t"urirrg pressure, site stutitity, and all other site conditions' including site engineering u.."qoir"a, iJaft. responsibility of others. These calculations and engineering are for the new building '*"*'" only and do not provide any-engineering ana|vsi::|o' liability/wananty for the non-struttural portions of the building, or the site itself' William York is the sffuctural engineer only and does not assume the rore of;'Registered Design Professional" or,,Engineer of Record,'on this project. The purpose of these calculations and engineering is to help reduce structural damage und loss of life due to seismic activity and/or high wind # conditions. The contractor shall verify all conditions, dimensions and structural details of the drawing. Multiple use of these calculations is not permitted. All exterior walls shall be sheathed withT116" APA rated structural wood panel. Block all horizontal edges 7 Yz" nominal or wider. Sheathing shall extend continuous from floor to top plate and be nailed at least 4" O.C. along sill plate. Nails shall be placed not less than %" from edge of panel and driven flush but shall not fracture the surface of the sheathing. Extend sheathing over gable end to wall joints & over rim joist between floors and nail to rim and wall plates 6" O.C. The following general requirements shall be followed during construction: l. Contractor to verify all dimensions, spans, & conditions and notify engineer of any errors, omissions, or discrepancies prior to construction. 2. Use Simpson A35 ties each cantilevered joist to sill or top plate. 3. Use Simpson Hl or equiv. ties each end of each truss. 4. Use 2: ll4bars continuous for all footings 2: # 4 bars each side of openings &2# 4 bars top & bottom extend 36" beyond opening 5. Use /2" x 10" J bolts 32' O.C. all foundation walls 6. If discrepancies are found, the more stringent specification shall be followed. 7. All multiple beams and headers to be nailed using l6d two rows 12' O.C. 8. Contractor shall assure that all materials are used per manufactures recommendations. 9. Geotech engineer or Building Department shall verifu overall global stability of the building site. 10. Connect beams & headers over 6 ft., to trimmers with appropriate connectors/hangers. I 1. Contractor shall assure that footings are properly drained and that soil is dry and that footings rest on undisturbed native soil 30" below finished grade and that building horizontal clearance from footings to adjacent slopes be a minimum of 25 feet and that the intent of IRC section R403. | .7 .2 is met. If set back requirements of R403. 1 .7 .2 can not be met then contact engineer for further design requirements. 12. The contractor shall conform with all building codes and practices as per the 2006 IRC. 13. Use balloon framing method when connecting floors in split level designs. 14. Nail all shear walls to floor joist using 2: 16d 16" O.C. Add additional floor joist as reqd. 15. Provide joist and rafter hangers as per manufacturers specifications. 1 6. Foundation steps shall not exceed 4 feet or t/z the horizontal distance between steps. Horz. rebar shall be 12" O.C. through step downs and extend 48" either side of step l7.lf gnage return walls are less than 32" wide then extend headers across return walls with 2 king studs on either end extending from the top of the header to the bottom plate or install (2) MST 36 straps each end of header extend across wing walls. 18. Use a minimum of 2-9 Yr" LYLs for all headers carrying girder loads. 19. Allow foundation 14 days to cure prior to backfill 20. Use I 1/8" wide timberstrand or equiv. for all rim joist 21. Provide solid blocking through strucfure down to footing for all load paths. 22. Bullder shall follow all recommendations found in all applicable Geotechnical reports. 23. Stacking of two sill plates is permitted with 5/8" J-bolts through both plates. Stacking more than two plates is not permitted without special engineering Footing Calculations Goncrete Specs Density (pcf) Strength (psi) Clear Cover Thickness (in) Foundation Overall Height (ft) Height (in) Wall Thickness (ft) Thickness (in) Weisht (kips/|ft) Footing Specs widrh (ft) Width (in) Height (ft) Height (in) Weight (kips/|ft) Area per lft Soil Specs Density (pcf) Soil Pressure (psf) Weight (kips/|ft) Building Loads Roof span Roof (kips/|ft) Wall Height (ft) Wall Load (kips/|ft) Floor span Floor Loads (kips/|ft) Total(kips.lft) Calculations TotalWeight on Soil (kips) SoilLoad (ksf) Required Footing Width (in) Required Footing Depth (in) Plan: Gascade Date: 26 June2O12 Location: 626 Tanglewood, Rexburg back front left 150 150 3000 3000 33 right interior 150 150 150 3000 3000 3000 333 125 1 500 0.41 7.83 94 0.67 8 0.78 1.50 18 0.67 I 0.15 1.50 31 0.85 10 0.20 14 0.35 1.40 2.34 1.56 1E 8 7.83 94 0.67 8 0.78 1.50 18 0.67 8 0.15 1.50 125 1500 0.41 31 0.85 10 0.20 15 0.38 1.43 2.36 1.57 1E 8 7.83 94 0.67 8 0.78 1.50 18 0.67 8 0.15 1.50 125 1 500 0.41 10 0.28 10 0.20 2 0.05 0.53 1.46 0.97 16 8 7.83 0.08 94 1 0.67 0.67 88 0.78 0.01 1.50 1.33 18 16 0.67 0.67 88 0.15 0.13 1.50 1.33 125 125 1500 1500 0.41 0.00 100 0.28 0.00 10 10 0.20 0.15 230 0.05 0.75 0.53 0.90 1.46 1.O4 0.97 0.78 lU ltt 88 Plan: Cascade Date: 11 May2011 Location: 670 Jex Sawn Lumber Load Parameters Floor Live Load(psf) Floor Total Load(psf) Floor'l Span(fi) Total Floor Load(plf) Wall Height (ft) WallWeight (psf) WallLoad(plf) Roof LL (psf) Total Roof Load(psf) Roof Span(ft) Total Roof Load(plf) Beam Weight (plf) Live Load (plf) Total Load (plf) Reactions & Moment Duration lncrease Beam Span(ft) Reaction 1 (lb) Reaction 2 (lb) Max Moment FtLb Max Shear Lb Determine Beam Size Depth Estimate (in) Width Estimate (in) CF= Area = Momemt of Inertia | = Maximum Bend Stress = Allowable bend Stress Factor Of Safety = Allowable Sheer Stress Max Shear Cap (lbs) = Factor Of Safety = Bearing Required = E (psi) Deflection LL (in) Lload Def. Limit U Allowable Deflection (in) LL Deflection F/S Deflection TL (in) TLoad Def. Limit U Allowable Deflection (in) TL Deflection F/S Selection RB-2 FB-1 40 50 0 0 0 20 0 40 55 36 990 5.6 720 996 11 4 4.5 1991 1697 1991 1697 1991 1909 1991 1697 9.25 7.25 33 1.10 1.20 27.75 21.75 198 95 558 872 935 1020 1.67 1.17 165 180 3053 26',10 1.53 1.54 1.64 1.40 1300000 1300000 0.02 0.04 360 360 0.13 0.15 8.27 3.36 0.02 0.06 240 240 0.2 0.225 8.97 4.00 2:2x10 2:2x8 40 50 30 750 0 20 0 40 55 0 0 4.4 600 754 FB-2 40 50 19 475 0 20 0 40 55 0 0 5.6 380 481 1 7 1682 1682 2943 1682 9.25 3 1.10 27.75 198 826 935 1.13 165 3053 1.81 1.38 1300000 0.08 360 o.23 2.92 0.10 240 0.35 3.47 2:2x 1O Plan: Cascade Date: 11 MaY 2011 Location: 670 Jex LVL Beam Load Parameters Floor LL (psf) Total Floor Load(Psf) Floor Span (ft) Total Floor Load (Plf) Wall Height (ft) WallWeight (Psfl WallLoad (Plf) Roof LL (psf) Total Roof Load (Psfl Roof Span (ft) Roof Load (Plf) Beam Weight (Plf) Live Load (Plf) Total Load (Plf) Reactions & Moment Duration lncrease Beam Span(ft) Reaction 1 (lb) Reaction 2 (lb) Max Moment FtLb Max Shear Lb Max Shear Stress (Psi) Determine Size Depth Estimate (in) Width Estimate (in) Cross Area (in^2) Allowable Bending Stress = Allowable Moment = Momemt of Inertia | = Factor Of SafetY = Allowable Sheer Stress (Psi)= Allowable Sheer Force (lb)= Factor Of SafetY = Bearing Required = E (psi) Deflection LL (in) LLoad Def. Limit L/ Allowable Deflection (in) LL Deflection F/S Deflection TL (in) Tload Def. Limit U Allowable Deflection (in) TL Deflection F/S Selection RB-1 FB-3 40 40 50 50 017 o 425 70 20 20 140 0 40 40 55 55 20 550 9.6 18 40 340 205 443 1 16 1637 1637 6549 1637 49 9.50 3.5 33 2684 11775 250 1.80 285 6318 3.86 0.62 1900000 0.12 360 0.53 4.30 0.64 240 0.80 1.26 2:9/2" 1 16 3545 3545 14179 3545 57 11.88 5.3 62 2604 26793 734 1.89 285 1 1850 3.34 0.90 1900000 0.36 360 0.53 1.48 0.47 240 0.80 1.71 3:11718" Plan: Cascade Date: 11 May 201 t Location: 670 Jex TJI Joist Span (ft) Depth Load Parameters Floor Dead Load Floor Live Load Total Floor Load Simple Span Joist Duration Increase Joist Span(ft) Joist Spacing Joist Weight (plf) Joist Loading (plf) Max Reaclion (lbs) Max Momenl (FtLb/tf) Max Shear Lb Determine Joist Size Depth Max Moment 100% (ft-lbs) = F. S- for moment = Max Shear 100% (lbs) = F. S. for shear = Bearing Required (in.)= Live Load (U360) = Total Load (L/240) = El x 10^6 (lb-in^2) Live Load Detlection (in) Total Load Deflection (in) Live Load F of S Total Load F of S Selection 210 t6 9.5 10 40 50 1 16 16 2.6 69 554 2217 554 9112" 260V 1.29 980 1.77 2.00 0.53 0.80 167 0.51 u.oo 1.05 1.21 I 1/2" 210's @ 16'o.c Plan: Cagcade Date: 1t May 2011 Location: 670 Jex Seismic Calculations Loading Summary Floor Dead Load (pso 10 Floo. Live Load(ps0 40 Walls (Extxps0 20 Walls (lntxps0 10 Roof Oead Load(psf) 15 Roof Slope Exterior Snow Load Reduction Slope Snow Pitch over 20 Rs Reduction L.L.- Reduction Total Load Seismic Zone E Roof LL(psO 40 RoofDl(psf) 15 6 112 combination Seismic Paramaters 26.56 V=CS'W/l.4 40.00 Fa= 1 R= 6.5 table1617.6 Ss= 1.5 Sms= 1,50 eq. 16-'to 40.00 sds= 1.00 eq 16-18 55.00 Cs= 0.184 Pereq 1649 Adj. Factor 1.4 cs= 0.1317 Length W(Psf) Lb/ft width w(b) 50 23 1 150 51 58650 roofwall 8o8o Total Mass Tributary to Roof Levels = 66730 Shear (Vxlbs) Roof Levels = 8791 Length w(Ps0 lb/ft width W(lb) s0 10 500 sl 0 wall height 0 aOAO Total Mass Tributary to Floor 2= 0 Shear (V)(lbs) Ftoor Levels = 0 Length W(PSO lb/ft Wdth w(b) 50 10 500 51 15020 wall height I 10'100 Total Mass Tributary to Floor 1= 25120 Shear (Vxlbs) Floor Levels = 3309 Roof Flooi 2 Floor 1 Fbor 1 Lateral Force 0 Floor 2 Lateral Force u Rool Lateral Force a/91 lotal seismic Mass = 918U.) Total Lateral Force = 6791 seismic Force Distribution "' Roof Sections ""' Roof Fbor 1 tloot z V/sum(wl-Hl) = E asemenl Dneer wall Total Load (kips) nght side tett side tronl bacl( Froor'r lneer wall Total Load (kiPs) nght srdeten srde lronl bacK Ftoor z lneer wall Total Load (kips) nght srde tett sidetrontbacK shear wall critical Lengths Front Back Right Left H(x) w(x) kip W(x)H(x) 13.3 67 8E4 1.0 U U 0.000 Totals 67 884 0.(10994 Total shear (lbsl = F(totar) 8.84.4 4.4 4.4 4.4 F (totar )8.84.44.4 4.4 4.4 l-(totar) Length 8.84.4 10 4.4 10 4.4 10 4.4 10 o/o Force Total Sheer I 100.00% 8.7907609 u.0lJ% E./90/ti09 U.oU% A.r/90/609 1 6/91 Shear Wall Load (Plf) Not Applicable Not Applicable Not Applicable Not Applrcable Shear Wall Load (Plf) 1t6163 314 336 Shear Wall Load (PlO Not Applrcable Not ApplicableNol Applr@bleNot Applrcab|e cntrcal | (tt) 6 I I Length 10 10 10 10 Length 25 241413 uL (pr) 951934350350 o-53 442'1067 1 199 4 1848 2350 1766'1898 wall uL l-loor uL200 375 200 350 200 50 200 50 Root uL 6JZ.C852.5275275 catculate uplitt, Force Req'd to Prevent oT (lbs, Panel Length (ft) Frcnt Back Right Left ZJ 3750 2799 42'18 3284 2465 2'116 2597 2248 8-1955-1387 367499 Plan: Cascade Oate; tl MaY 2011 Leatio: 670 Jex Wind L@ding Calculations using Main Windforce'Resistlng System (MWFRS) Lon gitudinal Dlrection Wlnd b.lsn Cdtrd.nb P=wind l€d'exp c@tf lw P=Dsign Prsure Horizontal Wind L@d (from table '1609.6.2,1(1) WallL€d (pst= end zme (A) inlerior zme (C) R@f Load (psf)= end rcne (B) intqior zoe (D) Verti@lWind Load (from table 1609.6.2.1(1) R@f Load (psD= end zonewindward (E\ -7.2 od zme leilard (F) -9.8 interid zoe windward (G) -5.2 interior zone lward (H) -5.2 Exposu.e C@ficifli (ftom table 1609.6.2.1(4) 1.21 lFtmportan@ Factor(from table '1604.5) 1.0 Roof Slop = R@f Ansl6 {dos}- P=wind load*exp c@fPlw hqizonial wall intqior hqizontal wall sd zone horizontal @of interiot horircntal oof end zone vertiel end zgne windward verti€l end zone leward vertiel inierior zone windward verti€l interior zone leilard .4'Hmean .'1'base End Zone Width (ft) lnteris Zme Vudth (ft) Gabb Root Lmd Hip Rd Ldd Flw 1 Diapkar Sh.ar Total Shear(lbs) Front Wall Length Back Wall Lsgth b$ffiont Dl.ph.F Shoar Total Shear(lbs) Front Wall Lenglh Back Wall Ltrgth 16.1 11.7 2.6 5 41 wldh End 5 fnterior 41 2nd storyEnd Zone Width (ft) 2nd Storyl nterior Zoe Width (ft) 90 Roof Height 8.50 C Wall Height 9 Tru$Span 34 6 112 26.56 Sine = 0.4472 Minimum Pressre Adjusted 14.16 14.16't9.48 19.48 3-27 10.00 3.15 10.00 .8.71 0.00-11.86 0.00-6.29 0.00-6.29 0.00 5 5 41 Area windlo.d End 433.5 10.00 tntsjd 6 10.00 Total Width kighl End 5 1.0 Interior 41 1,00 Hotsht Wind Lsd 2.4 19.48 3.05 14.16 Sum = 19.48'14.16 Sum = Fd@ {lbr}2U 3163 3396.42 For6 (lb) 4335 o 4335 2nd Sttr Forc. llbrft) Fdc. (br 195 194.81 580 580.44 775-247 775.25 o 0 0 o 81012-1325 -2221 -3117 -1085 -1964 -2843 Fld 2 Diaphrar shear Total Shear(lbs) 4335 Front Wall Length 10 Back Wall Length 10 bnolh Wind Load 22.50 FALSE 22.ffi FALSE 22.fi FALSE 22,50 FALSE shear wall Loads (plt) Not Appli€ble NotAppli@ble Shear wall Loads (plf) Shear wall Loads (plf) NotApplicable Not Applicable Total 1 1 100 Tolal (pr) 55 widh end zone windward 5 leilard 5 interior zone windward 41 leilard 41 375 405 46 466 429 673 -206 Crittcal Wall Length (ft)= F ont Wall Dead L€d (pf)= 951 Front Wall Criti€l Length (ftF 4 Back Wall Oead L@d (Pt0= 934 Back Wall Criti€l Length (ft)= 4 Calculaie Uplift, Force Req'd to Prevent OT (lbs) Panel Length (ft) 2 3 r0537 14 11312 10 10 1362 914 1552 1113 Front Back Plan: Cascade Date: ll M.y2011 L@ation: 670 Jex wlnd L@ding Calculations u3ing Maln \Mndtorce-Resisiing System (MwFRS) Tran3verse Direclion Wind klgn C€tfld.nb P=wind load'exD coeff* lw P=D6ign Prsure Hqizontal wind L@d (ftom table 1609.6.2.1(1) Wall Load (psfF end zone (A) interiorzone (C) Rooi L@d (ps0= end zone (B) interior zone (D) 2.7 verti€lwind Load (lrom table '1609.6.2.1(1) Root Load (Psf)= end zone windward (E) -7.2 end zone leryard (F) -9.8 interior zone windward (G) -5.2 interior zone leilard (H) -5.2 Exposure C€{fcient (lrcm table 1609.6.2.1(4) lFlmportan@ Faclor (frm table 1604.5) Wind Stsed: 90 Expuro C Rd Slots - RootAnsl€ (&s). 26.56 P=wind load'exp coeff lw horizontal wall interior 14.16 horizontal wall end zone 19.48 horizontal roof interio. 3,27 horizontal roof end zone 3.15 wdi€l end zone windward -4,7'l wrti€l end zone leilard n 1.96 wrti€l interior zone windward -6.29 vertiGl interior zone leila.d -6.29 End Zone Width (ft) Inlerior Zone Width (ft) G.bb R@t Ldd Hip Roof Ldd Wlll Ldd '16.1 't1.7 2.6 '|.21 1.0 Roof Height 8.5 Wall Height 9 Tru$ Span 34 6 t12 Sine = 0.4472 Minimum Presure Adjusted 14.1 6 19.48 10.00 10.00 0.00 0.00 0.000.00 5 40 wdh End 5 lnterior 40 Area End 425 Inlerigr 0 width End 5 lnterior 40 2nd sioryEnd Zone Width (ft) 2nd Storylnterior Zone Width (ft) H.lsht Wind Ldd Fd€ (lb) 2.4 19.48 2U 3.05 14.16 3086 Sum = 3319.281 40 10.00 4250 10.00 0 Total 4250 Helght'1.0 1.00 wind L@d Forc. (lb) 19.48 195'14.16 566 Sum = 761.09 wind Ldd Fd6 (lbrl FALSE O FALSE O FALSE OFALSE O znd Slory 194.81 566.28 761.09 widh 5 5 40 40 4681012 708 416 123 -169 461 656 364 72 -220 -5131000 854 948 802 Front Back end zone windward EilATd interior zone windward EWard bngth 42.50 42.50 42.50 42.50 Shearwall Loads (pl0 Not Appli€ble Not Appli€ble Shear Wrll Loads (pl0 215 207 Shear Wall Loads (plo Not Appli€ble Not Appli€ble Total 11312 Total (plf) 57 Flod 2 Dl.phrlgm sh.!r Totral Shear(lbs) Lei wall Length Right Wall Length Flor 1 Di.phr.sm Sh.tr Total Sh€r (lbs) Left Wall Length Right Wall Length ht.mnt Dirph.gm Sh..r Total Shear(lbs) Lett Wall Length Right Wall Length Crltlcal Wall Length (ft)= Left Wall Dead L@d (ptf)= Left wall Critical Length (ft)= Right Wall Dead Load (plO= Right Wall Criti€l Length (ftF Calculate Uplitt, Force R6q'd to Prevent OT (lbs) Panel Lengh (ft) 2 3 42&1010 10339 24 11100'10 't0 350 7 350 6 ) Compl iance Gertificate Project Title: 626 Tanglewood 2009 rEcc Rexburg, ldaho Sinqle Familv Bld!. faces 5ts oeg. from North 17o/o 8693 6 Owner/Agent: Brycon Higley Fall Creek Homes 1340 lndian Hollow Ammon, ld 83406 208-5224505 REScheck Software Version 4.4.1 Energy Code: Location: Construction Type: Building Orientation: Glazing Area Percentage: Heating Degree Days: Climate Zone: Construction Site: 1340 Indian Hollow Ammon, ld 83406 Designer/Contractor: High Country Heating High Country Heating P.O. Box 627 Rigby, ldaho 83442 208-745-8056 highcountryhtg@gmail.com Compliance: 3.5% Better Than Code Maximum UA: 311 Your UA: 300 The % Better or Worse Than Code index reflects how close to @mplian@ the house is based on code trad+off rules It DOES NOT provide an estimate of energy use or cost relative to a minimumsde home. Ceiling 1: Flat Ceiling or Scissor Truss Wall 1: Wood Frame, 16" o.c. Orientation: Right Side Wall 2: Wood Frame, 16" o.c. Orientation: Right Side Wall 3: Wood Frame, 16" o.c. Orientation: Back Wall 4: Wood Frame, 16" o.c. Orientation: Back Wall 5: Wood Frame, 16" o.c. Orientation: Left Side Wall 6: Wood Frame, 16" o.c. Orientation: Front Basement Wall 1: Solid Concrete or Masonry Orientation: Right Side Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement Wall 2: Solid Concrete or Masonry Orientation: Back Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement Wall 3: Solid Concrete or Masonry Orientation: Left Side Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Basement Wall 4: Solid Concrete or Masonry Orientation: Front Wall height: 9.0' Depth below grade: 8.0' 1 536 342 25 410 25 342 446 329 50.0 2',t.0 21.0 21.O 21 .0 21.0 21.0 19.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40 19 1 16 1 19 20 't4 19.0 19.0 446 190.0 120.0 19lon Project Title: 626 Tanglewood Data filename: C:\Users\Steven\AppData\Local\Check\REScheck\626 Tanglewood.rck Report date: 06129112 Page 'l of 6 5- Insulation dePth: 9.0' Window 1: Other:Double Pane with Low-E SHGC: 0.58 Orientation: Right Side Window 1: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Right Side Window 1: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Back Window 1: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Back Window 1: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Back Window 1: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Left Side Window 2: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Left Side Window 1: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Left Side Window 2: Other:Double Pane with Low-E SHGC: 0.58 Orientation: Left Side Window 1: Other:Double Pane with Low-E SHGC:0.31 Orientation: Front Window 2: Other:Double Pane with Low-E SHGC: 0.31 Orientation: Front Window 1: Other:Double Pane with Low-E SHGC: 0.58 Orientation: Front Door 1: Solid Orientation: Back Door 1: Solid Orientation: Front 114 0.350 0.350 0.350 0.350 0.350 0.350 0.350 0.350 0.350 0.350 0.350 0.350 0.290 0.290 16 11 1440 12 21 41 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.1 and to comply with the mandatory requirements listed in the REscheck Inspection Checklist. Name - Title Project Notes: Job Number: 626 Tanglewood Signature Date Project Title: 626 Tanglewood Data filename: C:\Users\Steven\AppData\Local\Check\REScheck\626 Tanglewood'rck Report date: OGl29l12 Page 2 of 6 REScheck Software Version 4.4.1 lnspection Checklist Geilings: tr Ceiling 1: Flat Ceiling or Scissor Truss, R-50.0 cavity insulation Comments: Above-Grade Walls: tr Wall 1: Wood Frame, 16" o.c., R-21.0 cavity insulation Comments: tr Wall 2: Wood Frame, 16" o.c., R-21'0 cavity insulation Comments: tr Wall 3: Wood Frame, 16" o.c., R-21.0 cavity insulation Comments: tr Wall 4: Wood Frame, 16" o.c., R-2'1.0 cavity insulation Comments: tr Wall 5: Wood Frame, 16" o.c., R-21.0 cavity insulation Comments: tr Wall 6: Wood Frame, '16" o.c., R-21.0 cavity insulation Comments: Basement Walls: E Basement Watl 1 : Solid Concrete or Masonry, 9.0' ht / 8.0' bg / 9.0' insul, R-19.0 cavity insulation Comments: E Basement Wall 2: Solid Concrete or Masonry, 9.0' ht / 8.0' bg / 9.0' insul, R-19.0 cavity insulation Comments: I Basement Wall 3: Solid Concrete or Masonry, 9.0' ht / 8.0' bg / 9.0' insul, R-19.0 cavity insulation Comments: E Basement Wall 4: Solid Concrete or Masonry, 9.0' ht / 8.0' bg / 9.0' insul, R-19.0 cavity insulation Comments: Windows: E Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without tabeled U-factors, describe features: #Panes - Frame TyPe Thermal Break? - Yes - No Comments: D Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors, describe features: #Panes - Frame TYPe Thermal Break? - Yes - No Comments: E Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors, describe features: #Panes - Frame TYPe Thermal Break? - Yes - No Comments: E Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors, describe features: Project Title: 626 Tanglewood Datia fi lename: C:\Useis\Steven\AppData\Local\Check\REScheck\626 Tanglewood rck Report date: Page 3 06129112 of6 #Panes - Frame Type Thermal Break? - Yes - No Comments: E Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors, describe features: #Panes - Frame Type Thermal Break? - Yes - No Comments: f] Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors. describe features: #Panes - Frame Type Thermal Break? - Yes - No Comments: E Window 2: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors. describe features: #Panes - Frame Type Thermal Break? - Yes - No Comments: E Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors, describe features: #Panes - Frame Type Thermal Break? - Yes - No Comments: D Window 2: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors. describe features: #Panes - Frame Type Thermal Break? - Yes - No Comments: E Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled Ujactors, describe features: #Panes - Frame Type Thermal Break? - Yes - No Comments: O Window 2: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors, describe fearures: #Panes - Frame Type Thermal Break? - Yes - No Comments: D Window 1: Other:Double Pane with Low-E, U-factor: 0.350 For windows without labeled U-factors, describe features: #Panes - Frame Type Thermal Break? - Yes - No D Door 1: Solid, U-factor: 0.290 Comments: Doors: Comments: D Door 1: Solid. U-factor: 0.290 Comments: Air Leakage: fl Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material. suitable film or solid material. tr Air banier and sealing exists on common walls between dwelling units, on exterior walls behind tubs/showers, and in openings between window/door jambs and framing. n Recessed lights in the building thermal envelope are 1) type lC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. Access doors separating conditioned from unconditioned space are weather-stripped and insulated (without insulation @mpression or damage) to at least the level of insulation on the sunounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed to maintain insulation application. Wood-burning fireplaces have gasketed doors and outdoor combustion air. tr tr Project Title: 626 Tanglewood Data filename: ClUsers\Steven\AppData\Local\Check\REScheck\626 Tanglewood.rck Report date: 06129112 Page 4 of 6 Air Sealing and Insulation: D Building envelope air tightness and insulation installation complies by either 1) a post rough-in blower door test result of less than 7 ACH at 33.5 psf OR 2) the following items have been satisfied: (a) Air barriers and thermal barrier: Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b) Ceiling/aftic: Air banier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c) Above-grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d) Floors: Air barrier is installed at any exposed edge of insulation. (e) ptumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or sprayed/blown insulation extends behind piping and wiring. (f) Corners, headers, nanow framing cavities, and rim joists are insulated. (g) Shower/tub on exterior wall: Insulation exists between showers/tubs and exterior wall. Sunrooms: tr Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Materials ldentification and Installation: tr Materials and equipment are installed in accordance with the manufacture/s installation instructions. tr Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. A Materials and equipment are identified so that compliance can be determined. tr Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. tr Insulation R-values, glazing U-factors, and heating and cooling equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: tr Supply ducts in aftics are insulated to a minimum of R-8. All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: D Building framing cavities are not used as supply ducts. tr All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 1 81A or UL 1818 and are labeled according to the duct construction. Metal duct connections with equipment and/or fittings are mechanically fastened. Crimp joints for round metal ducts have a contact lap of at least 1 112 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa). tr Duct tightness test has been performed and meets one of the following test criteria: (1 ) Postconstruction leakage to outdoors test: Less than or equal to 239.8 cfm (8 cfm per 1 00 ft2 of conditioned floor area). (2) Postconstruction total leakage test (including air handler enclosure): Less than or equal to 359.8 ctm (12 cfm per 100 ft2 of conditioned floor area) pressure differential of 0.1 inches w.g. (3) Rough-in total leakage test with air handler installed: Less than or equal to 179.9 cfm (6 cfm per 100 fP of conditioned floor area) when tested at a pressure differential of 0.1 inches w.g. (4) Rough-in total leakage test without air handler installed: Less than or equal to 1 19.9 cfm (4 cfm per 100 ft2 of conditioned floor area). Temperature Controls: D At least one programmable thermostat is installed to control the primary heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle. Heating and Cooling Equipment Sizing: tr Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. D For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating (Sections 503 and 504). Circulating Service Hot Water Systems: Project Title: 626 Tanglewood Data filename: C:\Users\Steven\AppData\Local\Check\REScheck\626 Tanglewood.rck Report date: 06129112 Page 5 of 6 tr Circulating service hot water pipes are insulated to R-2. tr circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when thesystem is not in use. Heating and Cooling piping Insulation: D HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: D Heated swimming pools have an on/off heater switch. n Pool heaters operating on naturar gas or LpG have an erectronic pirot right. D Timer switches on pool heaters and pumps are presenr. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar- and/or waste_heat_recovery systems. B Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees c) the cover has aminimum insulation value of R-12. Exceptions: Covers are not required when 60% of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: tr A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the foilowing: (a) Compact fluorescent (b) T-8 or smaller diameter linear fluorescent (c) 40 lumens per watt for larnp wattage <= 15 (d) 50 lumens per waft for lamp wattage > 15 and <= 40 (e) 60 tumens per waft for lamp wattage > 40 Other Requirements: n Snow- and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shuftingoff the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature isabove 40 degrees F (a manual shutoff control is also permitted to satisfy requirement 'c'). Certificate: tr A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values; windowu-factors; type and efficiency of space-conditioning and water heating equipment. The certificate does not cover or obstruct the visibilityof the circuit directory label, service disconnect label or other required labels. NOTES TO FIELD: (Building Department Use Onty) Project Title: 626 Tanglewood Data filename: clusers\steven\AppData\Local\check\REScheck\626 Tanglewood.rcK Report date: 06129112 Page 6 of6 d 2009 IECC Energy IJJ Efficiency Gertificate Ceiling / Rool Wall Cooling System: 0.31 NA 50.00 21.00 19.00 Fry 0.35 0.29 Window Door Date: -Name: - Comments: Floor / Foundation *E$oJ-g')-F =rl- 00-00-€z '' 00-00-sz II 12 00307 626 Tanglewood - SFR Office CoPYtll'MiTek. Re: J1156-12 FallCreeV626Tanglewood/9-4lJR(ID)R MiTek USA, Inc. 7777 Greenback Lane Suite 109 Citrus Heights, CA, 95610 Teleohone 916/676-1 900 Fax 916/676-1909 The truss drawing(s) referenced below have been prepared by MiTek Industries, Inc. under my direct supervision based on the parameters provided by Trussworks, Inc.. Pages or sheets covered by this seal: R35095512 thru R35095546 My license renewal date for the state of Idaho is August 31, 2013 . Idaho COA: 853 Lumber design values are in accordance with ANSVTPI I section 6.3 These truss designs rely on lumber values established by others. September 4,2012 Tingey, Palmer The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of this component for any particular building is the responsibility of the building designer, per ANSI/TPI l. ffif,\sr€4! Snake River Truss & Compononts,ID:EePgszKgVQpovwScnvwQdGyh-U5.iShQIopY4yHoF\A/2uAo.U2cw4hzvwn0|4gobzP77ygyTu Job J1156.',t2 lruss \1 fruss Type Soecial Truss Itv Plv 1 Fallcreekr'626Tanglilood/g/JR(lD)R R350955.12 ldaho Falls. lD hl6 - 1:S.6 DEFL in (loc) l/defl Ud Vert(LL) -0.26 6-8 >999 360 Vert(TL) -0.59 &8 >461 24o Horz(TL) 0.04 6 n/a nla Wind(LL) 0.04 6-8 >999 240 Plates Increase 'l.15 Lumber Increase 1.15 Reo Siress Incr YES Code lRC2009/TP12007 LOADING (psf) TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL O.O LUMBER TOP CHORD 2X4 DF No.l&Btror BOT CHORD 2X4DF No.1&Btr or WEBS 2X4DFSlud/Std VVEDGE Left: 2 X 4 DF Stud/Std, Right: 2 X 4 DF Stud/Std REACTIONS (lblsize\ 2=13O7tO-$8 (min. C1-8), 6=1307/0-3-8 (min 0-1-8) Max Horz 2=127(LC 10) Max Uplift2=-116(LC 11)' 6=-116(LC 11) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown' TOp CHOdD' 2_9=_1 605/1 38, 3-9=-1485/1 62, 3-1 0=-1 1 86/1 30, 1 0-1 1 =-1 050/1 35, 4-11=-1O45t149, *12=-1045|150,12-13=-1050/135,5-13=-1'186/130,$14=-'1485/163,6-'14=-1605/138 BOTCHORD 2-8=-4011197,6-8=-5111197 WEBS 4-8:371662,5-8='4811129,3-8='4811129 NOTES 1) VMnd: AscE 7-05; gomph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45fr; L=24fr; eave=4fl; Cet. ll; Exp B; enclosed; MV\FRS (all' n"ight.l ""J C-C Lxterior(z) -t-z-o to 1-6-0, tnterior(l) 1-$o to 'l'l-so, Exterior(2) 'l 1-6-0 to 1+6-0 zone; cantilever left and right exoosed : end verlicat teR and right exposed;C-C foi members and forces & MVVFRS for reaclions shown; Lumber DOL=1.60 plate griP DOL=1.60 z) iiul: nSCe 7-05; Pf=35.0 psf (flat roof snow): Category ll; Exp B; Partially Exp ; Ct=1 1 3) Unbalanced snow loads have been considered for this design' +i ini" fu"" n"" Ueen designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 35.0 psf on overhangs non-concunent with other live loads. S1 inis truss has Oeen designed for a 1O.O psf bottom chord live load nonconcunent with any other live loads' Oi i init fr.r n"" been deiigne<l for a live load of 2o.Opsf on the bottom chord in ell areas where a rectangle 3-S0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) This truss is designed in accordance with the 2OO9 International Residential Code sec{ions R502.1 t -1 and R802.10.2 and referenced standard ANSI/TPl 1. g) This truss design allows for the following max. bolt holes along the member c/lines spaced a min. of 0-&0 apart: 0.500in in the top chord, O.sooin in the bottom chord. LOADCASE(S) Standard PLATES GRIP MT20 220t195 Weight: 104 lb FT = 0% Structural wood sheathing directly applied or 4-4-2 oc purlins Rigid ceiling directly applied or 10-0-0 oc bracing MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer DF UT 1800F 1.6E'1800F 1.6E BRACING TOP CHORD BOT CHORD oF9*w September 4,2012 t -;r-1 7777 Greenback Lane, Suite 109 cilrus HEights, cA,95610 A "*,{Ilf* "*JU dAigl PO'reI* Ud READ JIOTES O'Y T'{IS TilD IJVC,,t'DED fiTEKREFSRENTB PAGE NTIT'7473 BEFORE {'SE. Tesign volid for use o-nty *itn Mn"t conn@loF. This dgsign is bosed only upon poromeleB shoM, ond is for on individuol building component' Applicobitity ot desrgn poro..t.o on-Jpffiiin."rpor"-ri* "t "ompoirent is i*ponsibility of building designs- not lru$ designer' Brocing shoM iiT,iillrrci!"pp"rr"ot inoiviauqtreu mEm[m oniyl naaitionol lemporory brocing lo insure slobililv during-conslruclion is ihe responsibillilv of the *^-a^r hi^^i^^ ^r tha ^wa6[ <rn hfilF is rhe resDonsibilitu 6f the buildinq desioner. For generol guidonce regording5l1i3i:Xdi:i#il] ;l,l#Hil;;;iinZ".id'iirr'ri..]'Lis *,"iJtpo'"'ioiriry Jt the buirdins desisnerlor-s-enerol suidonce resordins fobricotion, quotity controt, storoge, oeiiiew,ilt]lo^ "nJoi""ing, """1r"[ l'ttst/Irtt Quomv cne'b, Ds8-89 ond Ecsl Bulldlns componenl ;:;;-,-;;-;;;' ^-^r^Aro t^'i rn '<r pldte lnslitule. 781 N. Lee Sfieet, Suite 312. Alexondrio, VA 22314.solelv lnldmoflon ovoibb|e from Truss Plole Inslitule, 781 N' tl Sofrtrern Prne I SP or 5Pp) lumber i3 3 peciti€d' the de!il"i,iilili?flii'l?isE""?:ff )i;iiib;"ii;';i,iiiii;; Fallcre€k/626Tanglewood/9'4/JR(lD)R R3SO9551 3lob t1156-12 Truss A1G Truss Typ€ GABLE atv Plv 'l Snafe River Truss a Components, ldaho Falls, DEFL in (loc) l/defl Ud Vert(LL) -0.04 15 nlr 12o Vert(TL) -0.04 15 n/r 120 Horz(TL) O.OO 14 nla nla sPAcrNG 2-O-O Plates Increase 1.15 Lumber Increase I 15 Reo Stress Incr YES Code lRC2009/TP12007 LOADING (PsO TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL O.O PLATES GRIP MT20 2201195 Weight: 136 lb FT = 0% LUMBER TOP CHORD 2 X4 DF No"l&Btror DF 1800F 1'6E AOf CHOnO 2 X 4 DF No.1&Btr or DF 1800F 1 6E OTHERS 2X4DFStUd/Std \A/EDGE Left: 2 X 4 DF Stud/Std, Right: 2 X 4 DF Studistd REACTIONS All bearings 23-0-0' (lb) - Max Hoz 2=127(LC 10) MaxUplifi All uplifl'10-dlborlessatloin(s) 2'22'23'24'25'20'19'1€'17' 14except26=-126(LC 15)' 16=-126(LC ls) MaxGrav ntt ,"""iion" jsolborlessatioint(s)2'l' 23'24'25'26' 19' 18' 17'16ex?/Jpl2=426(Lc 15)' 22=2s8(tc 2), 2O=298(LC 3), 14=426(LC 15) FORCES (lb) - Max. Comp./Max Ten - All forces 250 (lb) or less except when shown' \A/EBS 7-22=-266t56,9-20=-266/56 NOTES 1)Wnd:AscE7-05;gomph;TcDL=4.2psf;Bc_DL=!2'e.?|)h=25fi;B=45fl;L=24fr;.eave=2ft;ca|||;ExpB;enc|osed;MvvFRs(al| heights) and C-C Comerls; -r-ZO to i-e-0, exterio(21 r-OO to'r l-5.O,'Comer(3) 11-6-0 to '14-6-0 zone: cantilever left and right exposed ; end vertical lefi and right exposed;C-C for members and forces & MinFRS for reac{ions shown; Lumber DOL=I'60 plate , ?,rllr??5l"t"ta for wind roads in the prane of the truss onry. For sruds exposed to wind (normar to the face), see standard Industry Gab|eEndDetai|sasapp|icab|e'orconsu|lqua|ifiedbui|dingdesignerasperANS|/TP.|1-2002. sr iclL-: Asce z-05; pt=35.0 psf (Rat roof snow); category ll; Exp B; Partially Exp'; ct=1 1 li UnbalanceO snow loads have been considered for this deslgn' ;i ;|.;ffi;;";;;"^ o""ig""o 6i;;ei oimin root tive toa-d or 16.0 psr or 2.oo limes flat roor load or 35 0 psr on overhangs non-concunent with other live loads' 6) All plates are 1.5x4 MT2o unless otheMise indicated' 7) Gable requires continuous bottom chord bearing' 8) Gable studs spaced at 2-0-0 oc. 6i inir ir.i n"r oeen designeJfir a 1O.O psf bottom chord live.load nonconcunent with any other live loads' 1o) " This truss has been oesigneJ tor a live load of 2o.opsf on the bottom chord in all areas where a rectangle &6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members' 1 1) This truss is designed in accoioance witir the 2OO9 International Residential Code sections R502 1 1'1 and R802' 10'2 and referenced standard ANSI/TPI 1. 12)Thistrussdesigna||owsforthefo|lowingmax.bo|tho|esalongthememberd|inesspacedamin.of0-6-0apart:0.500ininthetop chord, O.500in in the bottom chord. LOAD CASE(S) Standard BRACING TOP CHORD BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins' Rigid ceiling dkectly applied or 1GGo oc bracing' k"r9*w September 4,2012 - -r!^ 772 Grsnback Lane, Suite 109 Citrus Heights, CA, 95610 @ etw qnd RELD trtoras or{ rflrs -arrrD lwLwED wra (R^EFEREITcE PrcE wI'7473 BEP0RE ItsE' Desrsn vorid for ure onry wiih ruirer connegb!:l!!-9?L9i-'l ?91*-"iY:f,1itrsR',l9il,n',iitr.flx"i'.t'#*i*"iiig::'lill3is'T$!",1t;*?3'j?,:.fl;*t8iJ=flX#i"Ti:",1;T1;:;"Jil:1il:L"l.-;i::";d;G;,'-; ,H*niioiritv Jiuuitains desisnd - noilru$ desisner' Brocins shoM is for tolerot support of indiviOuotreo mlrifilo on-f'i iiOifionof f".poro,V Urolfi6 i"lnilt. ,f"Uiriry-Ounnd tonslruc1on is the responsibillity of lhe erector. Additionor p*on"n, oro.,nJ-oiiGtuerctt structure is tne responsiL]litv & tne building designer.lor gserol guidonce regording fobricorion. quotity conrror, storoge. oeiiie;."";Ji;;;;;;;;"ins. consutt - ilsinpir ou"tti cdtedo, DsE-89 and BCSI lundlns componsl i:gxf ,,;i+fl1f;:i:?"".1$mHlll;nlt-l!:1"#l*f"'m:lm":mm lob t11!fi-12 fruss )1 fruss Type :ommon Truss Ity Plv 1 FalloreU626Tanglewood/94/JR(lD)R R35095S.t4 Truss & ComDonents. ldaho Falls. lD 83401 7.250 s Aug 25 201 I MiTek Industries, Inc. nTrXl tqgiBJjzSDg26iZB3kSYgYTR 9 DEFL in (loc) Udefl Ud Vert(LL) -O.17 8-9 >999 360 Vert(TL) -O.29 8-9 >928 24O Hotz(TL) 0.04 5 nla ^la wind(LL) 0.04 *7 >999 240 SPACING 2-O-O Plates Increase 1.15 Lumber Increase 1.15 Reo Stress Incr YES Code lRC2009/TP120070.0BCLL LOADING (psf) TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 LUMBER TOP CHORD 2 x 4 OF No.l&Btr or DF 1800F 1.6E BOTCHORD 2X4 DF No.1&Btror DF l800F 1.6E VVEBS 2X4DFStud/Std'Exceptt 1-9:2X 4 DF No.1&Btr or DF 1800F 1.6E \A/EDGE Right: 2X4DFStud/Std REACTIONS (lb/size) 9=1267/0-5-8 (min. o-1-8), 5=1 338/0-3-8 (min. 0-1-8) Max Horz 9=-21 3(LC 9) PLATES GRIP MT20 2201195 Weight: 129 lb FT = 0% BRACING ToPcHoRDStructufa|woodsheathingdirect|yapp|iedor4.G10ocpur|ins'except BOT CHORD \A/EBS end verticals. Rigid ceiling directly applied or 10-0-0 oc bracing, Max Uplift9=-70(LC 1 1), 5=-1 17(LC 1 1) FORCES (lb)-Max.Comp./Max.Ten.-Allforces250(lb)orlessexceplwhensho*n' .---.--^ rop cnoio' 2-12=_s3at151,o^12=-749t169,3-1 3=-838/166, 4-13=-1A321151,4-14=-15031142, ,1 4=-16641 1 1 1, 1 -9=-257 I9O BOT CHORD 9-'15=-9/626, 'l$16-9/626, 8-16=-9/626' 7-8=-11t1218, $7=-1011220 VIEBS 2-8--471276,3-8=-68/440, 4-8=-6501137,4-7=ot262,2-9=-10171129 NOTES il-wino: nsCe 7-05; gomph; TcDL=4.2psf; BcDL=4.2psf; h=25fl; B=45fi; L=24ft: eave=4fli Cat ll; Exp B; enclosed; MVVFRS (all heights) and c-c Exterior(2) o-'t-121o 31-12, Interior(1) 3-1-1 2 to 8-8-12, Exterior(2) 8-8-1 2 to 1 1-8-1 2 zone: cantilever lefl and right exDosed : end vertical lefl and right exposed;C-C for members and forces & MVVFRS for reactions shown; Lumber DOL=1.60 plate griP DOL=1.60 zt iit-l: nsce 7-05; Pf=35.0 psf (flat roof snow); category ll; Exp B; Partially Exp'; ct=1 1 3i Unbalanced snow loads have been considered for this design. +1 inis mss nas Ueen designed for greater of min roof live load of 16.0 psf or 2.OO times flat roof load of 35.0 psf on overhangs non-concunent wilh other live loads. 5; ihis truss has been designed for a 1o.O psf bottom chord live load nonconcunent with any other live loads. ei . ttris truss nas been deiigned for a live toad of 2o.Opsf on the bottom chord in all areas where a rectangle $6-0 tall by 2-0-0 wide willfit between the bottom chord and any other members, with BCDL = 8 opsf' 7) This truss is designed in acrordance witir tne 2OO9 International Residential Code seclions R502-'l 1.1 and R802.10.2 and referenced standardANSI/TPl 1. al i'tris iruss Oesign allows for the following max. bolt holes along the member c/lines spaced a min. of 0-&0 apart: 0 500in in the top chord, 0.500in in the bottom chord. LOAo CASE(S) Standard 4. Ja3b o' BP4Y.?'. ^b5/A G'g#t September 4,2012 - -II" 77n Gr@nback Lan€, Suite 109 Citrus Heights, CA, 95610 A I[ARlfl,r- v"rtJv dsignp..'@etFandREAD,IOT&S O,v r'lts.itrrtDt mtwaD WTEK REFERElrcEPAGEtiltlI47A BBFORE {JSE' Desisn vorid for use onty *iln t"m"t conn@1o6. This desisn is b9t"d 9ry- yrylffIl1l:l?f.'Ltyl',gfi:l?::l'*:Y'?:J1 ::'1iiH."3flff:".1t;*ffi?:.";iii 'ji;ff;T;l]'f!ifi:;;$;;o-Eiin"".po-,""ri"n oi "o-poi "i't.is Eponsiolity of buirdjns desisns - nol rrus desisner. Brocins shom is for lolerot support of individuot reo m'em6em ontyi raaitonol temporory orociirg to insure slobility during-conslruclion is lhe responsibillity of the ;;i;;. A;aiii;;i pmnenr uroctng-;ifne ou"i"rr si-iiure is lhe;esponsibility of the buildins designer' For^s-enerql suidonce regqrdins fobricotion, quolily controt, storoge, oeiiiery, "L"fion "nJ On".ing, conlufi -lfSt/fnl O@[ly Cdtcffo, DSB-89 qnd BCSI Sulldlng Componcnli"uriiroii"n, qu"ritv."ntrot, storoge, aeiivery,Lrlcl'on ond brocing, conlu[ AilsyrPll Q@[lv cdtcdo' iof"ir fnf-.bfon' ovoiloble fro; Tru; Pl;l; Institute, 781 N. l-ee Street, Suite 312' Alexondrio'-vA 223-l-4' . ii-ii"itliiiii'i,'iilisF ol siot rumuerli ioeiiirta,itre aerisn \slue3 tlq !!99!l&4q19q41!q1?l lob t1'156-12 Truss B'IG 'russ Typ€ JABLE ctv 1 1 Fallcr€€k/626Tanglewood/9-4/JR(lD)R R3SO9551 5 lnduslries. fnc. Tus Sep 04 14:35:322012 Page Snake River Tru$ & Components, ldaho Falls, lD 83401 1 Aug lD:EePgsZKgVQpo\/wgCn\M)QdGyh-U5-32VJovthuUv4Llxrvv3DvanxpxzhaYPAtgAoKygvTP' q,+Z r 921? t 1?211 t u;l1f t2fff t7-1-13 16-042-10 ':sofls , 3 9 DEFL in (loc) l/defl Ud Vert(LL) -0.17 8-9 >999 360 Vert(TL) -0.29 8-9 >928 24O Hoz(TL) 0.04 5 n/a nta Wnd(LL) 0.04 5-7 >999 24o Plates lncrease 1.15 Lumber Increase 1.15 Rep Stress Incr YES Code lRC2009/TP12007 LOADING (psO TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL O.O LUMBER TOP CHORD BOT CHORD \A/EBS OTHERS VVEDGE 2X4 DF No.1&Btror DF 1800F 1.6E 2 X 4 DF No.1&Btr or DF 1800F 1 .6E 2 X 4 DF Studistd -ExcePt- 1-9:2X 4 DF No.1&Btr or DF 1800F 1 6E 2X4DFStud/Std PLATES GRIP MT20 2201195 Weight: 166 lb FT = 0% BRACING TOP CHORD Structural wood sheathing directly applied or 4-G10 oc purlins' except BOT CHORD \A/EBS end vedicals. Rigid ceiling directly applied or 10-0-0 oc bracing. Right:2X4DFStud/Std REACTIONS (lb/size) 9=126710-&0 (min. G1-8), 5=1338/0-3-8 (min G1-8) Max Horz 9=-213(Lc 9) Max Uplift9=-70(LC 1 1), 5=-1 17(LC 1 1) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown' TOp cHoiD' 2-23=-93it151,3-23=-749t169, &24=-838/165, 4-24=-1032t151, +25=-15031142, *25=-1664111 1, 1'9=-257 I9O BOT CHORD g-26='9t626,26-27:91626,A-27='91626,7'8=-1111218, S7=-1011224 VVEBS 2-A--471276,3-8=-68/440,4-8=-650/137, 4'7=01262'2-9=-1O171129 NOTES ij-vfono: lSCe Z-os; gomph; TCDL=4.2psf; BCDL=4.2psli h=25ft B=45ft; L=24fl; eave=4fr; Cat. ll; Exp B; enclosed; MV\FRS (all.' neight") anO C-C Lxeribr(2) o- 1.12l;3-1-12,Interio(1) &1-121o 8-8-12, Exterior(2) 8-8-12 to 11-8-12 zone: cantilever lefl and right ""pi""it I end vertical lefr and right exposed;C-C for members and forces & MVVFRS for reactions shown; Lumber DOL=I 60 plate griP DOL=1.60 e; iruss Oesigned for wind loads in the plane of the truss only. For studs exposed to wind (norm€l to the face), see Standard Industry' Gabte Endbetaits as applicabte, or consult qualified building designer as per ANSI/TP_I 1-2002. 3) iCLL: ASCE Z-OS; pt=35.0 psf (flet roof snow); Category ll; Exp B; Partially Exp ; Ct=l 1 li Unoatanced snow loads have been considered for this design' ;i il;6.; h"a been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 35.0 psf on overhangs non-concunent with other live loads' 6) All plates are 1.5x4 MT20 unless otherwise indicated. 7) Gable studs spaced at 2-0{ oc. Ai This truss nas been designed for a 1O.O psf bottom chord live load non@ncurent with any other live loads' Si ; ihi. tr.. fr"" been deiigned for a tive load of 2o.Opsf on the bottom chord in all areas where a reclangle 3-6-0 tall by 2-G0 wide willfit between the bottom chord and any other members, with BCDL = 8 opsf' 1O) This truss is designed in accordance with the 2OO9 International Residential Code sections R502.1 1.1 and R802.10.2 and referenced standard ANSUTPI 1. t t ) fnis iruss Oesign allows for the following max. bolt holes along the member dlines spaced a min. of 0-6-0 apart: 0.500in in the top chord,0.500in in the bottom chord. LOAD CASE(S) Standard w September 4,2012 ffiMiTek" 772 Gr@nback Lane, Suite 109 Citrus H€ights, CA, 95610 6rwenmnc v-i1y daignpmct.#mdnEADJSTESOr{I''IS..I\'DIJ\aC,,UDEDT4TEKREF.AREIWEPAGB*IILz4TJBBFOREI'SE' Design volid for use o.,ty wtn tarlt.onnrctoB. this design is bosed onv upon poromeJe6 show, ond is lorqn individuolbuilding componenl' ADoticobitilv of d6jsn poro-.rro onJpiJp"iincqporoiion of compoireirl i: rsponsibility ot buildingdesigntr - nol lru$ designer' Erqcing shoM i;i;;L;',"d;;iiiai"ia*i*ui'EiiE!"i-^r-rvll,:*1,;:q,':,"":::SX*iiJ:,i?5tJ,ffifJ'y,3#11:ru'l#lJ,j,l'HJ:'&13illy''^":,Si;,]eil:i,5n"oi#;;;il;;;;;iin-""i.i"rr.r.iiu," is the;esponsibitity;r the buildins desiener. For-s-endolsuidonce resordins i"ii."ii""lq""iitv J""trot. storoge, oeiivlry.-.i"Jon "n-Jor".ing. ."niutt ANs/lPll Quq[tv crlterto, Dsr-89 ond Ecsl lulldlns componcnl i"tf" fni-."ff"n' ovoitbte fro; Tru$ ptote Insiitute, 781 N. Lee Streel, Suite 312, Alexondrio, VA 22314. ir-i-.,,itiriiiii'liitisF or lFil rumler ii ii;;iii;;;-t'h;d;;rsts;iu;; ;ie th;ae effecrive 06,0rlm1? bv ALsc or proposed bv sP{B Job J't1S-12 Truss fruss Type ]OMMON TRUSS otv 1 Plv 2 FallCrek/626Tanglewood/g4/JR(lD)R R35095516 River Truss & lD: EePg5ZKgVQpoVWgCnVWQdGyh_U5-XF3horuJfo1 xzRWl \MbSSnl(mjx_pQZTZOXQjrnygyTo 3-1-15 X2 Page 1 ljKmygyTO S€b = 1:9.6 Plates Increase 1.15 Lumber Increase 1.15 Reo Stress lncr NO Code lRC2009/TP12007 OEFL in (loc) l/defl Ud Vert(LL) -0.06 8-9 >999 360 Vert(TL) -0.09 8-9 >999 24O Horz(TL) 0.02 5 n/a nla Wnd(LL) 0.02 8 >999 24O LoADING (psf) TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL O.O LUMBER TOP CHORD 2 X 4 DF No.1&Btr or DF 1800F 1.6E BOTCHORD 2XSDFSS VVEBS 2X4DFStud/Std'Except' 3-8:2 X 4 DF No.1&Btr or DF 1800F 1.6E PLATES GRIP MT20 220t195 Weight: 149 lb FT =Oo/o BRACING TOP CHORD Struciuralwood sheathing direclly applied or4-0-12 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-G0 oc bracing. REACTIONS (lblsize\ 1=57&.10-$8 (min. 0-3-1), 5=3494/0-5-8 (min. 0-1-14) Max Hoz 1=-77(tC 7l Max Uplift 1 =-41 s(LC 9), 5=-347(LC 9) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-76341594.2-3=-5255/501. t1O=-50421491. 4-1O=-515AA82.4-5=-4996/435 BOT CHORD 1 -1 1 =-408/6031 , 9-1 1 =-408/6031, 9- l 2=-408/6031 , 8-1 2=-408/6031 , 7-8=-28AF9Q4, 5-7=-28013904 VVEBS 3-8=-496i5397, 4-8=-1151542, 4-7=-321161 ,2-8=-21991129, 2-9=-12612840 NOTES 1) 2-ply truss to be connected together with 10d (0.131'13") nails as follows: ToD chords connected as follows: 2 X 4 - 1 row at G7-0 oc. Bottom chords connected as follows: 2 X 8 - 2 rows at G2-0 oc Webs connected as follows: 2 X 4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply toply conneclions have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Wnd: ASCE 7-05; 90mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45fr; t=24fti eave=4lt; Cat. ll; Exp B; enclosed; M\MRS (all heights); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=I.60 plate grip DOL=1 .60 4) TCLL: ASCE 7-05; Pf=35.0 psf (flat roof snow); Category ll; Exp B; Partially Exp.; Ct=1.'l 5) Unbalanced snow loads have been considered for this design. 6) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 35.0 psf on overhangs non-concurent with other live loads. 7) This truss has been designed for a | 0.0 psf bottom chord live load nonconcurent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-G0lall by 2-G0 wide will ft between the bottom chord and any other members. 9) This truss is designed in accordance with the 2009 International Residenlial Code sections R502.1 1.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) This truss design allows for the following max. bolt holes along the member c/lines spaced a min. of 0-6-0 apart: 0.500in in the top chord, 0.500in in the bottom chord. 1 1 ) Hange(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 2383 lb down and 1 14 lb up at 1-11-4,and2050lbdownand114lbupat 3-11-4,and3492lbdownand414lbupat 5-11-4onbottomchord. The design/selection of such conneclion device(s) is the responsibility of others. LOAD CASE(S) Standard Continued on page 2 GEfg September 4,2012 [, wenmra-vrl.19 d6iga pd"":@etrc czdREADJlDr&s ofi l''lsrtrD'ltrtuDED I'ITEKREFEREIWE FAGEWI-7479 BEFORE {iSE Design volid for use only wiih MiTek conn€tots. This design is bosed only upon poromeletr shoM, ond is for on individuol building componenl. Applicobiliiy of d$ign poromels ond proper incqporclion of componenl is rsponsibility of building designer - nol tru$ designs. Brqcing shown is for loterol supporl of indMduol reb membere only. Addiiionol temporory brocing lo insure stqbilily during consiruclion is lhe responsibilliiy of ihe er*lor. Additionol pemonenl brqcing ot lhe ovenll slructue is fhe responsibilily ot lhe building designer. For generql guidqnce regording fobricolion, quolily conlrol, sloroge, delivery, ereclion ond brocing, consull AilSl/TPll Quolt Ctileda, DS8.89 ond ECS| Sulldlno Componenl Sqie|ylnfdmaflon ovoiloblefromTrussPlolelnsiitute,TSlN.LeeSheel.Suite3l2,Alexondio,VA2El4. lf Southefn Pine l$P or SPo) lumber ir sDecitied, the d€siqn ruluer lre those ettective 0O0li20r2 by ALSC or Drooosed by sPlB. - -r!. llllMiTek' 7777 Gr6nback Lane, Suite 109 Citrus Heights, CA, 95810 lob t115€.'t2 Truss fruss Type )OMMON TRUSS otv 2 FallCreeU626Tanglewood/g-4/JR( lD)R R3509551r ComDC ldaho Falls. lD 83401 7.250 s \u9252011 MiTek lndustries, Inc. Tua Sep 04 14:35:332012 Page2 lD: EePgszKgVQpofryTSCn\/v?QdGyh-U5-XF3horuJfol PRWI l4fbsSnKmjx-pQzTZOxQjKmygyTo LOADCASE(S) Standard 1 ) Snow: Lumber Increase=1. 1 5, Plate Increase=l.1 5 Uniform Loads (plf) Vert:'l-3=-86, 3-6=-86, 1-5=-16 Concentrated Loads (lb) Vert: 8=-3492(8) 1 1 :2383(9) 12=-2050(B) [, wenmarc.votyg d6ig^ pq,":@etw andREADJuorhS olyrfirsrlD rj\rictwaD rrIrEI< REFERETTCEPAGEfr[I7479 aEFoRE ttsE Design volid for use only wilh MiTek conn@1o6. This design is bosed only upon pororefe6 shoM, ond is foron individuolbuilding componenl. Appl-icobiliiy of d6ign porometen ond properincorporolion of componenl is rsponsibilily of buildingdesignq - nol lru$ designer. B.ocing shown is i6r bterol'supportif individuolreb membeG only. Addiiionol lemporory brocing to insure stobilily during conslruclion is the responsibillily of the errcton Addiii6nol pmoneni brqcing of lhe overqll slrucluE is lhe responsibilily of lhe building designeL For-g-enerol guidonce regording fobricqtion, quoliiy;onirol. sloroge, deiivery, ereclion ond brocing, consull ANSIAFII Quonty C.il,edo, DS8-89 ond BCSI lulldlng Componenl Sqle|yInlqmqllon ovoiloblefromTrussPlqleInsiilulq781 N.LeeSlreel,Suile312,Alexondrio,VA22314. it sorit'trliir'iiinli SF oi !Pol tumber ir rpecified, tha d€$iqn valuei lre those eflective 0$r'01r'201 ? by ALSC or proposed by SPIB' - -!t!. MTMiTek" 7777 Greenback Lane, Suite 109 Citrus Heighb, cA, 9561 0 Snate Riwr truss a Components, tdaho Falls, lD 83401 Job t1156,-12 Truss fruss Type SABLE Itv 1 FatlCreU626Tanglawood/g'4/JR(lD)R' R35095517 4r4 - # DEFL in (loc) l/defl Ud Vert(LL) -0.04 9 n/r 12O Vert(TL) -0.05 9 n/r 12O Horz(TL) 0.00 8 n/a nla SPACING Plates Increase Lumber Increase Reo Stress Incr 2-0-0 1.15 1.15 YES Code lRC2009/TP12007 LOAoING (Ps0 TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL 0.0 LUMBER TOP CHORD 2X4 DF No.1&Btror DF 1800F 1 6E BOT CHORD 2 X 4 DF No.l&Btr or DF 1800F 1 6E OTHERS 2X4DFStUd/Std \A/EDGE BRACING TOP CHORD BOT CHORD PLATES GRIP MT20 220t195 Weight: 59 lb FT = 0% Structural wood sheathing directly applied or 6-0-0 oc purlins' Rigid ceiling directly applied or 6-G0 oc bracing lr!iTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer 15), 13=270(LC 2), Left: 2 X 4 DF Slud/Std, Right: 2 X 4 DF Stud/Std REACTIONS All bearings 12-0-0. (lb) - Max Horz 2=-68(LC 9) Max Uplift All uplift 1OO lb or less atjoint(s) 2, 8' 13' 14' 11' 10 Max Grav Al rea;io;s iso to or ns! ar joint(s) 12, 14, l O except 2=395(1C 15), 8=395(LC 1 1 =270(Lc 3) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown' NOTES 1) Vvind: ASCE 7-05; gomph; TCDL=4.2psf; BcDL=4.2psf; h=25n; B=45ft; L=24ft; eave=2ft; cat. l|; Exp B; enc|osed; MvvFRs (al| heights) and C-C Corner(3) -1-7-O to i-$0, Exterior(2) 'l-5-O to &O-0, Come(3) 6-0-0 to gtO-O zone; cantilever left and right exposed : end vertical left and right exposeJ;C-C for members and forces & M\MRS for reactions shown; Lumber DOL=1'60 plate grip DOL=1.60 2) Truss designed for wind toads in the plane of the truss only. For studs exposed to wind (n-orm€l to the face), see Standard Industry " c;#;;";;ir" "" "ppri""ur", or consutt quatitied buitding designer as per ANSt/TP.l 1-2002. gl iclL, nscE z_os; pf=35.0 psf (fler roof snow); caregory il; Exp B: partia[y Exp.; ct=1.1 +i Unoalanced snow loads have been considered for this design' 5) This iruss has been designed io-r ;i"J", ot rin roof live loa-d of '16.0 psf or 2.oo times flat roof load of 35 0 psf on ovemangs non-concunent with other live loads. 6) All plates are 1.5x4 MT20 unless otherwise indicated' 7i Gai:le requires continuous bottom chord bearing. 8) Gable studs sPaced at 2-0-0 oc. sj Tnis truss nas ueen designed for a 1o.o psf bottom chord live.load noncrncunent with any other live loads' 1o) . This truss ha, b""n o"rign"d fora live load of 2o.opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members' 11)Thistrussisdesignedinaccordancewitfirhe2OO9 International Residential CodeseclionsR502 11 1andR802 102and referenced standard ANSI/TPI 1. 12) This truss design allows tor ihe following max. bolt holes along the member c/lines spaced a min of 0+0 apart: 0'500in in the top chord, 0.500in in the bottom chord. LOADCASE(S) Standard 3t"r'deH# September 4,2012 - -!!" 7777 Grenback Lane, Suite 109 Citrus Heighb, CA, 956'1 0 @efm md REnD l\rc,ras or rfirs .dryD !I$LaDED urnEI<RBFEREItcE PicE DrII'747s BBtoRE lJsE Desisn volid for use onry with MiTek conn€toF This desisn is bosed :ry-:nlf::1:,"1i.,f,'Ptr;ili^'-1"?lfli*:1'*1::iflliTfiffi:"rlt;*?:'J?':"flii,3lj::8l[Hl#i:",i;"jiil"Jiriill,iEilY,rl'ii#l=J"'"riJiJiiil,!io-ir6l,tv"ro,1irginea".ieno-nofiru$desisns BrocinssrtoM is for totsot supporl of individuot reO mlmbem onryl eaOitionol temporory Oroil;g t; insure stobilitvturing conslruction is the responsibillity of the :,r;"i;;"H;r5;;i;,ffi;;;g:*"tig:r":,**li[*:t':;iifJn'ioir,v5*'.ouai"offiii]:b!;:r".ff:'ig!1i1f;!i,!?3'jllg*" i;iiii-dili^, q,i"iffy ;."irot, storoge, delivery, ereclion ond brqcing, consull ANSI/TP|| quoffy wdo, urD'ot qnr soiefvlnldmallon ovoilobleltomr."il"il,rntriiurJ'78! N l-eeiteet suite3l? Alexondrio'vA22314' ' sourhern pine tspor spp) runberl;';i;;;iil;."tih;;;;ii;u;i;;;;;;ti;l; ;r6;iit,06'01 201? bvAtsc or proposed bv sPlE Snake Ris Truss & Componenls, ldaho Falls, lD 83401 Arg ,5 rol 1 MiTei Induslries, |rc. Tue Sep 04 '14:35:36 2012 Page 1 lD:EePgsZKgVQpO\MECnVV?Qdcvh-us-xqkqetwcyjPwqvEcBnSg3QyCmS2ZdQU?4veoxsygyTL {l LOADING (psf) TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL O.O LUMBER TOP CHORD 2X4DF No.l&Btror DF 1800F 1 6E BOTCHORD 2X4 DF No.1&Btror DF1800F 1'6E \/EBS 2X4DFStud/Std \A/EDGE Left:2X4 DF Stud/Std PLATES GRIP MT20 220n9s Weight: 50 lb FT = Oo/o BRACING ToPcHoRDStruclura|woodsheathingdirect|yapp|iedor6.0.0ocpur|ins,except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing' REACTIONS (lb/size) 8=842lMechanical'2=605/0-5-8 (min 0-1-8) Max Hoz 2=57(LC 6) Max UPlifi8=-94(LC 6)' 2:77(LC 9) Max Grav 8=884(LC 2),2=619(LC 2) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown , . roi cHoio' 2-11=-868146, 11-12=-816t49, T12:782147,aft=-788t75, 13-14=-762t71' 1 4-1 5=-72A73, *1 5=-567/50 BoTcHoRD2-17=-751744,17-18=.75t744,1C-1a=-751744,10-19-_78|754,19.20-_76176'|' 9-20=-7 Ol7 69' 9'21 -7 41652, 8-21 ='7 4 1652 \ /EBS 4-9=01273,*8=-918198 NOTES il virno: nsce z-05; 90mph; T6DL=4.2psf; BcDL=4.2psf; h=25fi; B=45ft; L=24ft; eave=4t; cat l-!i Exp B; enclosed; MvvFRs (all ' neights); cantitever left ind tigfit "tpo!; ; end veni&l iefi and right exposed; Lumber-DOL=1.60 plate grip DOL=1 60 a icll, A'scE i_os; pr=gs.o pif 1flat roof snow); category il; Exp B; partiaily Exp.; ct=1.1 3) Unbalanced snow loads have been considered for this design' 4) This truss has been oesigneo toi greater of min roof live loa-d of 16.0 psf or 2.oo times flat roof load of 35.0 psf on overhangs non-concunent with other live loads' 51 ihis truss has been designed for a 1O.O psf bottom chord live load nonconcunent wiih any other live loads' 6) . This truss has been designed for a live load of 2o.Opsf on the bottom chord in all areas where a rectangle 3-&0 tall by 2-0-0 wide willfit beween the bottom chord and any other members' 7) Refer to gkdef(s) for truss to truss @nneclions. 8) This truss is designed in accordance with the 2OO9 International Residential Code sections R5O2-'l 1.1 and R802 '10 2 and referenced standard ANSI/TPl 1. st i-hi, 6ir d"iign alows for the foilowing max. bott holes along the member c/lines spaced a min. of 0-6-0 apart: 0'500in in the top chord, 0.500in in the bottom chord. 1o)Hanger(s)orotherconnectiondevice(s)shallbeprovidedsufficienttosupportconcenlratedload(s)16lbupat 1-914,8'llbdoiln-' ,naia it'rp "t 3-3-4,40 ro oown and it to rp "i 4-t.14,299 lb down and 44 lb up at 6-7-4, and 160 lb down and 34 lb up at 6-9-14, and 273 lb down and 48 lb up at $&14 on top chord, and 10 lb down at 1-9-14,42 h.down at 3'34,32lb down at +3-14' iOfOab*n al 6-7-4,and lgtbdownet 6-$14,and lblbdownat 9-3-l4onbottomchord. Thedesign/selectionof such connection device(s) is the responsibility of others' 1 1 ) In the LOAD CASE(S) section,'loads aiplied to the face of the truss are noted as front (F) or back (B)' LOAD CASE(S) Standard Continued on Page 2 lob 111fi-12 Truss cRl 'russ Typ€ )IAGONAL HIP GIRDER otv Plv 1 Fallcre€k/626Tanglewood/9-4/JR(lD)R R35O9551 € ,50 s A6 25 2011 tvtiidX tnoustries, |rc. Tue Sep 04 '14;35:36 2012 Page DEFL in (loc) Udefl Ud Vert(LL) O.o2 2-10 >999 360 Vert(TL) -0.03 9-10 >999 24O Hoz(TL) 0.01 8 n/a n/a vMnd(LL) 0.01 9-10 >999 24O SPACTNG 1-0-0 Plates lncrease 1.15 Lumber Increase 1.15 Rep Stress Incr NO Code lRC2009/TP12007 ,19*w September 4,2012 - -t!" MIIEK 772 Gr@nbaek Lane, Suite 109 cilrus Heights, cA,95610 ,lL WenrmfA V*i.lV d*ign pwtn ru d READ l\IOTEg OI{ II,IS .AI\TD IJVCT, UDED I{IIE,( REFEREIYCE PAGB ]nI'7473 AEF ORE ItsE' Desisn vorid ror use onrv with MiTek conn4ro6. This desisn is bore9 try- Yl9ili91"J,?f;.tL"n'.fl19,11,1?l*i::Y?i3 ::'f113."3[ff:".1t;*ffi:?.,:"flli';iJffi'#lliii:Hi#$;ffi;&ii,;i#;;;6ii'Jir,l 'iip"",'t'litv or bujrd-nsdesisnq- noi trusdesisner. Brocins show is for tolerot support of indlviduot reb mEri'0"* ontyi euoitionot tempo,ory oroliig t; insue stoui$ty-during-conslruclion is ihe responsibillity of lhe erstor. Addiiionol pemonent broctns;i Ihe oveloil structure is theiesponsibility ;t the building desigher' For-g-endol guidqnce regording robricoiion, quotity cont,ol, .rorogr oJl';ryj-.;J;; ;; ;;.;ts, ;;!Ji r'rstnrn Owni cttt-taq, DSI-89 ond BCSI Sulldlno Compscnt s;fiil'';;;i;;' ou"iroUr" rro,i r.ri irtS rnsiirure. Z8t N. ree Streer, Suite 3l2. Alexondrio. vA 22314. 1 sourhern pine ( sp or spp) rumberi;';;;;;i;l:ih;;;;r-qn v;iu;; ;re rh;;; ;*;;riv; 06 01 ?01 2 bv AL sc or proposed bv sHB' Snake Components,I D: EeP gsZKgVQpO\MOCnW?QdGvh-Us-xqkqelwcyiPWqvEcBnEg3QyC mS2ZdQU?4VeOxsvgvTL LOAD CASE(S) Standard 1) Snow: Lumber Increase=1.15, Plate Increase=l'15 Unitorm Loads (Plo Vert: 1-5=-43. 5-6=-43, 2-10=-8, 9- 10=-8' 7-9=-8 Concenlrated Loads (lb) Verr: 11=16(F) 12=-6S(8) 13=-27(F) 15=-434(F=-148,8=-2S6) 16=-260(F) 17=-a(fl 18:19(B) 19=-1a(F) 20=-18(F=-9' B=-9) 21=-5(F) Job t'l156-12 Truss cRl fruss Typ€ )IAGONAL HIP GIRDER otv 1 FallCreek/626Tanglswood/+4/JR(lD)R R35095518 niver truss a Components, ldaho Falls, lD 83401 rug - -!!. tYtt !9N 772 Gr@nback Lane, suite 109 Citrus Heights, CA, 956 1 0 A we*r,or* vtifu daigt puweta md R6ttD JSrES OH rflts.ellll) tlrtctuDED 'dTEKREfEREIWE PAGE MII'7475 BFIORE ttSE' Desiqn volid tor use only with MrTek connrctoc. This design is bosed only upon porqmeteF show, dnd is for on indiv'rduol building component' ^ ^^i^^hilir, ^r ^a.i^- ^^. -.r.^.iJ"i"""iin""-"r"-tion "r compoireht is isponsibjlity of building designtr - nol lru$designer' Brocing shoMffil?,:,,"6]iii:"ij$ii i#:l#Hio"i,#ffoff#filro"n"; ;r ;;6ohJit is ieponsioititv or buirdjns desisnq - nolrus desisner' Brocins shoM is fd lolerol support of individuot reb membeE only. Addilionol temporory oroir-n! tJ insure stouitiV-auring-conslruction is lhe responsibillity of the ;;i;;. ;j;ji.6; ;.mon-ni uro"tng-;i ine tveiott srructure is the iesponsibilify 6f the building designer. For gl?nerol guidonce resordins rdhdcdrion. ouo'tu controt. storoqe, oJ1ierv,ii*]',Jir ".Jot""ins. ";ith lnst/lltt Quqlttv cil€do, Dsl-89 qnd lcsl lulldlne componenli.jfii",jir&]i"Jiii" J-iiJ !t.r"s", diir"ry, Let.on ond brccins. consun aNsttPn Quqltty cdled. $fi;'t;;e;;' ot"ir"urJ t "tii..i itoti tnstitute, zat N Lee sireet' suite 312' Alexondrio' vA 22314' ii'lii'iritiiiii'iiie i sF or iPol rumber ii ip;;iii;4, thedeBign ulues Ere those eff€crive 06'01/201? roo t1156-12 Truss D0'l fruss Typ€ iIP TRUSS Itv I Plv 1 FallcreU626Tanglewood/9-4lJR(lD)R R3509SS19 River Truss & Componenls, ldaho Falls, lD 832101 7.250 s Aug 25 2Ol 1 MiTek Industries, tnc. Tua SeP 04 14:35:39 2012 Page1 lD:EePgsZKgVQpo\/wSCn\^/?QdGyh-Us-MOQyGuz4FenshMzBtwhsh2ahsMymqi3RnSt2YQygyTl hb=1:S.1 1, EI DEFL in (loc) l/defl Ud Vert(LL) -0.39 15 >999 360 Vert(TL) -0.61 14-15 >670 24O Hoz(TL) 0.19 11 nla nta Vvind(LL) 0.13 15 >999 240 SPAC|NG 1-0-0 Plates lncrease 1.15 Lumber Increase 1.15 Rep Stress Incr NO Code lRC2009/TP12007 LOADING (psf) TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL O,O LUMBER TOP CHORD 2 X 6 DF SS'Except' 1-2,1c.11: 2 X 4 DF No.1&Btr or DF 180OF 1.6E BOTCHORD 2X6DFSS VVEBS 2X4DFStud/Std'Except' 4-16,5-'15,7-15,8-14i 2X 4 DF No.1&Btr or DF 1800F 1.6E REACTIONS (lb/size) 1 =3476/Mechanical, 1 1 =32gg/Mechanical Max Hoz 1=30(LC 8) Max Uplinl=-406(LC 9), 11=-371(LC 9) Max Grav 1=3508(LC 1 7), 1 1 =3331 (LC 1 7) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown' TOp cHoiD' 4-19=_n63823,5-1s=-7357t823,5-2O=-7865t872,62A=-7865t872,6-21=-7865t872, 7-21=-78651872,7-22=-73031812,8-22=-72991812,1-2=-7056i800' 2-3=-7048t8o5' 34=-64381732, 8-9=-6301 /705, 91 0=4808/756, 1O-1 1 =-681517 51 BOT CHORD 1'23=-711t6358,23-24=-71116358,18'24='71116358, 18'25=-71116358, 17 -25=-7 1 1 t6358,'l 7-26=-616/5769, 26'27=-616157 69, I 627 =-61615769, 1 6-28=-77 617 355, 1 5-28=-7 7 617355, I 5-29=-7 6517 3A1, 29'3O=-7 65 17 3O1' 14-gO=-765n3O1, 14-31 =-59215651, 31-32=-59215551, 1 3-32=-59215651' 1 3-33=-666/61 39, 1 2-33=-666/61 39, 1 2-34=-666/61 39, 34-35=-666/61 39' 1 1-35=-666/61 39 \ /EBS 3-18=-65/626, +17--1F,A126O,4''t6=-224122O9,5-16=-830/82' $15=-68/694' 6-15=-332135,7-15:83/768,7'14=-879192,8-14='24112298'8-13=-11411137' *12=-4A518,3-1 7=-981/1 1 1, $13=-861/85 NOTES il-wno: nSCe 7-os; gomph; TCDL=4.2psf; BCDL=4.2pSJ; h=25ft; B=45fl; L=34n; eave=4ft; Cat. ll; Exp B; enclosed; MVVFRS (all heights); cantitever bft ;nd right expoled ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) TCLL: ASCE 7-05; Pf=35.0 psf (flat roof snow); Category ll; Exp B; Partially Exp ; Ct=1 1' Lu=5G0-0 3) Unbalanced snow loads have been considered for this design. 4) Provide adequate drainage lo prevent water ponding. 5) All plates are MT20 plates unless otheMise indicated. Oi nis truss nas been designed for a 1O.O psf bottom chord live load nonconcurrent with any other live loads. ii " mis mss has been deJigned for a live load of 2o.Opsf on the bottom chord in all areas where a rectangle 3-m tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Refer to girder(s) for truss io truss connections. Si fnis trusi is designed in accordance with the 2009 Intemational Residential Code seclions R502.1'1.1 and R802.10.2 and referenced standard ANSI/TPI 1. tOi inli truss Oesign allows for lhe following max. bolt holes along the member dlines spaced a min. of 0-&0 apart: 0.500in in the top chord, 0.500in in the bottom chord. Conlinued on Page 2 PLATES GRIP MT20 2201195 MT20H 16s/146 Weight: 222 lb FT = 0% BRACING TOP CHORD Struclural wood sheathing directly applied or 2-6-7 oc purlins. BOT CHORD Rigid ceiling directly applied or 9-4-1 oc bracing ,OY,?' -b</Ae6;w w oF 9* September 4,2012 1il. ,"en-rlE "*,lv daign powatw Qnd READ J\DIES OIV IiIS Itr|I) I lCtttDBD IdIIEK REFEREI$UE PAGB MII 7473 EErORE ttsE -6-esign volid for u* onty *ith tuf.f .onnecto6. This design is bosed only upon pqromeJe6 shoM, ond is foron individuol building componenl' Appiicobitity ot design porometen ona iiopeiincorporc-lior of cgmpoireirl is ieponsibiliiy of buildingdeslgntr - nol lru$ designer. Brocing shoM is for loterol suppoil of individuot reb membea only. Additionol lemporory brocing lo insure siobility during-conslruclion is lhe responsibillity of the ll,.l.iiJi.-ej"a]i,5'.-ii p.i-"n.nior"ling "t the oveiol slruclure is thelesponsibility ot the building designer For-g-entrol guidlnce regording fobricotion, quotity conrror, sroroge. jeiivery. erection ond b(ocing. coniult ANSUIPII Quolty Cril€rro, DSr-8t ond SCS| lundlng Componenl iof.t"i"f-."tt"n' ovoibbte fro; Truss plotb Institute, 78t N. Lee Sheet. Suite 312, Alexondrio, vA 231,1. ii-siiitiiili'i'iiif i sF oi sFot rumueiii ipiiiii.il,-tiJau",sn diu;; ;it thoie efiective 06oli20l? bv ALsc or propssed b)' sPlB' - -!!. MiTel( 7777 Greenback Lane, Suile 109 Cilrus Heights, CA, 956t0 Snak" RGr Tr,rs" & C"mp"nents, ldaho Falls, lD 83401 7.25OsAJ9252011 MiTSklndustnes, InC lueDePw raoJJe4vrz I qse' lD:EePgSZKgVQpOW7gCnVWQdGyh-Us-MOQycuz4FenshMzBtwhsMahsMvmqi3RnSi2YQygyTl NOTES 11)Hanger(s)orotherconnediondevice(s)sha||beprovid.ed.suffcienttosupportconcentrated-load(s)3o9|bdow^1n143 3ogrbdownand42rbupat 4-.r1-4,3o9rbdownano+ztbup-aiirr-l,sogrbdownand42ril,liJ-a-ira'309 lbdownind-42 lbupat 1o-11-4'309 lbdownand42 lbup at 12_11-4,3o9rbdownand42tbupat 14-11-4,sostooownlnJa2to'upat 1&'r1-4,3o9rnioln"no+zibufat 18-t1-4,3o9 lbdownand42 lbupat 20-11-4'309 |b downand42 tbupd 22-11-4,309tbdownand4?tg_uqat 24-11-4,258tbdownand31 tbupat 26-11-4,258 lbdownand31 lbupat 28-11-4'and258 lbdownand31 lb up at 3o-1 1-4, ano zsa rn odn anob ro ,p "t 32-11-i on. bottom cnoro- rne oe"ign/serection of such connection device(s) is the responsibility of others' 12) tn the LOAD CASE(S) section, i*0" "ppri",i to rne face of the truss are noted as front (F) or back (B). LOADCASE(S) Standard i) Snow: Lumulr tncrease=1. 1 5, Plate Increase=1'1 5 Uniform Loads (Plf) Vert: 4-8=-43, 1'1 I =-8, 1'4=-43, 8-1 1 =-43 concentratill:o:t'o['ll, ,.=-.or,r, 1s=-3os(F) 12=-258(F) 23=-3oe(F) 2a=-3oe(F) 25=-3oe(F) 26=-3os(F) 27=-3os(F) 2B=-3os(F) 2e=-3oe(F) 3o=-30e(F) 31=-30e(F) 32=-3os(F) 33:258(F) 34=-2s8(F) 35=-258(F) Fallcre€k/626Tanglewood/9'4/JR(lD)R RgSOgsSl 9 Job Reference (oPtionall .ffit-611 Mffik lndGtries, Inc. Tue Sep 04 14:35:39 2012 Page tob t1156-12 Truss D01 Truss Type {IP TRUSS xtv I Plv ,1 - -!!, MiTek 777 Gr€nback Lane, Suite 109 Cilrus Heigttts, CA, 95610 @ md RsaD J\DIES oI{ Drrs.iurD llvct wBD MITaI( REFEEE TB PAGE Mt'7473 asPoRE LsE Designvo|idforUreonlywjthMiTekconnectoF.Thisdesignisbosedon|yUponporometereshoM,ondisfqonindividuo|bui|dingcomponenl.AoDlicobitiv ot desEn poro-.r.o o,ii Jo-p-"iincorporc-tior or cotpd*tjt'lip"niiOilitv jiu'ilaing a"'igns- noi lrus desisner' Erocing shom is for 'oteror supporr ot inaiuiauor reo'irliEin"";Ui.99ttl",f':."*?:*?l'',:J:,t"J:ff"''l*:'yr:::l+::nt$ilJilffJ:T;:l:llly " ""is for loterol supporl of individuor reD mmosoonry'nii,i"iJlii ffJiJJli"il]iriv 5r tn! 6"ital^s deiisner]or-generol guidonce resordins ifi::"Ji,A::l':iffi j,.'ir"1.',iit?!ii.:'A.!i."-tiJ" ""I uid"i".g. ."ni'rt - rhiiniiriwrni in-Jt. osr-8e ond rcsr Eurdrno componenr ;:rifiinH:ih+tg',,'ffi '$: ltH*i''"#'*,'"''x;:!'#lff R 1! 8 1 5x4 rl Fatlcreek/626Tanglewood/94/JR(lD)R R35O9S52C r^h aafa.an^a /dnlionell lob 11156,-12 ffuss )o2 truss Type {ip Truss atv Plv 1 Comoonents, ldaho Falls, lD 83401 rD:EePgsZKgVQpow7SCnW?adcv[u5-lnYjha-KnF2pwgTa-KkKmTflKg6lVEkEmMgcJygvTc DEFL in (loc) l/defl Ud Vert(LL) -O.24 10 >999 360 Vert(TL) -0.41 10-11 >991 24O Hotz(TL) O.17 7 nla nta Wnd(LL) O.O9 10 >999 24O SPACING Plales Increase Lumber lncrease Rep Stress |ncr 24-O 1.15 I 4R YES Code lRC2009/TPl2007 LOADING (PsO TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL O.O PLATES GRIP MT2o 2201195 Fl =Oo/o LUMBER TOP CHORD 2X4DF No.l&Btr or DF 1800F 1 6E BOT CHORD 2 X 4 DF No.1&Btr or DF 1800F 1 6E WEBS 2X4DFStud/Std BRACING TOP CHORD BOT CHORD REACTIONS (lb/size) 1=1728lMechanical, 7=1728lMechanical Max Horz 1=81(LC 10) Max Uplift 1=-106(LC 1 1), 7=-106(Lc 1 1) Max Giav 1=2066(LC 20), 7=2066(LC 20) FORCES (lb) - Max. Comp./Max. Ten' - All forces 250 (lb) or less except when shown rop cHoRD 1-13=-387al368; ii-il=-aioliozs' z-iq:aa7leas,z-r5=-z89tryj1-' $-15=-2856/360' 3_16=-2a66t35i, ia-ii=_itae;is/,i-tt=-znassa, t-18=-2473t356' 18-1s=-2468t3s7, 5-19=.2a66/357,$20=.2856/360,6-20=.2887F41,6.21=-3654/385'21-22=-37041373' 7'22=4a741368 BOT CHORD 1-12=-3}5t32si, 11-12=-3O5t3297 , M1=-235t3O44' 9-10=-235130214' 8-9=-29913297 ' 7-8=-29913297 \/EBS2-11=-997t1ls,3-'t1=-46t733,*11-781166'419=-781166'5-9='46/733'6-9=-997/113 Tro*ii, oa".7-05; eomph; rcDL=4 2psf; BcP!=1 2q.tj',^h:2^51; B=45fi; L=34fl: eave=4n; cat' ll; Exp B; enclosed; MVIIFRS-(all. . heights) and c-c Exterio(2) oi-t z lJi-b-s, int"riorit ) s-s-g t; r r -i-ol Er,t"tio<zl 11-2-0 to 27-7-11,Interio(1) 27-7-1 1 to 33-1 1-4 zone; cantilever lefl and right exposed ; end vertical left anO right expoieO;C-C foi members and forces & MV\IFRS for reaclions shown; Lumber DOL=1 .60 plate grip DOL=1'60 2) TCLL: ASCE z-os; pt=gs.o pJ-(n"ai"root .nott1; c"t"gory ll; Exp B; Partially Exp ; Ct=1 1' Lu=5G0-0 3i unoalanceo snow loads have been considered for this design' 4i Provide adequate drainage to prevent water ponding' 5) This truss has b""n o".ign"o ioi"lii.o pJr fottor inord live load nonconcurent wilh any other live loads' 6) * This truss has oeen oesigned-ioi" riu"jo"o ot zo.opsf on the bottom chord in all areas where a reclangle &G0 tall by 2-G0 wide willfit between the bottom chord and any other members' 3l ffl':i1"":'13:*Lf::H:$fr*SlJii"liTi;m Internarionar Residentiar code sections R502.11.1 and R8o2'10 2 and rererenced ,., if,:til3$:if""jtlws ror rhe forowing max. bort hores alons the member dlines spaced a min or 0-6-0 apart: o 5o0in in the top chord,o.sooin in the bottom chord. LOADGASE(S) Standard Structural wood sheathing directly applied or 2-2-0 oc purlins' Rigid ceiling directly applied o!101j o!jra9'n9:.-- wk"rd September 4,2012 --8. MiTel( 77n Gr@nback LanE, Suite 1 09 citrus H€igtrts, cA, 95610 AND:/IfrLUf,EDj'''TEX REF ERETrcE PAGE IU'7473 BBTORE USE' Designvo|idforUseonlywjthMiTekconn€loB.ThisdesignisbosedonlyUponporome|eFshoM,ondisforonindividuolbui|dingcomponent.AoDticobititv ot desgn poro."r"o o,ii pio-p-eiincorpoo-tion of cotp"n*r]t''lipiniiriiitv or ou1'aing aesigns ' not tru$ designer' Brocing shown isior roreror supporr or i^ai'ra,"r *Ji'!#85"'"".r"rvlXiJri:::if:E^;1"".*'iLlg,','#'"'Jt"*'iJ'y,.,:::?q::!:H',il;Jtt$i:':"&15llly "'*is tor lolerol support ot individuol reo. memoers oIilY ^eu"re' 'u fiiv & th;iildi.g deiigner.lor generol guidonce regording i:n:;;*{*ll, rn":5:1"?::55'g$"":"""ff11':x;H:',,1i."J::ffi''"ii;in;i" a;;w idtrb' oss's;e ond 86t sunatns iomp;ent #5i*i*mnwsrrun ;:r runn-lgx'..,''"';:m "m:l *m*1ru Fallcreek/626Tanglewood/94/JR(lD)R R35095521 lob Referere (ootionall - n6)s)ol1Mirek lndustfles. hc. lie sepE 14-522612 Page lob t1156]12 Truss o03 truss Type lip Truss otv 1 SnatenrstrussaComponents, ldahoFalls'lD83401 tD:Eepg5ZKgVepO\MBCnWQdGyh-U5-iMDrKcOD3AQNngrgfTHlO6HXwNg\ Ail2AwkapDsvgyTD bl6 - 1:S 2 14 LOADING (PsO TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL 0.0 LUMBER iop cnono 2 X 4 DF No.l&Btr or DF 1800F 1 6E BOTCHORD 2 X 4 DF No.1&Btror DF 1800F 1'6E vvEBS 2X4DFStud/Std PLATES GRIP MT20 2201195 Weight: 173 lb FT = 0% Struclural wood sheathing directly applied or 2-1-8 oc purlins' Rigid ceiling directly applied o|lGGo oc bracing' Fk recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer BRACING TOP CHORD BOT CHORD REACTIONS (lb/size) 1=178o/Mechanical, 9=178o/Mechanical Max Hotz 1=-101(LC 9) Max Upliftl=-'lO6(LC 1 1), 9=-106(LC I 1) Max Grav 1=2399(LC 20),9=2399(LC 20) FORCES (lb) - Max. Comp /Max. Ten' - All torces 250 (lb) or less except when shown' rop cHORD r-1s=-aenzmo,z-1C:aa1ol380, 2-1d=414s,3,-65,3-16:3860/367, 111-11111133' a_17 =_2868r.ai" 4_18=-2654t334, 5-1 8=-2656/334, 5-1 9=-2656/334, 6-1 9=-2654/334' 6-20=.2868F41,7-20=-3115/333,7.21=.3860/367'8.21=.4149865,8-22=-44101380' $22=-46321370 BoTcHoRDl-14=-298|3994,13.14=.23513317,1i23=.158|2673,12.23=-15812673'1f.-2a=-1 58 1267i, 1 1 -24=-1 5812673, 1 0-1 1 =-229/3317' 9-1 0=-292t3994 WEBS2-14=-605/108,3-14=-271619,3'13='957t124'4-13=-69/910'5-13=-391/'194' 5-1 1 =-391 /1 9a, &1 1 =-69/91 O, 7-11:9571124' 7-10=-27 t619' 8-1 0=-60s/1 08 NOTES 1) Wnd: AscE 7.O5; 9Omph; TcDL=4'2pgf; Bc9L=12P-sjt:15J1; B=45ff; L=34ft; eave=4fi;.c.al ||; Exp B; enc|osed; MWFRS (a|| heighrs) and c-c Exterio(2; g.Gtz td g-b-g, Interioril) 3-s-9 to io-lo-il, exterio(z) 13-10-o to 2+1 1-1 1 ' Interior(1) 24-11-11 lo 33-1 1-4 zone; cantitever en ani ;;;i";p";;J;;"d v6rticat ten ana right exposeo;b-c tor members and forces & MVVFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1 60 2) TCLL: ASCE 7-05; Pf=35.O psf (flat roof snowl; Category ll; Exp B; Partially Exp'; ct=1 1 ', 1u=50-0-0 ii UnoatanceO snow loads have been considered for this design' 4) Provide adequate drainage to prevent water.ponding' . .. ii iiri" t.." rr"'i ueen oesi6neo ioiaio.o fs Ootto.n lnord live load nonconcunenl with anv other lpe loads' 6) . This truss has u"en oesigneo roia live load of 2o.opst on tne uottom cnord in all areas where a rectangle 3-G0 tall by 2-0-0 wide " ririii o"t*""n1ne oottominoro and any olher members' with BCDL = 8'0psf' 7) Refer to girder(s) for tru3s to truss conneclions' g) This truss is designed in accordance with the 2oo9 International Residential code seciions R502 1 1 1 and R8o2'10'2 and referenced standard ANSI/TPl 1. 9) This truss design a||ows for the fo||owing max' bo|t ho|es a|ong the member cy'|ines spaced a min. of 0.6-0 apart: 0.500in in the top chord, O.sooin in the bottom chord' LOAD CASE(S) Standard DEFL in (loc) l/defl Ud Vert(LL) -0.36 11-13 >999 360 Vert(TL) -0.53 11-13 >771 24O Hoz(TL) 0.19 9 n/a nta VMnd(LL) 0.08 11-13 >999 24o Plales Increase 1.15 Lumber Increase 1.15 Rep Stress Incr YES Code lRC20O9/TP12007 k"r9*w 7777 Gr@nback Lano, Suite 109 Citrus HeighB, CA, 95610 @dm and READ lorrs orv rrrs dr\aD IlKLrr,ED MrEr(REFEREtrcE PIGE ,ilt-7473 aEFoRs llss' Designvo|idforUseonlywithMiTekconn@loc.Th.6designi5bosedonvUponporometsshoM,ondisforonindividuo|bui|dingcomponent.Appticobilty ot desrgn poro-"r.o o,iJpiJp-.iinf.ririr"1i- "f ::-poitdtr it t'o*p"n'iUilitv of buildingdesignd - nol lru$ desisnq Brocing sho* is ror roterorsupporr orinaiviouorreoirEriF;-ti99lti9:"1'.'J?:i*:k'FJ:'iil*n'*::ly.::y+::::f"'*lJ,L'iii3'3![1$i]3 " "'is for loterol supporl of indivcluol reo memDffioonry'.t?"^rliJ[lii.i."jJ'li"il'i]iiv 5r ri. trlanJdi_,ign".ior-g-n"rol guidonce resordins ijff:"Ji,A::'J:[['i.Xtri:t3"i,j3lli":;;;."";;Jn ono uio"ing. ""n!,n - iniiriiir o"omi crn-Jlo, DSB-8e ond Eesr Eundrne componenl i:#Jli+rH?i:','""$:'.'Ci:,:, ;l?:jilll''#l*lf"'J'l'ii:';',",5d1?jl"'i:ifl:'oxtffr"1 o' o.'. "' o'"0"".0 o' 'nu September 4,2012 Snake River Truss & Components, ldaho Falls'lD:EePgSZKgVQpO\MSCnVWQdGyh-U5€lLckH2Tbog5l R?Xn"uJVTXMqKALTzqgTO23vlWgyTB -rff r :ls: r il;fi r :lft riffi 'J;5;' -'r 1a# r' - f;* r til-'% t'ffi t t3-13 5-3-13 ,.*F t6 sxg --- MT20 2201195 MT'I8HS 220t195 Weight: 190 lb FT = 0%o Struclural wood sheathing directly applied. Rigid ceiling directly applied or 10-0-0 oc bracing 1 Row at midpt s-'17,8-16 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer LOADING (psf) TCLL 35.0 (Roof Snow=35.0) TCDL 8,0 BCLL O,O LUMBER TOP CHORD 2X 4 DF 24OOF 2.0E'Except- e-7:2X4 DF No.1&Btror DF'1800F 1.6E BOTCHORD 2x4DF No.1&Btror DF 1800F 1.6E"Except' 12-15:2X4 DF 2400F 2.0E \ /EBS 2X4DF Stud/Std'Except- BRACING TOP CHORD BOT CHORD VVEBS 8-15: 2 X 4 DF No.1&Btr or DF '1800F 1.6E SLIDER Right 2 X 4 DF No.1&Btr 1800F 1.6E 4-8-1 REACTfONS (lblsizel 2=1g25lo-5-8 (min. 0-2-15), 12=18951G5-8 (min 0-2-9) Max Hoz 2=121(LC 10) Max Uplift2=-152(LC 11), 12=-152(LC 11) MaxGtav 2=2747(tC 21)' 12=2717(LC 21) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown - - - rOp CnOiO' 2-1s=4ga4t282,19-20=-4880/286, 3-20:4811,3ia1,3-21=-44841288' 421=-43321289' 4-22=-431gt2g1'5-22='41741301,5'23='3249t269,6'23=-32171289'6'7=-28191282' 7-8=-32691292,8-24=-77741483,*24=-79251471'9-10=-77381430'10'2!=-77621425' I 1 -25=-7912t 422, I 1 -26=-8498/466, 26-27 =-8561 1454' 12-27 =-8637 I 449 BOT CHORD Z-1a--1sot4255, i a-Zs=-l glls5o6, 28-29=-1 31 /3506, 17-29='13113so7, 1617=-44t2814' 15-16=-14914100, 14-15=-37O177 12, 12-14=-37 1 17696 \ /EBS 3-ft=-622t97,5-18=-6/749, 5-17='1141t138,@17=-54/447, &16=-701655' 7-16=-12511179,8-16='22751184,8-1 5=-21 3/4689, 9-1 5:584/89' 1 1 -1 5=-481l80 NOTES.l) wnd: ASCE 7-05; gomph; TCDL=4.2psf; BcDL=4.2psf; h=25fi; B=45ft; L=34ft; eave=4fi; Cat. ll;.Exp B; enclosed; MVVFRS (all heights) and C-C Exeriorlz; -r-s-ts tb t-to-0, tnteri;(1) t-10-o to 1e6-0, Exterio(2) 16-6-0 to 17-6-0' lnterior(1) 22-3-1 1 to 3$6-13 zone; cantilever left ano rignt exposed ; eno verfical lefi ind right exposed;C-C for members and forces & MVyFRS for reac{ions shown; Lumber DOL=1 .60 plate grip DOL=1.60 2)TCLL:ASCE7-05;Pf=35.Opsf(flatroofsnow);Categoryll;ExpB;PartiallyExp;Ct=1'1'Lu=50-0-0 3) Unbalanced snow loads have been considered forthis design' +i inis iruss nas ueen designed for greater of min roof live load of 16.0 psf or 2.oo iimes flat roof load of 35.0 psf on overhangs non-concunent with other live loads' 5) Provide adequate drainage lo prevent water ponding. 6iAtl plates are MT2O plates unless otherwise indicated. zi fni! truss nas been designed for a 1o.O psf bottom chord live load nonconcurrent with any other live loads' 8) * This truss has been designed for a live load of 2o.opsf on thetottom chord in all areas where a rectangle 3-&0 tall by 2-G0 wide-' wiltiit between the bottomihord and any other members, with BCDL = 8'0psf' g)dea1rng-aiioint(s)l2considersparat6iioirainvatueusingANSl/TPl langletograinformula. Buildingdesignershouldverify capacity of bearing surface. 1O) This truss is designed in accordance with the 2oo9 International Residential code seclions R502.1'1.1 and R802'10'2 and referenced standard ANSI/TPl 1 Continued on Page 2 ,ob t11!fi-12 Truss D04 fruss Typ€ lip Truss otv 1 I Fallcreek/626Tanglewood/9'4/JR(lD)R R3509S522 ID t .Zn s eugZS ZO'tl MiTek Indusiries, |rc. Tue Sep 04 14:35:f-2-?11.lagf; SPAC|NG 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Incr YES code lRc2009/TP12007 Vert(LL) -0.65 15-16 >621 360 Vert(TL) -0.93 15-16 >433 24o Hotz(TL) 0.51 12 nla nla Wnd(LL) 0.13 15 >999 240 Qtr#oFd September 4,2012 777 Gr@nback L8ne, Suite 109 Cilrus Heights, CA,95610 @ffi @dREADrrprEs oilrttrsintD IInLUDED tIfE <REFEREIuEPTcE *fl1'7473 BEFoREllsa Design volid for use only with Milek conn€1o6. This design is bosed only upon poromeleE shoM, ond is for on individuol building component' Aoo1cobitiv ot desisn poro-.t"o on-i piJp!;il;;&i";;i99mpo'neiriis ieponsiuilitv of buildjngdesigns- nol lrus desjsner' Brocing shoM ;#;;,il'*il;i;;i'd;-?i'1fLdlF.+"..iy:"i.:*p:"ln:?.'::f":,l",fJ:,i?ilY',,",":g"ll'y":#?::::'l#i;,it'ffJ:'H:15lllg""':,gi$:ili::i##i ;!l#Hiil:itiri".;iin-Ji,i'Jiirr ,i-ii"-''ln.?"ipi",roititv 5t the buirdins de-sisnellor-s-eneror suidonce resordins fobdcotion, quotiiy controt, storose, o""tii"ry:-;J;;;;ilJt"s, ;Fi llsrrrn Quqlty Cnedo, Ds!-89 ond BCSI Eundhq comps.nl !-kfnt'ndhn dwdilddafrdmrrussPEt;lnstituie,TSlN.LeeStreet,Suile312,Alexondrio,VA223l!.. ..^^i.r"r"i"r-i"in""' ovoiloble fro; Truss Plote Institule, 781 N' u sorirtrErn Pine (sP or sPp) lumberi! !!!9!!!9!!!!!jlei ;;;H;;; ;'iiitG'ob ititotz uv rusc or proposed bv sPlB, Snake Rirer Truss & Components, tdaho Falls, lD 83401 NOTES 1 1) This truss design allows tor the foilowing max. bolt holes along ihe member dlines spaced a min. of 0-6-0 apart: o.Sooin in ihe top chord, 0.500in in the botlom chord LOAD CASE(S) Standard @!tries, Inc. Tue sep 04 14:35:462012 Page2 lD:EePgsZKgVQpO\MgCnv\PQdGvh-U5€lLckH2Tbog5l R?XnuJVrXMqKALTzqgTO23vlWgyTB lob t11ffi-12 fruss )04 fruss Type lip Truss Qtv Plv 1 FallcreeU626Tanglewood/g/JR(lD)R R35O9SS22 zn " a"o zS ZO't't Mii-ek Industries, Inc Tue Sep 04 1 4:35:46 201 2 Pags - -r!, lflrlMiTek" 772 Grenback LanE, Suit€ 109 citrus Heights, cA, 95610 A,wrnmla v*,yy d6igpp@gmitffiandREADllpfE.SoilI'lIsAr@IlfttDEDffr:E|(REFEREItcEPAGEttIil'747OBwoRE"sE' Tesign volid for ure or*y wtn Mn-t "onneclor. This design is bosed onty upon poromete-F sh-ow, ond i5 for on individuol building componenl' Appt6obit1y ot desrgn poro-"r"o onJ piop"iin"opwii- ot compohent is ieponsibility of buildingdesigns - not iruss designer' Brocing showni#i:;.-;;i{;ffiLdl*:i*^*":l-l*^:'Ir,l**',':xfn:l""lx?t".,,:Js,i?5Ti"*fl'y,.,:::??::::F#lJJ'"':ii:'lS*illg""^" :r$i;;:Xi;f5;;i #;;;;;i;;;;J;i tetvefitt srructure is the responsibiliV or ihe buldins desisner For-s^enerol suidonce resordins fobdcolion, quolity control, storose, oJivl;.;J;;;;Jb;;"qg. .9'!q1 llst/rrtt Quow cltertc' DsB'89 ond ECSI lutdlns Componed ;i$i;i;;-d;' ouqil"6rt rro; iruss plole hstilule. 78t N Lee street. suite 312' Alexondrio' vA 22314' rt sourhern Prne {sP or spp} tumuer ii'ii,;iiil;,iffid;;b. *it;; ;A$;; ar Truss & components' ldano halF' lu usu I rD:Eepg5zKgvepo\MScnwe;Gyh-u5-b7-t-Mgz4JTpwpctgiluJMzY^ysA7-?ARglmrMY0MPygyT9+ )tv I Plv 1 FallcreeU626Tanglewood/H/JR(lD)R R35095523lob t11fi-12 fruss )o5 Truss Type Special Truss niver fruss A Components, ldaho Falls, lD 83401 250 s qug LOADING (psf) TCLL 35.0 (Roof Snow=35.0) TCDL 8.0 BCLL 0.0 - SPACING 2-0-0 Plates Increase 1.15 Lumber Inclease 1.15 Rep Stress lncr YES code lRC2009/TP12007 cst TC 0.94 BC 0.97 vl/B 0.94 (Matrix) DEFL in (loc) l/dell,4 uq PLATES GRIP ffi'd-- ---',dhs5 MT18HS 2201195 Weight: 169 lb FT = 0% Vert(LL) -O.49 12'13 >E21 3bu Vert(TL) -0.88 12-13 >458 24O Hotz(TL) 0.43 10 nla nla VMnd(LL) O.17 12-13 >999 24O LUMBER TOPCHORD 2X4 DF No'1&Btror DF 1800F 1 6E BOT CHORD 2X4DF No.l&Btr or DF '1800F 1 6E \ /EBS 2X4OF Stud/Std'Except* 6-12:2X4OF No.1&Btr or DF 1800F 1 6E REAGTIONS (lb/size) 2=1865/0-5-8 (min. G2-0), 10=1865/0-5-8 (min' G1-14) Max Hoz 2=125(LC 10) BRACING TOP CHORD Strucluralwood sheathing directly applied' BOT CHORD Rigid ceiling direclly applied or 1GGo oc bracing' Except: \A/EBS 2-2-0 oc bracing: 10-'12.'l Row at midot 3-13, 6-13 ff4ifef.,econtmenAs that Stabilizers and required cross bracing be installed during truss ereclion, in accordance with Stabilizer Max Uplift2=-152(LC 11), 10---152(LC 11) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown' rop cHbio' 2-15=-31i4t23s, +'t5=-2974t266,3-1d=-22O71231, 1617=-2O481243, 4-17=-1992t257 ' 4'5--21151327,5-18=-17301257,6'18='18631244'6-19='51181424'7'19='51931411' 7-8=-5068/367, 8-9=-5203/358, 920=-5520/463, 10-20='56181447 BOTCHORD2-14=-14512639,13-14=-145t2639,12-13=-116t26o4'10-12=-37115012 vrnes 3-'14=Ot295,T1i=-s75112s,4-13=-8431174,&13=-1638/'160' 6-12=-17713142' 7'1 2='394t101' V12=-277 I 131, 5-13=-2521 17 17 NOTES 1 ) Vvind: ASCE 7-05; gomph; TCDL=4.2psf; BCDL=4.2psf; h=25fu B=45fr; L=34ft; eave=4ft; Cat ll; Exp B: enclosed; MVVFRS (all heights) and c-c Elnerio(2) -.t-o-rCii r-r oo, Inreri;(1) 1-10-b to 17-o-0, bderio(2) 17'o4lo 2o4''13 zone; cantilever left and right exoosed : end vertical tet ano rigfiilxposeo:i-C tor m'emuers and forces & MVIFRS for reactions shown; Lumber DoL=1'60 plate grip DOL=1.60 Zl iCi-i nSCe Z-05; Pf=35.0 psf (flat roof snow); Category llj Exp B: Partially Exp ; Ct=1 1 3) Unbalanced snow loads have been considered for this design' ;i il;; ft;h"; t;en oesisneO tor greater of min roof live bal of 16.0 psf or 2.oo times flat roof load of 35.0 psf on overhangs non-concunent with other live loads. 5) All plates are MT2O plates unless otherwise indicated' oi itrii truss nas ueen designed for a 1o.o psf bottom chord live load nonconcunent with any other live loads' n r This truss has been designed for a live load of 2o.Opsf on the bottom chord in all areas where a rectangle 3-&0 tall by 2-G0 wide willfit between the bottom chord and any other members' 8) Bearing at joint(s) 1o considers paralel io grain value using ANsl/TPl 1 angle to grain formula. Building designer should verify capacity of bearing surface. 9) This truss is designed in accordance with the 2oo9 Inlernational Residential code sections R502.1 1.1 and R802.10 2 and referenced standard ANSI/TPl 1. roiiti"l.r. o"rign altows for the foilowing max. bolt holes along the member c/lines spaced a min. of 0-G0 apart: 0 500in in the top chord,0.500in in the bottom chord. LOAD CASE(S) Standard {9 woF e* September 4,2012 - -!9" lvtt t9^ 7777 Gr€nback Lane, Suile 1 09 Citrus Heigrns, CA, 956'10 A wrR,||'rvc . ytriJv deiga pfroctwad READ rrK,rES Orr' tttts ,llrD rrrtct wED ',fTBX< REFERETfrB FAGB MIL747I BESORE IISE Desisn volid ror use onlv with MiTek connstoE. This desisi is bosed onv-:nlgg:lif,*:$1"9,*"i'-t?#:,i::1*1::iflH.T[:;:"SL* ?:'J?.,:"f iifl'j|.':illffil"Ti:",i;"Uft"":il$il;li"; ;i;;dJl'Ji'r-ri ,L-p""iioiritv or ouitains aesisner - not tru$ desisner. Brocins sho* is for loterol supporl ot individuotreo mEmLen only. edditionot temporory uroili! to insure stobility-during conshuclion is the responsibillity of lhe er<tor Additionolpmonent orocing-;ifrr! o-""iorrrr^^iu*-is theiesponsibitiry;f the building designer. For-g-enerolguidonce regqrding fobricotion, quolity control. sioroge. oelv-e;. J;1;;;il 6;;tin-9' cgniull l'lslnnt Quo[lv cd1.1o' DSB'89 ond Ecsl Eundlns componenl i;;i;;;;tu;'.voitoutefroriTrussitotitnriitrt..TslN.[eeslreet,suite312'Alerondrio'^v^A?T)!;-.'b"ffii sE #tFliiiliirit"':ii'Ii,iiiiffi', 6;;;;,s" ";i';; ;;; Orxspncrron?rcrsT O U BHs.Plumb. f,l Ebcr"rLLJ [.f6h. U Firc Inepoetian Requcst: &ec'd gy ?.!F"-". orr*.ris lsRcq. By Plrsne No. Frujecr SfSp',tni* Ns,lac,C bc j lnspcction Type Day /Tim* Req. Aq-L lu arL trpi. lnspec{or'l Rrport n xes.I fomm. tlY ilx fJLt/* rruspbc?rolrtmsC@ IHSPICTOft,S ACTIOI* [:APPRSVED fic.o. tFINAt-) Arn0N *sQf"fif,E*; ,,Kwnrvrn CJ N{TTATPTICASLE il Rl'.lAt n am twrffir$pgcT rttd . Joo Copf ft"rryr*tco,' CmspncrroN?rcKET O Inspction Reque*r: Rec'd By ?.t*i^-t, - Urt a l{ lt Odd*rt lnspction Typ. Day /Time Rrq. /LleA f.e {7 tc ': ..l)'Lt\ltt t.-t Inspector's Rrprt Rss.U fomm. |Nspnf,Tfio ffeMs foNFoRM r0-eprn*ven pwes flY ilr* Req. 8v -- "!:.-, - phone No. tltl - 6"t11.* Pruject Q3.tefzr"4k,lt r4*S pR pennir No. tao olo-lJ . Ll.rlr{ llu. l 4:1! c/ rNsplicT0n's AcTtsN Ml4rnuvrn ilDrs,{pppsvrp ilFrNAr Mc.o. (FINAL) [\ nNorAppLtcABLE ;3 DlDt$grrtNspfcr ACTIoN REQUTRED: l\bl€: . Rec'l Arkw*ledged $}ler,oilicr coftf.p{f,.cafit tbr* Joacopy Pf* " *e.chtcort I rxsprcrron ?rcxgr O U BIdg, tr flumb" fI Ebct. Frur*1,. il Firc G"Inspeclion Reg**st; Rcc'd By L,O+t.r<--.l t flrr Ol-5 11iv{tv __ ! Req- Fy phsneNs. 4n -(a11oJ :f-.f( - Fennir No. -, iaootcl Addr**t Inspection Type _ ') yvj . t.n,e rl'tc ,., i +-(. D*y ffi*n *eq" LL'.e tL k b tc -41tct ru.+ Inrpect*r"r Repcrt W xrr"il fonnm. INSTNTTXD ITEMS CSNrcftM IUAFfRSVNN $U|I6S flv tl t+ fl N/A ill IllsAPfROvrs EJ NOTATPLICAALE ilRl.lAt [f nrs ]r{rr IN$FECT Rer"l .{rtrurwledged ltllis.Sifr CSrF.F{n.Caon rtlar . Jot Copt hf - *q*Elcogr I xru$pn*Tx*ro ?$tKKx'O Jxl Sfrlg. ffi Plxn"rb iX IT Dnrie T-l t*J l"ifr lnrXxeiian i{eq*esi: Ree"d Sy flr*iecl Perrr.lit No. Address lnspeetion Type ilay /Tiine ileq. inrpeclar's Repo$& Res.I comm. II{SPICTTN ITEM$ CONFOftM fi} APPRSVES OWCS I r.J S P[C',]:]tt' S ACTTCH p4PPRAVED fI DISAPPROVEDf n c o. (FrN^Lt fl i*$r&fFLtcASr-E []v Ll N fl Nl^ n F"TNAL L] DIg NOT INSPTCT ACTTCN RrQ{J}RtD: Rrc'l Acknoxlrdged " lrl?'dr - Cfllta Copyr.Fln.c0s3 rcrGf, .Jo& crgf FNtf - tn*ado.l Copf O rrusrncrron rrcxur O F BHs. n nrru tr Elsct.tr Mcctr.Firc D*c tt-?t:lZ, fleq. By Ptrone l*o. -41:?-:b? *q Prnject penuir y6. . tZq 307 UfOnu Inrpector'e Report n comm. ,,/ Z- rNsptcTns mMS roNFogM rc *rp*ovr"n-awcs OY iltt fJt-l*'NSPbCTOR'S ACTION, )zAPPRAVED ile.o. fF FfAt] Aeng1i RfQU!RED: n ill$IsAprnovrD il NT}TAPPI.ICASLE NNHAT nBm t*oTr{$p€cT Rcr"l Actnu*lrdged rC.hih " dt*a Coptr.fa{.G00!rbfo* " J6& Caor m.&nillrtgopr OrNsrmcrrox?rcnnT O Bldg. Req. By Frujrct Address Insp*etion Type Day iTime Req. Inlpertnr's Repcrt K fr*s. r*s'EfTfoITCMSccNro@ LJ rrrrAr-rttuyt:u il fiHAL X":.:T:i:l,r rNsrAprrrcABLE ilnrnNonrispscrACfioN REeUIRED: l...bb$E %-.*% Rec'l flcknu*ledged tr/ifi . ohcr copyF FtF.coot ltf$f. Jo6 Copf fn* " nryrcbf Copr fnspection Erqu.rt, Rec'd By O nrspncrroN TrcKBr I no.3J4 - Uq'79 nit No ll -A,+ l_-_ Address Inspeelion Type D;y ffim* Req. Insprrtnr's Repcrt F rrs il fsmm. Rec'd 8y.Inrpeelion fteq. By Fru.lrct rNspnrrfnrT€Mscot*ffi tlt ilru I]RNAL fl r*r*IN$PH(:rQ&"S ACTIT}N ,-{r{Frnovrn flprsApp*r}v*p fiC.o" TFJNAL) [JnorArp{-tCABLE il PIA riffif rilSpfeTAC?ION tfQUtR$*r Rec't Artrnxrhdfed Whdr . C?hc. CopfF fta cffit rQId! . Jsb Capf ft"trry.darf Co!, Bldg. ? ry*Facrro*"rc*Dr I Lt lr.fech. O Firc i-r orrc _ / /- Z-c-t z_ Pennxl*a, _/ g l4fu t fnrpection &ee U Fy Req. By Projecf Addrr*s lnspeetion Type Day /Time Req. Inspertnr's Rrpart F f,es f} fomm. tf.tspsrTrb, fNs-PEfi:on.s ACT|0N l,cAqPROVED r__.r h,... ^__ Dv il*-al; {f c.o. {Ff[{Ar} f]oIsAPPnovrD Ac?tsr{t€e{jrRgDr t$orArPtfcASLE tlFrfiAt" lloro N0ItflsPrcT Rec'l Aelrowfedeed Utn Ctc6 Cop,lbtor . Job Cop;*rt " **.*116 Xu* In*pection Reqncu: Recd gv O r**p*cTroN?rc*Er I Drtc Phsne Nu" f lg /p / Fennir Na. / Z, (e,?) /_. _ freq. By Pruject*l !f, Address Inspection Type Day/TirneReq _i /-z i-) luspectar's Rrport INSPNCTTO NW ,NSPICTON ,S ACTION Eappnoven _ h,..r trv ilru--n;,A nc.*. {Ffr.,fAL} {JPI$APPR''*D AC?toN*fetJtf;Es: ilNorArKlcAtrt*tl nfi{r fl uu ,Ysr $r$rucT Rec'l Aclnr*ledged f$l{r . Olhct CoorF FrA c0dl rbro* Jobcop,Pf'* " h*relg{r, O rnspacrroxrrcxgrO n BUs. S **effi _,_-r- _r nc No, rruirot -. *9K. .* " ,* Pennit fro. 4 tq -p1-V7 Addrcss In*pection Typ Day ffi*m Req. lnsperlor's Repcrt tr fomm. rnsphrrrsrrrusconffi [Y {fru nN/A Rrq. By il NruALnC"O. {FIr'fAL}ilNOTATFLICABLE fJ srs l{grt},sPrcrATNON 8[8UI8ED: Sign*d Xce 'l Aekrurwhdged H?tfu. Cn*ef CorlrF.FtR,c*xl rHsPfrrpft,s ACTtOt* -{f6pnovEn fl gl1;Apppovrn tbfrcr . Job Coff Fr* " *WrAaf Cet Req- o ,**pacTro* TT'KBT O natc il-r,{_: t?, ,Phone w*. 4 t1 qr?711. . .n. ' @Ya,. rrll*r, \ -tz' .".;*., -.-r r.f \ - . ., * *" "* Fenlril No. ln*pertio* Type Day /Time Req. I I --l?- lnrpecfor's Rrport X firs. ll'lSPSCTfO t TOApFS0VET rwcs n ft c.o. {FtrNAr-} ., vr*n' rn'-'Yrr' il ailAL . .\ fJi{{ITAPFLICASLE r-t nrn rrj, .\ LlrlrmrrL{LAHLH n$ml'}of$$pgCTACTtoN RfQU!RED: Ree "l Astrmwfcdged |iqir . Cbcr Cof,F Fra cftn rtlft . Jo! Cop,'ir*"trt9rCor}0qr Etcc. nb{sh"nfiirr E,:'TIN$P Inspeaion Rcqucst: n*q uyJaKA Fruj,ecr Addmss lnspeeti*n Typ* Oay /Timc Req. lnsprrtor.s Rrparr F ftes U fomm. IilSPSCTTN, II{$PfiCTOR,S ACTION uv ils-m fJ*ppnoven fic.o" {Fnr{AL} AefiCIir RfQUTRFF: ;pa'rsi6rnovxn fi il{rrArp{.tcABtE ilntniltrrlnlspFc? ilFil{At Rcc'l Actnqrwrcdeed ffi"ff'"*rblo[ . Jo& cepr Pt* " trq.Crf Cofr &CTION TICKNT O I BHg. F flumb.ff h Slflrto*ilc*m I Etccr. m --*,,"nfim Insprctnr's R*pnrt fl fprnm. esel gqa* at;trt+ fffi ilnNAr ?E t ll oro ?taove- fi ffil#H*"lblolr. "b6 Corir ** r'+.*iil lff1 : fn*pertfon lypr Da! ffime Req" P*l*o 4ddrsss firu*;T,'i lferarr rya.d{"Jr Insp.cto..s _; t]t O11,Orlil 0ear 1***"*., t*;E *h+ tr 0 Brd;O prurnil TICXE?' rrL, ltdcct. fl fia Prolcet lnspectior Type ?1{ i}mc Re+ &ftes. ''ffi nvE frc.n" {F;A;AI"}tl&t.t4r fl&s lryrnsprcr pt*"u"rG Fennil lio. *lf:3*rrcrffil Plumh. I Eber. lnspclion Rqrcrr Re,.u n., A.- ,, **t' L' M*'r" o rcq.Brl// ;;:,.'-t,i,Y a'IilM(fu**n * fr-tt^-,- :':,--' 13* w 670 -\ttrttE* eddrc*s lqrt 6 TanAlr:,.-,., I nnfi ffo' trZ oOSaq Inrpectfon lype Sr,,r D+flime Req. 16- i1r_ tnspectnr's Repcrt ,,Jtr ffierrn*vEn ffe.o. orr*, {Jor54Pr&ov[0 AfTr0ff**uu,**o, ffl'wrAFALfcAStE ur -Sre& finr'&r" il om lulfisFEc" n"* " **.c"G ffi:#w.- INSPECTIOArTrcrGro Btdg. F Pfumb. Inspection Reguest: Recd By Req. By ,Jil L t, r,v I Dt Phone No. i Pennit No.,2 za'fu7 2lnspeclion Type Day /Time Req. Inspector's Reporf Res.O comm. INSPECTED,T INSPECTOR,S ACTTON Dvffi DAPPROVED trc.o. (FTNAL) ACTTON REQUTRED: frorsanrnovro ONOTAPPLTCABLE DDIDNOTNSPECT DFINAT Rec'l Acknrwfedped ffi;ff'"* - tttor. Job COy pr*-,'q.o.rd tr*ronrrcKnr a no'agyk_o.,, PhoneNo.6 Address lnspection Type Day /Time Reg. Inspector's Report O comm. ^*aatED,, Dtt nN; Reg. By Projecl Pennir No. [Z?Cn |NSPE TOR,S ACTfoN Mppnovro Dc.o. (FTNAL)ODISAPPROVED DNOTAPPLICAELE DFINAL o*ro* *torr*ro.. a, Rec'l AcknowledsJ I't h,t_c . o,taG CopyF.FtR.C@3 Itlorr. Job Cop,ett-rr"eaaorf d INSPECTIOil_ _,rrcKEro Bldg. O pturnh tr enda-Req. By Project Address Date {orr*ouro -'"" trc.o. (FTNAL) DDISAPPRovED ACTToNREQU;RED: DNorAPPLtcAEtE DFINAL DOIONOTTNSPECT Signed Rec'l Ithatr. F.FtR.c@3 Pi*-rr*.arr6 '{) PennirNo. /? aABaV Inspeclion Type Day /Time Reg. INSPECTEO,T INSPECTOR.S ACTION Dv om Inspeclor's Reporf Xpress Bill Pay - Payment Processing Page 1 ofl Billing Information Bryson Higley Bryson Higley , 83401 I I I 1 rt I ITEXSI-IRC +*' i,r:: tr,.r. l,;r'rr,'r .{ .il..::.t,,,i1 City of Rexburg 35 Northist East Rexburg, lD 83440 208-359-3020 40 Col, Frinter J I FgeFd- -!z;A: l Transaction detail for payment to City of nexOui!. - --*** D"t* t1|2Odf/,Z-:ti,,|O;i9 AM Transaction Number: 1 7806501 pT Visa - XXXX-XXXX-XXXX-6325 Status: Successful Description Reference #Amt per ltem # ltems Total Amt BUILDING PERMIT 1200307 $86.24 1 586.24 MECHANICAL PERMIT 12 00536 $130.00 1 St 30.oo https : //www.xpressbillpay. com/commor/paymentprocess.php tt/20/2012 ReceiPt Number:12i0380 ' @lD'83440 Phone (208) 359-3020 t rax (208) 359-3022 RPRSTNB4Ol Permit Fee DePosit genPmtrreceiPts Page 1 of 1 Xpress Bill Pay - Payment Processingo Page 1 of 1 : : :: { t I 1 (} | REXBURGi\{. .1'r;1,!1,1c Jl.irrrll l'rtr''fr:irirll' Citv of Rexburg Ji;HHB'f.1L 208-359-3020 s260.00I l i :,-- Billing Information eryson HigteY Bryson HigleY ryvrylllvL ,83401 W1r) Transaction taken bY: amanda , 40 Col' Printer oit* onazot2 - 5:02:40 ffi.1?T" s1,535.88 https : //www.xpressbillpay'com/common/payment-process'php 712612012 City of Rexburg Receipt Number: Department of Community D""jlo!t"'!! g5 l.lortn 1st East / Rexburg, lD. 83440 Phone (208) 359-3020 / Fax (208) 359-3022 12 00307 12 00307 12 00307 12 00307 12 00307 12 00307 12 00307 12 00307 12 00307 12 00307 12 00307 RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol RPRSTNB4Ol Permit - Electrical Plan Gheck Fee Fire lmpact Hookup Fee/Sewer Hookup FeeNater Park lmpact Fee Police lmPact Fee Street lmPact Fee Water Meter & Parts Building Permit Fee Deposit APPlied $40.00 $2.35 $184.61 $1,700.00 $1,650.00 $800.00 $100.88 $864.57 $317.00 $23.50 -$500.00 Total: $40.00 $2.35 $184.61 $1,700.00 $1,650.00 $800.00 $100.88 $864.57 $317.00 $23.s0 -$500.00 $5,182.91 $s00.00 12 00307 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 12-0386 O7tOSt2O12 Permit Fee DePosit CREDIT CARD $5,182.91 JUL 13 2ol2 XBURG